Lötschberg base tunnel: brittle failure phenomena encountered during excavation of the Steg lateral aditBy V. Labiouse, P. K. Kaiser, F. Descoeudres, F. Rojat
In this paper some failure phenomena observed in the crossing of brittle rock formations at the Lötschberg base tunnel are presented. A brittle failure criteria, recently developed by Canadian researc
Jan 1, 2003
-
Variance Propagation In Toll Smelting Operations Treating Multiple Concentrate StockpilesBy C. J. Cutler
Metallurgical accounting for toll treatment smelters pose a number of challenges. Multiple feed stockpiles have to be accounted for as part of the monthly recovery estimation. Moreover, multiple metal
Jan 1, 2006
-
Mechanism of Slag and Matte Formation in Copper Flash SmeltingBy Zhuo Chen, Jun Zhou, Jiemin Zhou
Samples of the reacting suspension particles were taken from the reaction shaft of a commercial flash furnace at different heights. The processes of matte and slag formation and morphology of the samp
Jan 1, 2019
-
Effect Of Agglomeration Binders On The Copper Solvent Extraction ProcessBy K. A. Lewandowski
Binders have been suggested as an aid for agglomeration to improve copper recovery in heap leaching operations. However, it has not been established if the use of binders would negatively affect the s
Jan 1, 2009
-
Reductive Leaching of Manganese Containing Material with Pyrite in a Mild Sulphuric Acid MediumBy Parida K. M, Paramguru R. K
Laboratory-scale studies aimed at developing a process for solubilising manganese values from a low grade pyrolusite containing material using low grade pyrite, both available in India, are described.
Jan 1, 1995
-
Relevant Factors for Development and Draw Control of Block CavingBy Peter F. Weiss, H. Riedler, I. M. Moschitz, A. Olsacher, G. B. Fettweis
CONTENTS : 1. NATURAL FACTORS Geology Petrography and Rock Mechanics Mining System Orientation Rock Bolting System Movability of the Ore Grain Size Distribution Permeability Contam
Jan 1, 1981
-
The Influence of: Grate versus Overflow Discharge in Open Circuit Milling Open versus Closed Circuit Milling with an Overflow MillBy Benoit Clermont, Jan Lux
"Magotteaux and Anglo Platinum started a co-operation program with the main aim of establishing the optimum milling configuration measured in terms of throughput, fineness and energy consumption.For t
Jan 1, 2003
-
Programmable electronic and hardwired emergency shutdown systems: A quantified safety analysisBy John J. Sammarco
Abstract- Emergency shutdown systems (ESDs) for mining machinery provide critical functions to safeguard miners. Traditionally, ESDs were realized with simple hardwired circuits; today, there is a gro
Jan 1, 2007
-
PACMANUS: An Active Seafloor Hydrothermal Field on Siliceous Volcanic Rocks in the Eastern Manus Basin, Papua New GuineaBy J M. Parr, P M. Herzig, J B. Gemmell, S D. Scott
PACMANUS is an actively-forming seafloor analogue of volcanic-hosted massive sulfide orebodies, situated on the crest of an andesite-dacite-rhyodacite ridge overlying rifted older arc crust in a back-
Jan 1, 1995
-
Hydraulic Hoisting & Long Distance Pumping of CoalBy R. E. McElvain
"Hydraulic transportation of solids in suspension with water or other carriers, such as oil is becoming more practical as economic situations develop with respect to the railroads and other carriers.
Jan 1, 1978
-
Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree MineBy D Reddy Chinnasane
Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations
Oct 1, 2010
-
Cautious Blasting in Critical Areas at Ramagundam Super Thermal Power StationBy N. Jayaraman, V. Srikant, A. Radhakrishna
Addition of a 500 MW unit to the existing units at Ramagundum Thermal Power Station requires blasting of large volumes of rock very close to sensitive installations like Turbo generator, Generator tra
Jan 1, 2003
-
Real Time Performance Management in Metallurgical OperationsBy O. A. Bascur, J. Patrick. Kennedy
"The lack of integration of mining and metallurgical information at sufficient detail to act is a problem. Without such data, mine cut-off grade can not be optimized on a per grade basis. It is diffic
Jan 1, 2004
-
Cost Preventive System To Control Unstable Roof In Main Line Haulage EntriesBy John Popovich
The MICON RokLok binder system including component and consolidation processes and safety and its first aide are described. The implementation procedures and selection of injection parameters are disc
Jan 1, 2001
-
Development of Mains in Challenging Ground ConditionsBy Kot F. v. Unrug
The present combination of coal market prices and reserves, situated in the Central Appalachian Coal Field, is such that mining of smaller coal reserve blocks has become economically attractive. In
Jan 1, 2006
-
Seismograph Calibration - What You Should KnowBy Bob Turnbull
The dictionary definition of calibration is: to determine by measurement or comparison with a standard, the corre c t value for each scale reading on a device.1 As a consultant or blast contractor, yo
Jan 1, 2004
-
Gold, Silver and Base Metal Deposits of the Chillagoe District, Australia: Hypothermal to Epithermal OverprintingBy J E. Nethery
At the Red Dome and Mungana deposits in north Queensland, Australia, it is proposed that mineralisation and alteration developed as a 'telescoped' overprinting continuum, ranging in style fr
Jan 1, 1995
-
Mobile Roof Support Load Rate Monitoring SystemBy John K. Owens, Wayne L. Howie
Mobile roof support (MRS) machines are used as roof support during pillar recovery in retreat operations in lieu of wooden posts, cribs, or hydraulic props. A Mine Safety and Health Administration-per
-
Direct Extraction of Rare Earth Elements from a Silicate OreBy K. Turgeon, J. -F. Boulanger, L. Whitty-Léveille, C. Bazin
"Several companies targeting Rare Earth Elements (REE) around the world have completed a Preliminary Economic Assessment showing positive project financial results. Although REE ores may contain high
Jan 1, 2016
-
The Regulatory Requirements and a Permitting Strategy for Small Heap Leach Mining OperationsBy Jeffrey D. Thatcher, Debra W. Struhsacker
With the burgeoning development of precious metals heap leach mining projects throughout the country regulatory agencies are beginning to take a closer look at the short-and long-term environmental co