Search Documents

  • IMPC
    Development of geometallurgical laboratory tests to characterize metal preconcentration by size

    By C. Carrasco

    "Over the last 30 years the average grade of mined ore bodies has significantly decreased while the proportion of waste removal has in many cases more than doubled. This has been identified as prime r

    Jan 1, 2014

  • SME
    Coal Mining Subsidence and Golden Eagle Habitat

    By Val E. Payne

    Issues between resource utilization and resource preservation often develop in connection with coal mining. One such conflict exists in eastern Utah where PacifiCorp and Energy West Mining Company are

    Jan 1, 1986

  • NIOSH
    RI 6058 Safety Characteristics Of Normal Propyl Nitrate

    By Michael G. Zabetakis

    Limits of flammability of normal propyl nitrate (NPN) vapor were investigated at ambient and elevated temperatures. Minimum spontaneous ignition and decomposition temperatures were determined with lab

    Jan 1, 1962

  • NIOSH
    Screen Sizing Of Coal, Ores, And Other Minerals - Introduction - Preliminary Statement

    By E. A. Holbrook

    The data in this bulletin were obtained during an investigation of screening practice by the University of Illinois engineering experiment station and the United States Bureau of Mines under a coopera

    Jan 1, 1925

  • AUSIMM
    Fire and Life Safety - The EastLink Perspective

    By C MacDonald

    There are many technologies available today in terms of fire and life safety in road tunnels. So many in fact that it is becoming more and more difficult for clients and contractors alike to determine

    Jan 1, 2008

  • SAIMM
    Seismic monitoring of the Northparkes lift 2 block cave?part I undercutting ? Synopsis

    Caving of the second lift of the E26 orebody at Northparkes Mines was monitored with a comprehensive package of instrumentation, including an ISS seismic monitoring system. Seismicity was collected by

    Jan 1, 2008

  • AUSIMM
    E26 Lift 1 North block cave development and construction

    By R Cunningham

    The E26 Lift 1 North Project took 37 months from the approval on 1st January 2019 to the commencement of production on 1st March 2022. This was five months ahead of the feasibility plan. When compared

    Mar 29, 2023

  • CIM
    Constructing, Commissioning and Operating a Mine at High Altitude - The Collahuasi Experience

    By Colin Lindsay

    "The Collahuasi copper mine, located at an altitude of 4300 meters above sea level in northern Chile, commenced operations late in 1998. The mine is currently the 4‘h largest copper producer in the wo

    Jan 1, 2001

  • ISEE
    Well Casing - Another Problem Solved Through the Uses of Explosives

    By Jerry Wallace

    The goal: At an industrial site, sever a well pipe containing an interior obstruction in a timely, cost effective manner by using a shape-charge to cut through the casing more than 50 meters below gro

    Jan 1, 2000

  • DFI
    Advanced Soil Mailing Design - Improved Reliability And Predictability Of Wall Performance

    By Reinhard Gnilsen

    Soil Nail walls, like any other structure, must meet high standards of design to be acceptable to the public and owners. On the other hand, the concept of soil nailing trails behind other structures i

    Jan 1, 1988

  • NIOSH
    Bulletin 146 Technology of Salt Making in the United States

    By W. C. Phalen

    During the search for deposits of soluble potash salts in the United States, carried on by the United States Geological Survey, much infor- mation was collected on the salt resources and industry of t

    Jan 1, 1917

  • ISEE
    Fire and Explosion of a Mobile Explosive Manufacturing Unit

    By Jose a. Sanchidrian, Ramon G. Eguren, Javier L. Amigo

    On December 2013 a MEMU exploded at a blasting site in Norway, after burning for more than two hours. This paper describes the analyses made to determine the actual yield of the explosion, the lessons

    Jan 1, 2016

  • NIOSH
    IC 8808 In-Mine Evaluation Of Underground Fire And Smoke Detectors (6f17c200-99f7-4b63-9502-cedfeb78fb40)

    By Russell E. Griffin

    The current state-of-the-art of fire and smoke detection technology is reviewed from the standpoint of suitability for use in underground metal and nonmetal mines. Detection modes, fire signatures, an

    Jan 1, 1979

  • CIM
    Precipitation of Crystalline Svabite (Ca5(AsO4)3F) and Svabite/Fluorapatite (CA5(ASO4)X(PO4)3-XF) Compounds and Evaluation of their Long-Term Arsenic Fixation Potential

    By M. -C. Noël, G. P. Demopoulos

    In this work the formation and environmental stabilization potential of arsenate-containing fluoroapatites is considered. In particular in this research various compounds were precipitated from synthe

    Jan 1, 2014

  • DFI
    Performance Of Non-Displacement And Displacement Piling, Adelaide Convention Centre, South Australia

    By Felix Cheng

    Extensions to the Convention Centre in Adelaide, South Australia consisted in part of construction over the existing railway system comprising nine rail lines and passenger platforms. Vibro-pile (Aust

    Jan 1, 2002

  • SME-ICGCM
    The Investigation Of The Rock Mass Stressed-Deformed State Under The Conditions Of Floating Earth Presence In The Roof Of The Level Working

    By V. Bondarenko

    The forecasting of floating earth inrush into the working is to a great extent connected with the investigation of the rock mass stressed-deformed state around the working. The aim of such investigati

    Jan 1, 1996

  • SME
    An Acoustical Field Comparison Of Hand Drills: Electro-Pneumatic Vs. Pneumatic Jackleg

    By D. R. Zuchelli

    In order for MSHA to require the use of a noise control, the control must be proven ?technologically feasible?. Technologically feasible controls must reduce a miner?s noise overexposure to the permi

    Jan 1, 2011

  • CIM
    Application of advanced blasting technologies for large scale de-stress blasts at Brunswick mine

    By S. Chung

    Mining in highly stressed ground conditions has been an increasing challenge at the Brunswick mine. Over the past 30 years, two large regional pillars were established on the 1000 m Level to support t

    Jan 1, 2005

  • AUSIMM
    Chemical Treatment of Monazite Sand

    Alkaline leaching with sodium carbonate solution adjusted to pH 9·5 to 10·0 preferentially dissolves thorium from a mixture of rare earth and thorium hydroxides. Rare earth sodium carbonates

    Jan 1, 1963

  • SME
    Cost Effective Tunnel Development In Slovakia

    By John Chadwick

    In the drive for faster development advance rates, railbound systems can be advantageous, in the right application. Skanska BS, the contractor to mine-owner VSK Mining, is driving an adit access deep

    Jan 1, 2009