A Tale of Two Dams: Performance of Deep Cutoff Walls
By Donald Bruce, Mark Harris, Wesley Schmutzler, James Sanders
"This paper evaluates the history, construction and most importantly the performance of two remedial seepage cutoff walls installed in two major dams in the United States. Beaver Dam, on the White Riv
Jan 1, 2017
-
Examples Of The Use Of Temporary Works Soil Nailing In The UK And Ireland
By Martin J. Pedley
The use of soil nailing has grown steadily in the UK over the last 15 years and it has recently become more popular in the Republic of Ireland. This paper presents three soil nailing temporary works c
Jan 1, 2000
-
The Advantages Of Arbitration - I. Arbitration Defined
By John B. Tieder
Arbitration is a legally recognized alternate litigation for the resolution of civil disputes. The parties agree, either before or after a dispute arises, to submit that dispute to an independent thir
Jan 1, 1988
-
Tied-Back Micropile Walls In Landslide Repair
By Kevin W. Cargill
In September 2004, Hurricanes Frances and Ivan caused the Pigeon River in western North Carolina to flood. This flooding eroded the embankment below Interstate 40 (I-40) and sent one of the eastbound
Jan 1, 2006
-
Driven Piles For New Pacific Northwest Baseball Park - Introduction
By Thomas M. Gurtowski
The New Pacific Northwest Baseball Park, now known as Safeco Field, is located directly south of the Kingdome in Seattle, Washington, and will be the new home of the Seattle Mariners baseball team. Th
Jan 1, 1998
-
High Risk Control For Piling And Deep Foundations - A Systematic Approach
By Martin van Staveren
In today's rapid changing construction world, the business pressures on piling and deep foundations reach sky-high levels. Ever increasing complexity of construction projects do severely contribu
Jan 1, 2006
-
Downtown Seattle Transit Project - International District Station
By Richard K. Sandaas
Start Date: April 4, 1988 Completion Date: Dec. 29, 1989 Contractor: SCI Contractors Past and present transportation centers will come together at International District Station, located at th
Jan 1, 1990
-
Recent Developments In Secant Bored Pile Wall Construction
By D. E. Sherwood
Recent developments in high torque hydraulic rotary rigs has lead to the construction of secant bored pile walls by rotary drilling methods in circumstances where earlier methods were difficult and in
Jan 1, 1989
-
Kentucky Route 9 - Licking Pike Widening Design Build Slope Stabilization
By Frederick W. Slack
This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage
Jan 1, 2003
-
Structural Underpinning By Pinpiles
By D. A. Bruce
Small diameter cast-in-place bored piles (pinpiles) have been installed throughout the world since 1952, but only more recently in the United States. The special features of their construction and per
Jan 1, 1992
-
The Realities Of Foundation Engineering ? Synopsis
By J. O. Osterberg
The realities of foundation enginering are that the work never proceeds exactly as expected. The various reasons, exploration, design, construction, and legal are discussed. Case histories are present
Jan 1, 2010
-
Post-Grouted Drilled Shafts: A Case History Of The PGA Boulevard Bridge Project
By Gray Mullins
A post grouted drilled shaft foundation system was successfully used in place of the specified driven pile foundation system as a Value Engineering Cost Proposal (VECP) for the new PGA Boulevard Grade
Jan 1, 2003
-
Study Of Hammer Selection For Driven Steel Pipe Pile
By Jiwei Duan
The energy transferred from a hammer to the pile top is considered as the effective energy in this paper. The effective energy is related to the pile dimensions, soil and pile-soil interface propertie
Jan 1, 2006
-
List Of Delegates
AUSTRALIA CHAPMAN Gary JOHN WAGSTAFF CONTSRUCTIONS PTY. LTD. 1 Ashgrove Crescent 4060 ASHGROVE BRISBANE HILLAR Jaaes Director J.A. HILLAR & ASSOCIATES 99 Woolwich Road WOOLWICH,
Jan 1, 1994
-
Lateral Earth Pressure On Lagging In Soldier Pile Wall Systems
By Howard A. Perko
Soldier pile and lagging is a conventional means of temporary excavation shoring. Timber lagging design has traditionally been based upon the designer's experience or empirical rules. One such me
Jan 1, 2008
-
FDOT Method of Independent Separation of Tip and Skin Capacities of Driven Concrete Pile with Embedded Sensors
By Sastry Putcha, Vamshi Vemula, Aneesh Goly, Kumar Allady
Current dynamic testing practice to obtain pile total capacity will not yield optimum capacity due to the strain incompatibility between the side and tip resistances during driving. Superposition of e
Jan 1, 2018
-
Estimation Of Settlements Of Piles In Group
By Kazimierz Gwizdala
In the paper the method for estimation of settlement of vertically loaded piles in a group is presented. The method is generally based on the hybrid procedure with non-linear solution for single piles
Jan 1, 2002
-
Design Of Drilled Shafts Supporting Sound Walls
By Ke Yang
Drilled shafts are widely adopted as the foundation for sound walls. However, there has been a lack of uniformity in design and analysis methods and design criteria, in terms of factor of safety again
Jan 1, 2007
-
Common Sense Changed Conditions
By Bert R. Oastler
BERT R. OASTLER: Born Atlanta, Georgia, October 19, 1933; B.S. Civil Engineering, Duke University, 1956; Doctor of Laws, Emory University, 1966; Bryan Honor Society; Associate Editor, Journal of Publi
Jan 1, 1988
-
Response to Load for Four Different Types of Bored Piles
By Mario Terceros H., Bengt H. Fellenius
"ABSTRACTFour strain-gage instrumented bored piles were constructed in a sedimentary, dense to very dense, fine to medium sand in Santa Cruz, Bolivia. Two of the test piles were the normally used bore
Jan 1, 2014