Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Pre-Reduction of Blast Furnace Burdens Using the S-L Process

    By F J. Pearce

    The Steel Company of Canada, utilizing the S-L process, has produced partially and highly reduced pellets for use in the blast furnace. Experimental blast furnace tests, using reduced pellet burdens,

    Jan 1, 1964

  • CIM
    Correlating Economic and Social Data for a Globalized Mineral Investment

    By Zetti Gavelán

    Globalization and the search for new ore deposits inevitably lead to investment in foreign markets. Investors need to be aware of the effect of their venture on regional, social and economic issues wh

    May 1, 2003

  • CIM
    Supervisory Control Project Of A Copper Solvent Extraction Pilot Plant

    By L. G. Bergh

    The experience developing a supervisory control and information systems in a SX pilot plant is presented. The plant is located at the Process Control Laboratory, Santa Maria University, in Chile. In t

    Jan 1, 2007

  • CIM
    An Efficient Recycling Process of Rare Earth Metals Using Ionic Liquids

    By M. Goto, F. Kubota

    "In this study, we show the successful separation of rare earth metals, which are indispensable elements for the high-tech industry, from a solution containing a metal mixture by using a liquid-liquid

    Jan 1, 2012

  • CIM
    A Study of the Reaction Mechanisms for the Iron Segregation Process

    By T. H. Etsell, P. Kerr, Qi Liu

    "The objective of this investigation was to study the reaction mechanisms during the reduction of iron oxides in the presence of calcium chloride and carbon black as a simplified iron segregation proc

    Jan 1, 2016

  • CIM
    Possibilities and Limitations of Gravity Concentration as Applied to Pitchblende Ores at Port Radium, N. W. T.

    By E. B. Spice

    "IntroductionExperience at Eldorado has been gained with a variety of mill feeds. That is, the actual mode of occurrence of the pitchblende varies to such an extent that gravity concentration has at t

    Jan 1, 1950

  • CIM
    Enabling Mine Automation Through the Application of Neptec?s Opal and 3DRI Technology

    By E. Trickey

    In the mining industry there exists a constant drive for increased safety and productivity and decreased operating costs. This acts as a driver for implementing advanced technology. As more and more m

    Aug 1, 2013

  • CIM
    Mining Practices at Noranda's Boss Mountain Operation

    By Jacques Nantel

    "The molybdenite property of Brynnor Mines Limited, Boss Mountain Division (wholly-owned subsidiary of Noranda Mines Limited), is situated approximately 360 miles northeast of Vancouver on the east sl

    Jan 1, 1970

  • CIM
    The Fluosolid Roaster at Campbell Red Lake Mines, Limited

    By J. B. McKay

    It is the purpose of this paper to present an initial report on the construction and operation of the Fluo-Solid roaster at the property of Campbell Red Lake Mines, Ltd., Balmertown, Ontario. The roa

    Jan 1, 1951

  • CIM
    Flexibility of the Outokumpu Flash Smelting for Low and High Grade Concentrates - Evaluation By CFD-Modeling

    By K. Eklund, T. Ahokainen

    The Flash Smelting process is the most used production method for primary copper in the world. The basic idea of the Flash Smelting is to utilize the thermal value of sulfidic concentrates and melt th

    Jan 1, 2007

  • CIM
    Amulet Flotation Mill Practice

    By W. G. Hubler

    It has been within only the last two or three years that enough progress has been made in preferential flotation to warrant metallurgists in recommending the installation of commercial-sized plants fo

    Jan 1, 1931

  • CIM
    Development Problems and Techniques in the Fort St. John Natural Gas Area

    By F. G. Vetsch, F. A. Ronaghan

    "Introduction1N THE FALL of 1951, Peace River Allied Fort St. John No. 1 well was drilled in Lsd. 1, Section 9 Township 83, Range 18, West of the 6th Meridian, on the flats of the north side of Peace

    Jan 1, 1954

  • CIM
    Fraser Mine Material Handling System

    Weekly Capacity ? Current Schedule Rate (198.5 tonnes / hour) X Skip Time (112.7 hours) X Effectiveness (85%) = Weekly Capacity (19,015 tonnes) Capacity Conclusions - Existing hoists optimized are

    Feb 1, 2008

  • CIM
    Chromium Removal from Leach Liquors Produced During High Pressure Acid Leaching of Nickel Laterite Ores

    By M. Buarzaiga

    High-pressure acid leaching (HPAL) of nickel laterite ores typically extracts 95% of the nickel and 91% of the cobalt. Impurity elements in the feed, such as iron, aluminium and chromium, also dissolv

    Jan 1, 2004

  • CIM
    Salt Deposits at McMurray, Alberta

    By J. A. Allan

    OCCURRENCES of salt in Alberta have been mentioned and described by the writer in 1929 (l) and by Cole in 1930 (2). Brine springs occur at a number of places along the valley of Athabaska river north

    Jan 1, 1937

  • CIM
    Predictive Modeling For In Situ Recovery Operation

    By Gwenaële Petit, Ulan Massimkhanov, Gilles Joubert

    For its Zuuvch Ovoo uranium deposit in Mongolia, Badrakh Energy (partly owned by Orano Mining) is working on the prefeasibility study for exploitation by ISR (in situ recovery). As part of this projec

    Jan 1, 2020

  • CIM
    The mineralogy of gold and its significance in metal extraction

    By Claudia Gasparrini

    "Factors affecting the extraction of gold are of a mineralogical nature. Knowledge of the mineralogy of the ore or metallurgical product to be treated, if appropriately combined with the metallurgical

    Jan 1, 1983

  • CIM
    Overdrilling of Open-Pit Blast Holes

    By A. Galibois, H. Monette, J. L. Collins

    This paper deals with the problem of caving, which occurs in varying degrees in blast holes before loading. It is shown that the distribution of the amount of caving in materials may be described by a

    Jan 1, 1971

  • CIM
    Integrating Liner Profile Evolution and Mill Performance with 3D Dem Modelling

    By Nirmal Weerasekara

    Mill liners serve the dual purpose of protecting the shell from wear and transferring the rotary motion of the mill to an effective grinding action. As the liners wear, the efficiency of energy transf

    Jan 1, 2012

  • CIM
    Optimization of Cemented Rockfill Practices for Sublevel Stoping Mining System

    By Muhammad Zaka Emad

    ABSTRACT: Sublevel stoping mining methods with delayed backfill employs cemented rockfill (CRF) as a backfill material. It is used in underground mines to achieve ground control and reduce wall slough

    May 1, 2013