Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Red Dog VIP mill optimization project. Part A: Rectifying the shortage of flotation capacity
By George Hope, Brigitte Lacouture
"The Red Dog mine has increased mill throughput most years since start-up. Although flotation equipment has been added over the last 10 years, the Red Dog metallurgical performance has been restricted
Jan 1, 2003
-
Developments in Coal Mining - 1970
"The outlook for Eastern Canada is decreasing coal production over the next few years; however, a reappraisal of the long-term requirements and increased prices of coal could lead to a revitalizing of
Jan 1, 1971
-
Elimination of the Pre-Aeration and Primary Filtration Circuits From the Dome Mill Flowsheet
"Placer Dome Inc.'s Dome Mine is located in South Porcupine, Ontario and has been in production since 1910. In the past, the mill leach circuit was preceded by preaeration and primary filtration circu
Jan 1, 1992
-
Development of a spontaneous heating liability index of coal from kinetic parameters
By H. B. Sahu, N. M. Mishra, D. C. Panigrahi
The paper presents the development of a spontaneous heating liability index (SHLI) of coal based on a mathematical approach. The parameters for the calculation of this index have been determined by di
Jan 1, 2008
-
Vibrathane Discharge Liners for the Mining Industry
By H. C. Wade
"Description and UseDischarge liners or pulp lifters as they are sometimes called are a trough type liner used at the discharge end of the mill where ground ore passes to the trunnion.There are basica
Jan 1, 1980
-
Some Aspects in the Trending of Young Engineers to Coal Mining
By Newell G. Alford
COAL companies are definitely becoming conscious of the need for better organization. Mechanized mining and the intricate preparation of coal have brought with them the demand for better trained and m
Jan 1, 1940
-
On the Ore-Bearing Structures of the Giant Yellowknife Gold Mine
By L. A. Wrigglesworth, A. S. Dadson
The orebodies of the Giant Yellow-knife mine occur in zones of schist, in an assemblage of typical Precambrian greenstones which form part of the Yellowknife Greenstone Belt. One of the most interesti
Jan 1, 1959
-
Defining Wear and Abrasion with a Review of Materials to Combat Abrasion and Wear in Mills
By Ludwig M. Strah
"Wear is a universal problem and is present in all cases wherein one weighted surface moves with or relative to another surface. A practical description of wear as applied to mineral processing plants
Jan 1, 1983
-
Urban mining — Recycling gypsum waste in Vancouver
By J. A. McCamley
Gypsum scrap generated from wallboard manufacturing, construction and deconstruction activities in North America, Europe and Japan is a recognized environmental problem. Landfill disposal of this gyps
Jan 1, 2004
-
Effect of T4 and T6 Heat Treatments on Microstructural and Mechanical Properties of AX91-Re Mg Alloy
By K. Meshinchi Asl
In this study the effects of T4 and T6 heat treatments on microstructural characteristics of AZ91 alloy containing Rare Earth elements have been investigated. Formation of intermetallic Al1 1RE3 needl
Jan 1, 2007
-
One Hundred Years of Cyanidation
By Fathi Habashi
The year 1987 marked the centennial of the beginning of modern hydrometallurgy. On October 19, 1887 British Patent No. 14174 entitled Process of Obtaining Gold and Silver from Ores was issued*. The di
Jan 1, 1999
-
Geological Structure Disclosed in the Keeley Mine
By H. C. Boydell
Introduction Situated in the district of South Lorrain, some 16 miles southeast of Cobalt, Ontario, and reached from that centre either by branch line of the T. & N. O. railway or by what, for a mini
Jan 1, 1931
-
A Study of Present-Day Grinding
By L. E. Djingheuzian
Introduction Cylindrical grinding mills have been used for a long time, but during many years of testing no methods were established that gave consistent results. The work by both scientific invest
Jan 1, 1949
-
Effect of ball size change on the performance of grinding and flotation circuits of the Sarcheshmeh copper mine
By S. Banisi, M. Poorkani, M. Farzaneh, M. Askari
"At the Sarcheshmeh copper mine 40,000 t of ore per day with an average grade of 0.9 % Cu is ground to 70% passing 75 microns. Grinding is effected in 8 parallel lines of 8 x 5 m ball mills in a close
Jan 1, 2002
-
Energy Requirements in Electrolytic Winning and Refining of Metals
By V. A. Ettel
Current practices in electrolytic winning and refining of copper , nickel and zinc are reviewed from the point of view of their respective energy requirements. The electrical energy requirements of th
Jan 1, 1977
-
Development of the Science of Grinding
By L. E. Djingheuzian
"IntroductionDURING the past two decades an enormous amount of empirical data has been accumulating on grinding. These data have been obtained by mill operators on grinding ores with a diversity of ch
Jan 1, 1952
-
A Model Study of the Resistance to Air Flow of a Rectangular Mine Shaft
By Cedric E. Gregory
"A study of model rectangular mine shafts has been made in the wind tunnel, with the aim of reducing air-flow resistance elements to a practicable minimum. An analysis of Table 7 shows an indicated av
Jan 1, 1973
-
Uranium Compounds as Thermoelectric Materials
The properties required for a com-pound to form useful thermoelectric materials are described. Uranium compounds which might have these properties are reviewed. Several of these compounds have been pr
Jan 1, 1963
-
Mine Reclamation in a Changing Regulatory Environment
By David H. Searle
This paper will discuss the common trends existing in various Canadian jurisdictions for the closure and reclamation of mines. Included will be a discussion of the requirement to post security as well
May 1, 2006
-
Shortcomings of Environmental Assurance in Mining and the use of Insurance as a Complement
By Richard Poulin
Rehabilitation of mined out areas is often enforced by environmental bonding. It is usually assumed that this process provides financial assurance that rehabilitation will be carried out as agreed at
May 1, 2004