    Overview Of The Federal Highway Administration's (FHWA) Deep Foundations Research ? Introduction

    By John L. Walkinshaw

    It is obviously not possible in the time given me today to review in great detail all the research of the past 20 years that the (FHWA) has sponsored or participated in. In this presentation I wil

    Jan 1, 1993

  • DFI
    Finned Piles Response Subjected To Lateral Loading In Clayey Soils

    By Viswanadham B. V. S., Babu K. V

    Wind energy is one of the most economical renewable energy sources. In order to support wind turbines onshore or offshore open-ended monopile foundations are widely used. Unlike conventional structure

    Sep 1, 2022

  • DFI
    Turning the Valley of Ashes into a Tennis Haven: The Development History of the USTA Site in Queens, NY

    By Athena C. Denivo, Pablo V. Lopez, Michael McMaster, Sissy Nikolaou, Alfred H. Brand

    "The paper presents the history of development of the United States Tennis Association (USTA) site, focusing on geotechnical, geoseismic, and foundation engineering challenges associated with it. The

    Jan 1, 2016

  • DFI
    Outline and Application Example of Deep Mixing Meeting High Quality and High Efficiency-Execution

    By Hidekatsu Takeuchi, Masaru Sakakibara, Shigeo Tanabe, Kenji Harada, Akihiko Suzuki, Shoji Morihana

    "Deep mixing (DM) method, one of the most commonly used solidification methods, is based on the principle of solidifying soft ground. It can be classified into two categories such as Cement Deep Mixin

    Jan 1, 2015

  • DFI
    Evaluation Of The Effect Of Vertical Load On The Impedance Function In Seismic Analysis Of Soil-Pile-Structure Interaction

    By Ahmad Mahboubi

    The damage caused by catastrophic earthquakes has always been an incentive towards more sophisticated building codes and requirements. In parallel to computer technology development, the engineers? at

    Jan 1, 2010

  • DFI
    Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, Dc

    By Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey

    Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and

    Oct 1, 2022

  • DFI
    Controlling Thermal Stresses in Barrier Walls

    By Karsten Beckhaus

    Barrier walls in levees and dams are designed and constructed for new structures and for rehabilitation or upgrade of existing structures to control seepage. Construction methods applied are often dee

    Sep 8, 2021

  • DFI
    Development Of Design Charts For Sand Compaction Pile Method Of Improvement For Loose To Medium Dense Sands

    By N. Aarthi, G. R. Dodagoudar

    The improvement of soft clay deposits using stone columns is a well-established ground improvement technique in the western world. This technique has been well documented and has proper design codes f

    Nov 1, 2022

  • DFI
    Innovative Alternate Underpinning Solution for Historic Structure in Boston Suburb

    By Eric P. Bregman, Justin Zarrella, Ryan M. Coulson, Connor Johnson

    Within a prominent Boston, MA suburb are a pair of historic stone and mortar structures built in the late 1800’s. Both the Main House and Carriage House have been maintained and occupied throughout th

    Sep 8, 2021

  • DFI
    Challenges Of Earthen Cofferdam In Deep Excavations For Waterfront Structures, A Case Study

    By Balasubramani M., Ramana P. V., Bairagi K.

    This paper is a case study of an earthen Cofferdam, constructed for a deep excavation at Intake location in river Aaundha, Maharashtra, India. A 12 m (39 ft) deep excavation was made to construct the

    Nov 1, 2022

  • DFI
    Seven Mile Dam Retrofit - A Global Challenge

    By Arvindh Gupta

    BC Hydro proposed to improve the stability of the existing Seven Mile Dam with 54 corrosion protected, re-stressable anchors comprising 92/0.6? strands each, in phase 2 of the program. Being globally

    Jan 1, 2004

  • DFI
    Seismoacoustic Effects Of Driving Large Diameter Piles ? Summary

    By Barry C. Roth

    Driving of large piles in water can impact marine wildlife. Bubble curtains can mitigate these adverse effects. The procedures for and preliminary results of monitoring airborne, waterborne and ground

    Jan 1, 2001

  • DFI
    Utilizing Drones to Improve Project Workflows

    By Barritt Lovelace

    Collins Engineers has been researching and implementing the use of drones on Civil Engineering Projects since 2015. Applications include bridge inspection, asset management, mapping, construction site

    Jan 1, 2019

  • DFI
    A Review On Pedestal Piles

    By Venkatesh S. V J, Shubha M, Srilakshmi G

    Choosing for the best option of pile foundations to overcome large lateral and uplift loads for the foundations in transmission line towers/offshore environment is still being a concern to achieve the

    Sep 1, 2022

  • DFI
    Design, Construction and Design Validation through High Strength Testing (PDA) of CFA and DD Foundations

    By Stefano Pirrello

    "Sydney’s booming real estate market has pushed property developers to invest in historically “no-go” areas, which were previously too expensive to develop. These areas are usually near rivers where t

    Jan 1, 1900

  • DFI
    Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KY

    By Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba

    "Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in

    Jan 1, 2015

  • DFI
    Monitoring of an Embankment Project Using Rigid Inclusions and Vacuum Consolidation During and After Construction

    By Stephen Buttling, Zhong Rui

    "A single unit gas fired power station was being built on the edge of the Gulf of Thailand in 2001. The soil conditions consisted of very soft to soft Holocene Marine Clay, and the site was part of a

    Jan 1, 1900

  • DFI
    Dulles Metrorail/Silver Line (Phase 2) Drilled Shaft Lateral Load Testing Program

    By William Billiet

    "The Dulles Silver Line Phase II is an 11.4 mile extension of the Washington Area Metro Transit Authority’s Silver line in northern Virginia. There are three miles of elevated guideway, which are supp

    Jan 1, 2017

  • DFI
    Design of a Raft Assisted Piled Foundation for a High Rise Prefabricated Hotel Structure in Perth, Wa.

    By Lucie Spencer, Craig Butterworth

    "This paper presents the design of a raft enhanced pile group recently constructed for a hotel development in Perth, WA. At the time of construction in 2016 the hotel was the tallest prefabricated hot

    Jan 1, 1900

  • DFI
    Deep Excavation By Controlled Rock Blasting Considering Ground Condition And Nearby Structures In Ug Metro Station – A Case Study

    By P. K. Ray, Sudip Kumar Koley, Sainath M. Reddy, Devulapalli L. S Rasagna

    Bangalore Metro Rail Project- phase II is one of the technological challenging project, particularly construction of underground metro rail system. The Bengaluru city is very congested area and connec

    Sep 1, 2022