Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Red Dog VIP mill optimization project. Part A: Rectifying the shortage of flotation capacity

    By George Hope, Brigitte Lacouture

    "The Red Dog mine has increased mill throughput most years since start-up. Although flotation equipment has been added over the last 10 years, the Red Dog metallurgical performance has been restricted

    Jan 1, 2003

  • CIM
    Developments in Coal Mining - 1970

    "The outlook for Eastern Canada is decreasing coal production over the next few years; however, a reappraisal of the long-term requirements and increased prices of coal could lead to a revitalizing of

    Jan 1, 1971

  • CIM
    Elimination of the Pre-Aeration and Primary Filtration Circuits From the Dome Mill Flowsheet

    "Placer Dome Inc.'s Dome Mine is located in South Porcupine, Ontario and has been in production since 1910. In the past, the mill leach circuit was preceded by preaeration and primary filtration circu

    Jan 1, 1992

  • CIM
    Development of a spontaneous heating liability index of coal from kinetic parameters

    By H. B. Sahu, N. M. Mishra, D. C. Panigrahi

    The paper presents the development of a spontaneous heating liability index (SHLI) of coal based on a mathematical approach. The parameters for the calculation of this index have been determined by di

    Jan 1, 2008

  • CIM
    Vibrathane Discharge Liners for the Mining Industry

    By H. C. Wade

    "Description and UseDischarge liners or pulp lifters as they are sometimes called are a trough type liner used at the discharge end of the mill where ground ore passes to the trunnion.There are basica

    Jan 1, 1980

  • CIM
    Some Aspects in the Trending of Young Engineers to Coal Mining

    By Newell G. Alford

    COAL companies are definitely becoming conscious of the need for better organization. Mechanized mining and the intricate preparation of coal have brought with them the demand for better trained and m

    Jan 1, 1940

  • CIM
    On the Ore-Bearing Structures of the Giant Yellowknife Gold Mine

    By L. A. Wrigglesworth, A. S. Dadson

    The orebodies of the Giant Yellow-knife mine occur in zones of schist, in an assemblage of typical Precambrian greenstones which form part of the Yellowknife Greenstone Belt. One of the most interesti

    Jan 1, 1959

  • CIM
    Defining Wear and Abrasion with a Review of Materials to Combat Abrasion and Wear in Mills

    By Ludwig M. Strah

    "Wear is a universal problem and is present in all cases wherein one weighted surface moves with or relative to another surface. A practical description of wear as applied to mineral processing plants

    Jan 1, 1983

  • CIM
    Urban mining — Recycling gypsum waste in Vancouver

    By J. A. McCamley

    Gypsum scrap generated from wallboard manufacturing, construction and deconstruction activities in North America, Europe and Japan is a recognized environmental problem. Landfill disposal of this gyps

    Jan 1, 2004

  • CIM
    Effect of T4 and T6 Heat Treatments on Microstructural and Mechanical Properties of AX91-Re Mg Alloy

    By K. Meshinchi Asl

    In this study the effects of T4 and T6 heat treatments on microstructural characteristics of AZ91 alloy containing Rare Earth elements have been investigated. Formation of intermetallic Al1 1RE3 needl

    Jan 1, 2007

  • CIM
    One Hundred Years of Cyanidation

    By Fathi Habashi

    The year 1987 marked the centennial of the beginning of modern hydrometallurgy. On October 19, 1887 British Patent No. 14174 entitled Process of Obtaining Gold and Silver from Ores was issued*. The di

    Jan 1, 1999

  • CIM
    Geological Structure Disclosed in the Keeley Mine

    By H. C. Boydell

    Introduction Situated in the district of South Lorrain, some 16 miles southeast of Cobalt, Ontario, and reached from that centre either by branch line of the T. & N. O. railway or by what, for a mini

    Jan 1, 1931

  • CIM
    A Study of Present-Day Grinding

    By L. E. Djingheuzian

    Introduction Cylindrical grinding mills have been used for a long time, but during many years of testing no methods were established that gave consistent results. The work by both scientific invest

    Jan 1, 1949

  • CIM
    Effect of ball size change on the performance of grinding and flotation circuits of the Sarcheshmeh copper mine

    By S. Banisi, M. Poorkani, M. Farzaneh, M. Askari

    "At the Sarcheshmeh copper mine 40,000 t of ore per day with an average grade of 0.9 % Cu is ground to 70% passing 75 microns. Grinding is effected in 8 parallel lines of 8 x 5 m ball mills in a close

    Jan 1, 2002

  • CIM
    Energy Requirements in Electrolytic Winning and Refining of Metals

    By V. A. Ettel

    Current practices in electrolytic winning and refining of copper , nickel and zinc are reviewed from the point of view of their respective energy requirements. The electrical energy requirements of th

    Jan 1, 1977

  • CIM
    Development of the Science of Grinding

    By L. E. Djingheuzian

    "IntroductionDURING the past two decades an enormous amount of empirical data has been accumulating on grinding. These data have been obtained by mill operators on grinding ores with a diversity of ch

    Jan 1, 1952

  • CIM
    A Model Study of the Resistance to Air Flow of a Rectangular Mine Shaft

    By Cedric E. Gregory

    "A study of model rectangular mine shafts has been made in the wind tunnel, with the aim of reducing air-flow resistance elements to a practicable minimum. An analysis of Table 7 shows an indicated av

    Jan 1, 1973

  • CIM
    Uranium Compounds as Thermoelectric Materials

    The properties required for a com-pound to form useful thermoelectric materials are described. Uranium compounds which might have these properties are reviewed. Several of these compounds have been pr

    Jan 1, 1963

  • CIM
    Mine Reclamation in a Changing Regulatory Environment

    By David H. Searle

    This paper will discuss the common trends existing in various Canadian jurisdictions for the closure and reclamation of mines. Included will be a discussion of the requirement to post security as well

    May 1, 2006

  • CIM
    Shortcomings of Environmental Assurance in Mining and the use of Insurance as a Complement

    By Richard Poulin

    Rehabilitation of mined out areas is often enforced by environmental bonding. It is usually assumed that this process provides financial assurance that rehabilitation will be carried out as agreed at

    May 1, 2004