Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    New Developments in Electromagnetic Testing of Wire Rope

    By F. Kitzinger

    Electromagnetic testing of wire rope has become more and more reliable over the past two decades. This improvement is partly a result of an unprecedented progress of electronic technology, which permi

    Jan 1, 1979

  • CIM
    Case history of Borehole Pulse EM surveys at the Falconbridge Lindsley discovery in Sudbury

    By D. Crone, T. Watts

    "The Lindsley project was a program of deep drilling to test the contact down-dip from two nickel-copper deposits, one uneconomical and the other mined out. The role of Borehole Pulse EM(PEM) was to d

    Jan 1, 1992

  • CIM
    An Influence of Temperature and Mineral Composition on Arsenic Removal from Copper Concentrates By Heat Treatment

    By Takahiko Okura, Chiharu Tokoro, Shunta Shibuya

    Copper concentrates bearing arsenic as enargite (Cu3AsS4) or tennantite (Cu12As4S13) have disadvantage on copper smelting environmentally and economically, so those concentrates should be treated dece

    Jan 1, 2014

  • CIM
    Statistical design for material and process optimization

    By G. Pouskouleli, T. A. Wheat

    "The role and benefits of using statistical methodology in the development and optimization of materials and processes is examined. It is shown that considerable benefits accrue from the use of an app

    Jan 1, 1992

  • CIM
    Coal, a fuel option at Cold Lake

    By J. P. Aiello

    "INTRODUCTIONWhile this paper deals specifically with potential coal use at the Cold Lake Project of Esso Resources Canada Limited, a majority of the technical aspects of coal conversion could apply t

    Jan 1, 1989

  • CIM
    Secondary alkali feldspars in porphyry systems

    By Craig H. B. Leitch

    "In describing the alteration of porphyry systems, the term ""secondary K-feldspar"" appears to be an oversimplification. A better term would be ""alkali feldspar"" alteration, because in actual fact

    Jan 1, 1981

  • CIM
    On the feasibility of mining peat for power generation in Canada

    By A. Ismail

    "The paper takes its material from three peat mining and power project feasibility studies sponsored by CANMET and conducted by Montreal Engineering Company Ltd. in the years 1976 to 1980. The role wh

    Jan 1, 1980

  • CIM
    Fording Coal Limited silo explosion

    By D. A. Stokes

    "In October of 1980, Fording's 15 000-ton capacity clean coal silo was put into operation. The silo was unique in that it was designed to allow the mass flow of material, coupled with a sophistic

    Jan 1, 1986

  • CIM
    Geology of the Cargill Phosphate Deposit in Northern Ontario

    By P. O. Sandvik, George Erdosh

    "AbstractThe Cargill phosphate deposit, located 32 kilometers southwest of Kapuskasing, Ontario, was discovered by the Resource Development Group of International Minerals & Chemical Corporation in 19

    Jan 1, 1977

  • CIM
    Some Aspects of A.C. Wound Rotor Motor Mine Hoist Control

    By F. Y. Grepe

    "THE MOST common type of mine hoist is, as is very well known, that in which the a.c. wound rotor motor is the driving medium. The reasons for the use of the wound rotor motor are, of course, economic

    Jan 1, 1954

  • CIM
    Mine Evaluation and Production Scheduling (MEPS)

    By H. C. W. Bosman

    "Over the past five years, contributions from geologists and mining engineers were instrumental in the successful development of MEPS. It is a system of FORTRAN programs specifically designed to be us

    Jan 1, 1973

  • CIM
    Heat reclaim at mine surface plants

    By W. D. Bonisteel

    In 1976, Rio Algom Limited began the expansion of uranium production facilities at Elliot Lake. Quirke Mine was the only property in operation at the time, and plans were made to expand its milling ca

    Jan 1, 1979

  • CIM
    Study of the thermally-induced shell deformation of high amperage Hall-Héroult cells

    By M. Dupuis

    It has been previously demonstrated [l] that there is no obvious thermal balance related issue limiting the size of a Hall-Héroult cell. Yet, it is well known that a forced-air sidewall cooling system

    Jan 1, 2005

  • CIM
    Material Characterization – An Absolute Mustfor Predicting The Flow Behaviour Of Your Hazardous Material

    By C. Holmes, T. Holmes

    Engineered-in material handling problems are responsible for significant unrealized value in mineral processing plants. At the root, is a lack of awareness and understanding of bulk material handling

    Jan 1, 2020

  • CIM
    Potential applications of knowledge-based systems in mining

    By A. Galibois, R. Singhal

    "This paper highlights some of the potential application areas of knowledge-based systems in the mining industry. The basic theoretical principles associated with knowledge-based systems are discussed

    Jan 1, 1988

  • CIM
    Flotation practices at Brunswick Mining

    By Stuart McTavish

    "The Brunswick Mining concentrator processes 10,000 D.S. T. per day of a complex sulphide ore. Four separate concentrates- zinc, lead, copper and bulk-are produced by selective flotation. Several majo

    Jan 1, 1980

  • CIM
    A new approach to 7/8-in. Tapered drilling equipment at Madawaska

    By R. M. Giegerich

    "This paper begins with a brief history of Madawaska Mines, a brief description of the geology, mining methods and equipment, and the historical development of 7/8-in. tapered drilling equipment. It t

    Jan 1, 1982

  • CIM
    The Baker Mill start-up and early operation

    By W. W. Muir

    "The Baker Mine used a 100-ton per day conventional cyanide leach mill located in northern British Columbia. A production decision was made in early 1980 and the mill was on fine in April 1981.Ore res

    Jan 1, 1985

  • CIM
    Terrain and soil assessment in support of planning for metal mine development

    By M. Walmsley, D. Maynard

    "This paper describes the use of terrain and soil information in the planning of mine developments, particularly in satisfying many of the existing provincial regulatory requirements. It is also noted

    Jan 1, 1981

  • CIM
    Conversion from "post" pillar cut-and-fill mining to blasthole-a case study at Falconbridge

    By J. Lebl, S. Bharti, D. J. Cornett

    "This paper presents the design and application of blasthole mining to an area at Strathcona Mine previously employing post pillar cut-and-fill. Extensive mining in the area had led to gradually deter

    Jan 1, 1983