Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Coal Beneficiation via the Tapered Fluidized Bed Using Magnetite with a Wide Size Range Mining, Metallurgy and Exploration (57dbcb5f-d720-4602-989e-b44427f0ae7a)

    By Xuchen Fan, Chenyang Zhou, Yuemin Zhao, Liang Dong, Chenlong Duan

    A gas–solid fluidized bed using magnetite particles is an effective methodology for coal beneficiation in the field of dry coal cleaning. Broadening the size range of magnetite used in the bed decreas

  • SME
    New Discoveries at the Red Dog Zinc-Lead Deposit

    By S. Jennings

    The Red Dog zinc-lead-silver deposit is located in the DeLong Mountains of the western Brooks Range in northwest Alaska. The region is located 145 km(90 miles) north of the village of Kotzebue (Fig.

    Jan 1, 1999

  • SME
    Simulation of Material Transport in a SAG Mill with Different Geometric Lifter and Pulp Lifter Attributes Using DEM Mining, Metallurgy and Exploration

    By Alejandro Gutiérrez, David Ahues, Paola Merino, Felipe González

    A Discrete Elements Method (DEM) study of load movement within a SAG mill 12,192 × 7620 (40′ × 25′) in normal operating conditions is performed. The purpose is to determine how the geometry of the lif

  • SME
    Preliminary Design of the Caldecott Fourth Bore

    By Bhaskar B. Thapa, Michael T. McRae, Johannes V. Greunen

    This paper describes the preliminary design of the fourth bore of the Caldecott Tunnels along State Route 24 in Oakland, California. The paper focus is on two major aspects of the project: initial sup

    Jan 1, 2007

  • SME
    Tunneling for the Eastlink Project, Melbourne, Australia

    By Peter Campi, Harry R. Asche, Ian P. Callow, Edmund G. Taylor, P. Scott Smith

    The US$1,850 million EastLink project is a 39km tollway and includes twin 3-lane,1.5km long, undrained driven tunnels. The hard rock tunnels are being built to avoid passing the motorway through the M

    Jan 1, 2007

  • SME
    Disc Cutter Performance in Boulder-Laden Ground ? Introduction

    By D. S. Kieffer

    Ground characterized by hard boulders embedded in soft matrix represents one of the most challenging conditions for TBMs, as the cutterhead must cope with the non-optimal conditions of cutting hard bl

    Jan 1, 2008

  • SME
    Completion And Commissioning Of The SMART Dual-Purpose Tunnel ? Introduction

    By Arthur Darby

    The city of Kuala Lumpur was founded in 1857 by miners seeking tin near the confluence of the Klang and Gombak rivers. The rapid development of the city and surrounding area since independence has led

    Jan 1, 2008

  • SME
    Weinbach Soft Ground Tunnel: Lessons Learned

    By Raymond W. Henn, Kent A. Pease, Glen J. Rorison

    The paper focuses on construction of a 2.55-km (8,365-ft) long, 2.4-m (8-ft)diameter storm drain tunnel in Evansville, Indiana. The tunnel was driven through saturated soft ground varying from clay to

    Jan 1, 2001

  • SME
    Environmental Impacts of Deep Sea Mining: Predictive Assessment Methods

    By Diane Jones, Jeremy Spearman, Tom Matthewson

    Requirements for minerals are on the increase globally and the deep sea offers a potential source of essential materials. Extracting these minerals from what is considered an environmentally sensitive

    Sep 1, 2014

  • SME
    Leveraging IIoT to Improve Machine Safety in the Mining Industry Mining, Metallurgy and Exploration (4481c22f-86ff-4396-9b10-ec9dd65a183b)

    By D. Parks, A. Miller, M. McNinch, R. Jacksha

    Each year, hundreds of mine workers are involved in machinery-related accidents. Many of these accidents involve inadequate or improper use of lockout/tagout (LOTO) procedures. To mitigate the occurre

  • SME
    Analysis of the Hydro-fracture Potential Around Water Tunnels in Rock

    By Emad Iskander

    The seepage forces generated around pressurized water tunnels in rock are investigated using the analysis tools of geomechanics. The theoretical background of the two-phase material behavior is explai

    Jan 1, 2008

  • SME
    Justifying API Bentonite Rheological Behavior Through Its Forming Size Fractions Mining, Metallurgy and Exploration (8673045d-721a-4112-8198-a3a9a24151ef)

    By A. A. El-Midany, R. M. Farag, A. M. Salem, S. E. El-Mofty

    Bentonite represents one of the main players in the stability of the drilling mud. Its particle size and particle size distribution affect the physical properties of the drilling mud especially the rh

  • SME
    Using Administrative Controls to Reduce Tailings – Dam Risk

    By G. H. Glos

    There was a time when an occasional failure of a tailings embankment was considered an acceptable risk associated with mining activities. This is not the case anymore. A major tailings failure today

    Jan 1, 1999

  • SME
    Dry Coal Cleaning With A Magmill™

    By R. R. Oder, R. E. Jamison, E. D. Brandner

    This paper presents preliminary test results obtained with a 0.38 kg/s (3000 lb-hr) beta prototype MagMill™. In processing Upper Freeport coal the beta prototype recovered 82% of the weight of the fee

    Jan 1, 2000

  • SME
    Communication : The missing link in the minerals industry

    By Pat C. Hautala, J. R. Hoskins

    This is a new era for the minerals industry. Never before has there been more need for effective communication. So said Robert Anderson, chairman and chief executive officer of Hanna Mining Co. He was

    Jan 1, 1985

  • SME
    Peru Remains Committed to Its Mining Industry

    By Steve Kral

    Despite low commodity prices and mining industry cutbacks throughout the world, Peru remains one of the industry’s bright spots. The country’s remarkable economic turnaround during the 1990s remains

    Jan 1, 2000

  • SME
    Design And Preliminary Testing Of Low-Energy Planetary Excavator - Preprint 09-134

    Development of a permanent human base on the Moon for exploration requires a self sustaining system. This entails production and processing of limited amounts of raw material on the Moon. Any mining a

    Jan 1, 2009

  • SME
    CART?: A Fundamental Tool For Process Circuit Design

    By A. Noble

    The design of separation circuits can be a complex, labor-intensive and costly process. While the engineer?s experience along with extensive data sets and simulation are crucial tools for determining

    Feb 27, 2013

  • SME
    Virtual Reality Simulator For Training Miners To Install Rock Bolts Using Jackleg Drill

    By J. Warmbrodt, D. Apel, D. Nutakor, L. Grayson, M. Hilgers

    MinerSIM is an augmented reality system with integrated hypermedia that is suitable for training underground miners in the basics of using a jackleg drill to install rock bolts. While statistical evi

    Jan 1, 2007

  • SME
    Rehabilitation of a Brick-Lined Aqueduct

    By Taehong Kim, Carl Pannuti, Nikolas Sokol, Walter Herrick

    BACKGROUND This paper discusses work performed as part the rehabilitation of the gravity flow section of the New Croton Aqueduct (NCA) during an approximately two year period between 2004 and 2006

    Jan 1, 2007