Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Planning the Black Creek Tunnel Project - RETC2023By Cary Hirner, Tony Cicchetti, Daniel G. Cressman, Jeff F. Wallace, Prapan Dave, Malcolm Sheehan
The City of Toronto is currently undertaking the design of the Black Creek Sanitary Trunk Sewer Relief Project. The Project involves the design and construction of approximately 20 kilometers of tunne
Jun 13, 2023
-
Preventing Stope Back Collapse—Practical Strategies - SME Annual Meeting 2025By Robert Cook, Valeria Zarate, Jason Hallowell
The long hole open stoping (LHOS) method is widely used in underground mining. While methods to predict stable stope geometries are well established, the ability to maintain a stable back often assume
Feb 1, 2025
-
Managing Continuous Improvement Of Mine To Mill Begins With Measurement - SME Annual Meeting 2022By J. Loeb, R. Ramanathan, P. Cameron
All mining operations, including iron ore, maintain a focus of continuous improvement and asset optimisation in their operations. As all the operations in the Mine-to-Mill value chain are inter-depend
Mar 2, 2022
-
Principles And Application Of Air Classification - Basic PrinciplesBy Robert E. Frey
Regardless of the mechanical design features of a particular air classifier certain basic principles apply. Specifically , there are two forces at work: 1. An air drag force 2. An inertial or ce
Jan 1, 1985
-
Phosphate Raw Materials Of TennesseeBy Robert E. Hershey
The phosphate industry is the fourth-ranking mineral industry in Tennessee; it has an annual value of 13,000,000 and a yearly production of almost 2,000,000 tons of phosphate ore. Tennessee, at presen
Jan 1, 1960
-
Low Coke Button Bituminous Coal On Anthracite EquipmentBy J. Ludden
By Sims Some two years ago we began investigating low coke button bituminous coal for use at our Bound Brook, New Jersey plant as a replacement for anthracite. Since August, 1957 the plant has been
Jan 1, 1958
-
Limitations Of Linear Programming Transportation Models In The Study Of Coal AllocationsBy Chin Wei Yang
Linear programming (LP) has proven to be a most effective mechanism for modeling a vast array of practical problems, while the development of LP applications in engineering have been extensive enough
Jan 1, 1980
-
Kennecott Process For Recovery Of Copper, Nickel, Cobalt And Molybdenun From Ocean NodulesBy Dr. Jagdish C. Agarwal
Kennecott Copper Corporation has developed a new hydrometallurgical process for extracting nickel, copper, cobalt and molybdenum from maganese nodules. This process (KCC Cuprion Process) utilizes a re
Jan 1, 1978
-
The Ore Deposits At Copper Canyon And Copper Basin, Lander County, NevadaBy R. W. Sayers
The Duval Corporation porphyry copper deposits at Copper Canyon and Copper Basin, though widely separated, form an economic unit requiring integrated exploitation. Contrasts in mineralization, host ro
Jan 1, 1968
-
Development of a Robust Ultra-Wideband Module for Underground Positioning and Collision Avoidance "Mining, Metallurgy & Exploration (2020)"By RALPH BALTES, AMIR EHSAN KIANFAR, FABIAN UTH, ELISABETH CLAUSEN
As indoor positioning provides particular challenges due to the unavailability of GPS signals, various systems such as ultrawideband (UWB), radio frequency identification (RFID), ultrasound, and wirel
Jul 31, 2020
-
Unique Challenges for the Construction of PATH’s Exchange Place Cross-Passage Tunnel - NAT2022By Todd Kilduff, James Grillo, Shrey Arora
In efforts to improve ingress/egress from the existing subway platforms in PATH’s Exchange Place Station, a new 18-foot horseshoe cross-passage tunnel was constructed by Walsh Construction who retaine
Dec 1, 2022
-
Structural Underpinning an Airport Terminal to Mitigate Tunneling Risk—Atlanta Plane Train West Extension Project - RETC2023By John Murray, Ryan Smith, Daniel Ebin, Robert Gould, Thomas Hennings
The Atlanta Plane Train Tunnel West Extension was excavated at Hartsfield-Jackson Atlanta International Airport using Sequential Excavation Methods (SEM). At its shallowest point, tunnel cover to bott
Jun 13, 2023
-
The Upper Hidden Basin Diversion Project Design and Construction at Terror Lake—Kodiak, Alaska - NAT2024By Jennifer King, Julius Strid, Steve Brandon
The Upper Hidden Basin Diversion (UHBD) tunnel was driven approximately 1.2 miles by the drill-and-blast method primarily through massive granite bedrock geology for the Kodiak Electric Association, I
Jun 23, 2024
-
Analysis and Repair of Failed Copper SX Plant Mix Boxes: An Application of First Principles - SME Annual Meeting 2024By Ron Derrick
SX operators have conducted extensive shut-downs and repairs over the years to mitigate solution leaks from failed stainless steel false floors and walls in rectangular mixersettler mix boxes. Hydrody
Feb 1, 2024
-
Solutions to reduce blast-induced ore loss and dilution at the Ahafo openpit gold mine in Ghana - SME Transactions 2012By A. Tordoir, S. S. Kanchibotla, W. Rogers, E. Engmann, B. Bisiaux, S. Ako
Blast-induced rock mass displacement can have a significant impact on ore loss and dilution. The mischaracterization of the grade boundaries both prior to, as well as a result of, blasting can lead to
Jan 1, 2012
-
3DEC Investigation of the Highly Anisotropic Strengths of a Utah Coal Using Discrete Fracture NetworksBy Bo Hyun Kim, Mark K. Larson
Although techniques and practices of mining are highly advanced, coal pillar bursts or bumps continue to occur. Many uncertainties remain because of the highly anisotropic characteristics of coal seam
Jun 25, 2024
-
Application Of The Rutile Synthesis Approach To A Rock-Type IlmeniteBy Gerald W. Elger
Research at the Albany Metallurgy Research Center has shown that high-purity rutile can be produced from relatively low-grade ilmenite obtained from a massive rock deposit. Ilmenite is first smelted i
Jan 1, 1973
-
Preparation Of Industrial CoalBy Arthur S. Maynard
There was a tendency several years ago for the average coal producer to more or less sit back satisfied with the big utility and metallurgical mar¬kets with long term contracts, not realizing, or poss
Jan 1, 1959
-
The Electroslurry* Process For Copper Recovery From Smelter And Refinery Wastes (7a97db2e-256a-4c35-bf29-c7d9dba93063)By F. A. Baczek
The Electroslurry TM electrowinning concept has been incorporated into a process flowsheet for recovering copper from smelter flue dusts. The process has averaged 96% recovery of the copper as high-gr
Jan 1, 1980
-
Analysis Of Roof Fall Accident Statistics And Its Application To Roof Control Research - The Roof Fall ProblemBy Alphonse C. Van Besien
It is doubtful if anyone knows precisely how many U.S. coal miners have been killed by roof falls. In 1931, 51 miners were killed by falls or rock in every 10-day period (Paul, 1). Roley (2) indicated
Jan 1, 1973