Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Droplet Generation and Residence Time in Slag during Top Blown Oxygen Steelmaking

    By Subagyo, Geoffrey Brooks, Ken Coley

    The generation of droplets and their subsequent reaction in the emulsion is critical to the overall kinetics of oxygen steelmaking. High temperature experiments have been performed at McMaster Univers

    Jan 1, 2004

  • CIM
    Effect of Frother Type on Foam Structure

    By Gonzalo Díaz, Diego Mesa, Willy Kracht

    "It is well known that frothers affect the amount of water that is transferred to the froth, which has an effect on both the froth stability and the water recovery. On the other hand, since non-select

    Jan 1, 2016

  • CIM
    Solid-State Reduction of South African Manganese and Chromite Ores: Effect of an Organic Binder and B2O3

    By M. O. Makwarela, M. W. Erwee, K. Bisaka

    "Energy efficiency in mining and minerals processing forms part of Mintek’s long-term research strategy which includes a specific programme designed at overcoming the challenges faced by the South Afr

    Jan 1, 2016

  • CIM
    Image Analysis Evaluation of the Effect of Grinding Media on Selective Flotation of Two Zinc-Lead-Copper Ores

    By William Petruk

    Image analysis studies were performed on mill products from pilot-plant and laboratory tests that had been conducted to determine the effect of grinding media on the selective flotation of two zinc-le

    Jan 1, 1977

  • CIM
    Mines Aurizon Ltée: Casa Berardi et Bien Plus

    By Martin Bergeron

    Producteur d?or de taille intermédiaire Mines Aurizon Ltée Bureau-chef àVancouverMine et projets localisés au Québec2

    May 1, 2011

  • CIM
    Évaluation de la performance technique des chantiers d’abattage pendant l’exploitation par chambres vides

    By J. K. Szymanski

    "RÉSUMÉPour maintenir de bonnes performances technique et économique dans l’exploitation par chambres vides (open stope) il est primordial d’assurer un contrôle efficace des limites réelles des chanti

    Jan 1, 1997

  • CIM
    Individual Mineral Behaviour in a Closed Grinding Circuit

    By J. A. Finch

    Individual mineral cyclone performance curves were determined for the four major minerals at two lead-zinc concentrators. Sizing was by screen and cyclosizer down to approximately 10 um, with lead , z

    Jan 1, 1977

  • CIM
    The Behaviour of As(III) and As(V) During the Precipitation of Alunite at 98°C

    By J. E. Dutrizac, Alba Sunyer

    The factors affecting the precipitation of arsenic-free alunite (KAl3(SO4)2(OH)6) were investigated in a series of laboratory experiments. Although the amount of alunite precipitated increased with in

    Jan 1, 2011

  • CIM
    The Cinola Gold Deposit, Queen Charlotte Islands, British Columbia

    By A. J. Sinclair, N. Champigny

    "The Cinola gold deposit in the northern Queen Charlotte Islands, British Columbia, is in a clastic sequence consisting of a lower shale of the Late Cretaceous Haida Formation and an overlying interbe

    Jan 1, 1982

  • CIM
    The Floating Train ? A New Proposal for Potash Distribution

    By P. L. Schwartz

    The present method of shipping potash to the myriad of consumers is inefficient, not only because of the extreme and unpredictable nature of seasonal demand, but also because railway car turnaround ti

    Jan 1, 1978

  • CIM
    Simulation as a tool for quantifying design parameters for material handling systems

    By D. W. Ginsberg, D. Cieplinski

    "The lifetime cost of a material handling system, or any mine system, can be reduced through the application of quality engineering. Dynamic simulation is a powerful tool that can be used to enhance t

    Jan 1, 1998

  • CIM
    Joining Geomechanical and Geophysical Monitoring at Coal and Ore Mines

    By V. V. Zubkov

    The systems of geophysical monitoring have been already put into operation at coal mines and ore mines. Since at present it is rather difficult to conduct mine experiments; it is necessary to start a

    Aug 1, 2013

  • CIM
    Airborne Electrical Surveys for Regional Studies in Oil and Ore Prospecting

    By Hans Lundberg

    An electric survey from a 'plane flown over the ground is much faster and cheaper than an electric survey carried out on the ground. The results are obtained as continuous recordings that are res

    Jan 1, 1950

  • CIM
    Is your NI43-101 technical report compliant?

    By Deborah A. McCombe

    "One of the cornerstones of NI43-101 Standards of Disclosure for Mineral Projects is the technical report. The purpose of the report is to provide a summary of the scientific and technical information

    Jan 1, 2003

  • CIM
    The role of the ore microscope and electron microprobe in the mining industry

    By Claudia Gasparrini

    "The ore microscope and electron microprobe, two common instruments for academic research, have not been used to full advantage in the Canadian mining industry, perhaps because they are not readily av

    Jan 1, 1980

  • CIM
    Leaching Kinetics of Iron in Atmospheric Direct Leaching of Marmatite

    By H. Zhu, Q. Jiang

    The leaching kinetics of iron during the atmospheric direct leaching (ADL) of marmatite concentrate was studied under the following conditions: reaction temperature of 343-383 K, slurry pressure of 0.

    Jan 1, 2014

  • CIM
    Closing the Loop Using Actual Concentrator Performance to Determine the True Value of Ore Sources

    By Adrian Dance

    The Antamina orebody is a geologically complex, polymetallic skarn located in the Peruvian Andes. A range of copper and copper-zinc ores are campaigned separately through the concentrator producing co

    May 1, 2003

  • CIM
    Remediation of Abandoned Lignite Mines in East Germany - Technical, Environmental, and Social Challenges

    By M. Kuyumcu

    After German reunification the mining industry in former East Germany was profoundly restructured. Beside privatization of profitable companies the public sector took over responsibility for the minin

    Aug 1, 2013

  • CIM
    Mining and Geology at' Scully Mine

    By O. W. Borgeson, D. K. Honsberger, R. T. Bell

    The Scully Mine, situated in the Labrador Trough near the Quebec-Labrador boundary, is one of the world's largest continuous ore deposits. This paper outlines the sequence of the mining operations fro

    Jan 1, 1969

  • CIM
    Resource Expansion at the Renard Diamond Project, Québec

    By Matt Manson

    Renard?1-10 kimberlite pipes and ?Lynx-Hibou?kimberlite dyke system within ?Foxtrot?property 50/50 JV with SOQUEM, Stornoway operator 2001: Discovery of the Renard kimberlite pipes 2003: Discovery

    May 1, 2010