Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Shaft Design Criteria ? IntroductionBy Kot F. Unrug
When reading different studies discussing trends in coal mining, it appears that a substantial expansion of output by the year 2000 is predicted, even in the most pessimistic forecasts. Depletion of s
Jan 1, 1984
-
Optimization Oriented Work Preparation for Sub-Surface Construction Work under Special Consideration of Construction Logistics and Explicit Choice of Procedure and EquipmentBy J. Herhold, S. Plaum
The focus within the economical optimization of projects, which are conducted underground, shifts more and more towards the conduction of construction work underground. Underground operations can be d
Jan 1, 2019
-
The First EPB TBM Tunneling Application in New York City and Its Completion through Superstorm SandyBy Andrew Cho, Changsoo (Kevin) Moon, Richard Flanagan, Brian Larsen
"INTRODUCTION Project Background The U.S. Army Corps of Engineers (USACE)/Port Authority of New York & New Jersey (PANYNJ), as part of their New York and New Jersey Harbor Deepening Project, will dred
Jan 1, 2016
-
Recovery of Metallic Values from Feldspar by Mechanical and Thermal Pretreatment Followed by Acid LeachingBy Nikhil Dhawan, Shrey Agrawal
Feldspar, a low-alumina, and abundantly available aluminosilicate source, is explored in this study to extract aluminum and potassium values. The sample comprises lamellar layers of microcline and alb
May 18, 2022
-
Reliability-Centered Maintenance of Rapier Dragline for Optimizing Replacement Interval of Dragline Components "Mining, Metallurgy & Exploration (2020)"By Snehamoy Chatterjee, Sanjay Kumar Palei, Smarak Das
Machine manufacturers’ recommendations on maintenance strategies of capital-intensive draglines are not always based on real data and therefore lead to losses from downtime. This paper proposes a prev
May 28, 2020
-
Development of Mine Haul Road Surfacing Condition Monitoring Through Digital Image ProcessingBy S. Pastor, S. Hahn
"As the concept of autonomous haulage systems (AHS) moves from proto-types to production-ready applications, the operating performance of the haul road will become ‘mission critical’ to the overall su
Jan 1, 2015
-
Industrial Minerals Review 2012Editor?s note: Each year, Mining Engineering features an industrial minerals review. Several people put in a fair amount of time in developing the material for this issue, all the while doing their ow
Jul 1, 2013
-
Visibility Of Surface Excavation And Impact AssessmentBy V. Dentoni
The paper deals with the assessment of the visual impact generated by surface mining and quarrying. Previous research works proved the applicability of an indirect method based on the elaboration of d
Jan 1, 2008
-
The Suspension Preheater Kiln And Its Control - Introduction:By Joseph H. Herz
Recently, the President of the Portland Cement Association, Robert D. Maclean, gave the keynote address at the Rock Products Eighth International Cement Industry Seminar. He said, after listing th
Jan 1, 1973
-
Characterization and Removal of Iron from Pyrophyllite Ore for Industrial ApplicationsBy S. K. Jena, S. Singh, B. Das, N. Dhawan, P. K. Misra, D. S. Rao
"Iron as an impurity in pyrophyllite ore affects pottery, ceramics and tile quality. We carried out the characterization of a pyrophyllite ore sample using optical microscopy, scanning electron micros
Jan 1, 2015
-
Integrating the Toquepala and Cuajone SX/EW OperationsBy Igor Gonzales G.
The Southern Peru Copper Corp. (SPCC) recently built an integrated copper project consisting of dump- and heap-leaching operations at its mine complex in Peru. The pregnant leach solution (PLS) conta
Jan 1, 1996
-
Recovery Of Iron From Pyrite Cinder By The MTU-Pelletech ProcessBy M. Adnan Göksel
Pyrite cinder is generated by roasting pyrite for sulfur dioxide production. It contains up to 62% iron, but also may contain other hazardous or toxic materials such as Zn, Pb, As, T1, Cd, Cu, Sn and
Jan 1, 1984
-
Cable bridge conveyor: New suspension bridge based conveyor system"Above ground, elevated belt conveyors that span more than 200 m (656 ft) between support points can cross valleys, rivers, forests and buildings with a minimal footprint. The cable bridge conveyor (C
Jan 1, 2014
-
Ball Mill Classification System Optimization through Functional Performance Modeling (0cd38fa2-0cf1-4ba9-9664-36a9951db684)By O. M. Arafat, J. A. Finch
Since its development, the functional performance equation for ball milling (McIvor, 1988) has facilitated a new understanding of industrial circuit cause and effect relationships, leading to signific
Jan 11, 2017
-
Precious Metals In AsteroidsBy David L. Kuck
Siderophyle platinum-group metals and sane gold are a thousand times more abundant in metal and chondritic meteorites than in terrestrial or lunar rocks. Type I and II carbonaceous chondrites contain
Jan 1, 1982
-
Investigating The Effect Of A Mitigation Trench On CO2 Fluxes On A Reclaimed Coal Mine SpoilBy M. Mathiba
High CO2 fluxes associated with reclaimed coal mine spoils pose an environmental hazard where such sites are used for building. CO2 concentrations in excess of 25% have been reported in homes construc
Jan 1, 2010
-
Separation of Rhenium and Molybdenum From Molybdenite Leach Liquor by the Solvent Extraction MethodBy A. Khoshnevisan
Molybdenum resources around the world are mainly associated with porphyry copper ores. Molybdenite (MoS2) is the main Mo mineral that has rhenium in its crystal lattice. This paper investigates the re
-
Managing the Medium Term Mine Scheduling Challenges at Bingham Canyon Mine After the SlideBy A. Moharana
A massive slide at Bingham Canyon wiped out a side of the pit and covered the main haul road in and out of the pit. All pre-slide mine designs and schedules were no longer valid. New designs and sche
Feb 23, 2014
-
Rock Mechanics Study Of A Longwall PanelBy Lewis V. Wade
This paper summarizes the results of the rock mechanics monitoring program performed as part of Old Ben Coal Company's longwall coal mining demonstration project conducted in cooperation with the
Jan 1, 1977
-
Construction — You need risk-based cost estimatingBy A. Moergeli, Philip Sander, John J. Reilly
"Estimating and managing the costs of complex infrastructure projects – in the planning/design and construction phases, for both owners and contractors – has been a challenge for decades. The more com
Apr 1, 2016