Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Fines Reduction and Its Impact on the Economics of Aggregate Operations
By J. Eloranta
"Previous work indicated that the annual per-capita consumption of raw aggregate material averages about 10 tons; half of which is produced by blasting. Given a population of approximately 320 million
Jan 1, 2017
-
Blast Design and Quality Control Procedures at Atomic Energy of Canada Limited's Underground Research Laboratory
By P A. Lang
Canada is constructing an Underground Research Laboratory as part of a comprehensive program to evaluate the concept of nuclear fuel waste disposal deep in stable rock formations. Careful blasting met
Jan 1, 1987
-
NOx Detection in Video Data Based on Ensemble Machine Learning
By Emmett J. Ientilucci, Martin Held, Xuesong Liu
Mining is crucial for advancing technology and science by providing essential resources and materials. Quarry blasting, a necessary process in mining, releases these resources and chemicals, driving r
Jan 21, 2025
-
The Fundamentals of a Good Electronic Initiation System Program
By Thomas Barkley
Until the recent past, blasters have provided good to excellent results with tools and processes that have an inherent error. These errors can be found in drilling, explosives delivery quality and con
Jan 1, 2011
-
Practical Blasting Damage Investigating for Insurance Claims and Law Suits
By David A. Paul
Over the past several years a great deal of information on blasting vibrations and their effects on structures has been generated. Much of this knowledge has been gained through the use of ground vibr
Jan 1, 1983
-
Confronting Underground Workings Near Open Pit Mines
By Park McLure, Paul Kunze
Abandoned underground mine workings have been regularly encountered in open pit mining excavations for many years, for the most part without many serious problems resulting. During the last several ye
Jan 1, 1993
-
Estimating Damage Caused by Rock Vibration
By Raimo Vuolio
"Over the past 30 years, the Nordic countries have developed similar practices for estimating damage caused by rock blasting vibrations. However, over the last few years the risk of damage has sometim
Jan 1, 1991
-
Blasting 1.5 T of Dynamite, Hang up on a Cliff, 125 m Above a Hydroelectric Power Plant
By Thierry Bernard, Philippe Dozohne
May 13th, in the back country of Nice @arice) collapsed a complete piece of mountain, cutting the RN 2085 and destroying a part of Valabfre’s viaduct. The fist inspections of the site showed that mate
Jan 1, 2001
-
ApplicationofArcGISProinBlast-InducedGroundVibrationAnalysisinanOpenPit CopperMine
By Yong Pan, Purushotham Tukkaraja
It has been well understood that blasting is the cost-effective method for breaking rocks as compared with the mechanical systems. However, vibrations induced by blasting in open-pit mines could pose
Jan 1, 2019
-
Success in Advanced Blasting on the Basis of Sonicity -or- What a Blaster Should Know about Wave Dynamics in Rock!
By H P. Rossmanith
This contribution addresses the advanced blasting technology which is based on wave propagation theory and fracture mechanics. The new concept of sonicity and the principle of maximizing sonicity in b
Jan 1, 2010
-
New controlled drilling and blasting methodology to preserve the central shaft in a copper mining unit in central Perú.
By Samir Garcia, Alain Mestanza
This technical work was carried out in an open pit copper mining unit, located in central Peru, which has a daily production of 440 thousand tons per day. Currently the pit consists of three mining ph
Jan 21, 2025
-
Dynamic Pressure Study to Minimize Misfires at Pueblo Viejo Mine
By Alejandro Rosario, Ricardo Dumuihual, Guillermo Silva, be nito Danial Valde, Carlos Scherpenisse
A monitoring campaign to record dynamic pressures generated by detonation of a single blasthole was implemented at Barrick Gold´s Pueblo Viejo Open Pit mine (PVDC), located in the Dominican Republic.
-
Urban Tunneling for the MWRA's Boston Harbor Clean Up
By Gordon C. Petersen, Gary A. Almeraris
This paper describes the controlled blasting techniques required to mine a rock tunnel section of a main interceptor located in the Boston Metropolitan area. The 3m (10 ft) x 2.8m (9.25 ft) horseshoe
Jan 1, 1991
-
The Specifications said No Blasting
By Timothy Fogarty, Gregory Poole, Roger Reeder, David Switz
This project involved the construction of a new pump station and intake structure at an existing water treatment facility. Although the project involved a significant amount of rock removal, the speci
Jan 1, 2012
-
Analysis of Sympathetic Detonation in Detonating Cord
By Josh Calnan, Paul M. Holmgren, Abigail N. Styer
Detonating cord is a staple of the explosives industry, used widely in the civil and defense industries. Detonating cord is a thin, flexible plastic tube filled with pentaerythritol tetranitrate (PETN
Feb 1, 2020
-
Efficient Blasting for Bench Stability and Fragmentation Results Improvement
By Javier Illanes Pizarro, Gustavo Huerta Valer, Jorge Cárdenas Miranda
Bench stability is the basis of sustainability in an open pit mining operation. Taking care of the pit walls while maintaining fragmentation results can prove a challenge. In this study, technical pro
Feb 6, 2023
-
Efficient and Safe Pre-Split Blasting Through Mechanized Explosive Loading System
By Jorge Cárdenas, Gustavo Huerta, Regina Rocha Oriundo, Miguel Angel Humpire, Johan Salas Flores
Currently a critical activity for slopes stability and safety in mining is pre-split blasting to reduce damage from trim blast. Most common explosive used are based on packaged explosives, with 1 ½ in
Feb 6, 2023
-
Vibration impact reduction to the community through low density bulk emulsion.
By E. Líder, J. Pavez, J. Rivera
The application of new technologies, methodologies, and the use of new products in mining operations is a practice that is becoming more common in the industry every day, added to the new challenges a
Jan 1, 2024
-
The Effect of Charge Mass and Delay Timing on Airblast Overpressure
By Adrian Moore, Dominic Hooton, Alan Richards
Significant factors affecting airblast overpressure (AOP) emissions include charge mass per delay, distance from the blast site, burden, stemming height, and delay timing, topographic shielding, and m
Jan 21, 2025
-
The Testing of Structures and Structure-combinations to be Applied as Explosive-proof Enclosure
By C. Heiss, A. Hofmann
Due to an explosion in an Austrian steel works during the basic oxygen process, the Chair of Mining Engineering and Mineral Economics at the Montanuniversitaet Leoben was assigned with the set-up of a
Jan 1, 2012