Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Influence Of The Sloping Of Ground Surfaces On Mine Subsidence (165d3ebb-e4c1-4bc8-a5e4-409b4e24155c)

    By D. M. Shu

    A two-dimensional finite element modelling technique is applied to predict the subsidence movements on a sloping ground surface above a completely mined panel. The modelling is carried out for the sur

    Jan 1, 1992

  • SME-ICGCM
    A Case Study Of Abandoned Mine Subsidence At Dominion, Nova Scotia, Canada, 2002-2003

    By Dave Forrester

    Mining subsidence over shallow abandoned coal mine workings is unfortunately not an uncommon experience in the coalfields of North America and there is a significant knowledge and literature base addr

    Jan 1, 2004

  • SME-ICGCM
    Operational Experience With FLEXIBOLT Systems In Australian Coal Mines

    Since the initial development and trials of FLEXIBOLT flexible roof bolts, further comparative testing and product development has been completed as part of the changeover to this roof support system

    Jan 1, 1994

  • SME-ICGCM
    The Radio Imaging Method (RIM) -- A Means Of Detecting And Imaging Anomalous Geologic Structures In A Coal Seam

    By Rodger Fry

    All coal deposits contain anomalous geologic conditions which have an impact on roof control, Run-Of--Mine (ROM) coal quality and production costs. To remain competitive in today's coal market an

    Jan 1, 1984

  • SME-ICGCM
    A Novel and Effective Method to Develop Tension in a Roof Bolt

    By Phillip E. Gramlich

    Through extensive practical experience and multiple studies, tensioned roof control systems have proven beneficial in difficult mining conditions. Due to increased mining of less desirable seams, ten

    Jan 1, 2014

  • SME-ICGCM
    Seam Structure - An Important Criterion for Coal Pillar Design

    By Kot F. v. Unrug

    In spite of the extensive research and accumulated experience from mining operations, an appropriate pillar design remains an open issue. Due to the shrinking reserve base, present mining operations m

    Jan 1, 2005

  • SME-ICGCM
    Roof Bolting for Long-Term Entries in Underground Coal Mines

    By Peter Zhang

    As simpler and easier reserves are exploited to depletion, underground coal mining continues in more complex geologic settings and conditions. Roof bolting for long-term entry stability is always a ch

    Jan 1, 2011

  • SME-ICGCM
    Expanded Cement: New Solutions for Age-Old Problems

    By John K. Wood

    The development of an expanded cement product represents a major advance in the technology of roof control systems. Such a product is gaining recognition as a valuable tool in today's cost- consc

    Jan 1, 1986

  • SME-ICGCM
    Remote Mining Using Water for Ground Support

    By Robert L. Schmidt

    The support of underground openings by water is a natural phenomenon. Surface sinkholes, such as those that occur with some frequency in Florida, are attributed to a lowering of the water table result

    Jan 1, 1986

  • SME-ICGCM
    Multi?Seam Mining Over Old Workings with Small Pillars - A Case Study

    By Peter Zhang

    Room and pillar mining under shallow depth is usually conducted with a high extraction ratio, which leaves small pillars with a low safety factor in some old workings in abandoned mines. Pillar slough

    Jan 1, 2014

  • SME-ICGCM
    First Caving And Its Effects--A Case Study

    By S. M. Hsiung

    In late September 1984, a longwall panel in West Virginia lost 60 powered supports when the face had advanced for 250 ft. from the setup entry. An in-mine investigation showed that it was a first weig

    Jan 1, 1984

  • SME-ICGCM
    Outbursts And Rockbursts In Coal Mines

    By Ian W. Farmer

    A description of the factors causing outbursts and rockbursts in coal mines is given. The mechanics of both outbursts and rockbursts can be described in terms of conversion of stored strain energy in

    Jan 1, 1988

  • SME-ICGCM
    Longwall Mining Of Thin Seams

    By Ernest A. Curth

    An estimated 49 billion tons or 29 percent, of the coal reserve base to a depth of 1,000 feet in the eastern United States fall in the 28- to 42-inch range. Often left out as a consequence of selectiv

    Jan 1, 1981

  • SME-ICGCM
    Formation of Face Headings Using Stress Relief at Asfordby Mine

    By John Cassie

    The condition of roadways in the Deep Main seam at Asfordby mine, operated by RJB Mining (UK) Ltd, is strongly dependant on drivage direction relative to the maximum horizontal stress. The mine is la

    Jan 1, 1997

  • SME-ICGCM
    A New Method For Longwall Pillar Design

    By P. Tsang

    In order to deal with ground control problems such as roof falls, floor heaves and pillar failures in underground coal mines, a new pillar design method based on the "yield pillar" concept is proposed

    Jan 1, 1993

  • SME-ICGCM
    A 3-D Semi-Analytical Method for Subsidence Prediction and Stress Analysis in Coal Mining

    By Li-min Liu

    The Semi-Analytical method can be used to solve a variety of problems in geomechanics and civil engineering. When it comes to layered rock strata and rock masses, it is superior to all other analytica

    Jan 1, 2002

  • SME-ICGCM
    Development And Demonstration Of An Alternate Mining Geometry For Improved Ground Control In An Illinois Coal Mine

    By Y. P. Chugh

    About 60-70% of the underground mined coal in Illinois is extracted using a room-and-pillar mining method that permits extraction of about 50% of the coal. The remaining coal is left behind in the for

    Jan 1, 2004

  • SME-ICGCM
    Laboratory Strength Testing of Coal from Selected Illinois Seams

    By E. Bane Kroeger

    For many years, researchers around the world have been investigating coal pillar stability. Many have focused on trying to optimize the size of the pillars by examining stable and failed pillars in un

    Jan 1, 2004

  • SME-ICGCM
    Evaluation of the Impact of Standing Support on Ground Behavior in Longwall Tailgates (8a8cef19-7d7c-417d-83e0-31858c1152c5)

    By Thomas Barczak

    Longwall mines typically use some form of standing support for secondary roof support in longwall tailgate entries. Although there have been several new support products developed for this application

    Jan 1, 2005

  • SME-ICGCM
    Control Technology For Roof Drill Operators

    By Bob Thomas

    The roof drill operator productivity can be enhanced by the introduction of control technology The operators control station can be improved by considering human factors such as handle forces and cont

    Jan 1, 1999