Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Ground Control Design For Multiple Seam Mining Using Finite Element Analysis
By John Stankus
Seam interaction in multiple seam mining has significant effect on entry stability. The remaining pillar in an old working usually creates a high stress concentration zone while the gob creates a stre
Jan 1, 1999
-
The Impact Factors of Overburden Movement in Longwall Mining of Shallow Coal Seams
By Yang Li
For the study of overburden movement in longwall mining of shallow coal seams, most scholars merely consider the thickness of bedrock and top soils. In this paper, the overburden movement in longwall
Jan 1, 2014
-
The Broken Rock Zone Around Tunnels And Its Support Theory
By Fangting Dong
The broken rock zone (BRZ) and the tunnel support theory are investigated. The relationship between the BRZ and the related factors, the interaction between the BRZ and supports, and the function of s
Jan 1, 1988
-
Stability Analysis of Shell Structure Around the Longwall Mining Face Area in Steeply Dipping Seam
By Yongping Wu
Taking the longwall mining face area in a steeply dipping seam as the research object, the stability of an asymmetrical rock mass structure is analyzed using shell theory and masonry beam theory. The
Jan 1, 2013
-
Use Of Database In Ground Control To Identify Weightings And Water Inflows
By G. C. Xiao
A database, incorporating historical data from British mines, to study the factors affecting inflows from proximate aquifers into longwall workings, showed that a main casual factor was the immediate
Jan 1, 1990
-
Deformation Mechanism and Floor Heave Control Technology in Deep? Buried Full Seam Chamber
By Xicai Gao
With the intensification and expansion of deep coal mining, the surrounding rock stress environment becomes further deteriorated because of the complicated geological environment and powerful mining e
Jan 1, 2013
-
Roof-Pillar Interface Affecting the Pillar Behavior
By Andre Cezar Zingano
"The empirical approach for pillar design assumes that geological conditions should be perfect, such as horizontal seams, and that pillar strength and behavior will only depend on the coal seam streng
Jan 1, 2016
-
Reinforcement of Large Pillars by Bolting (8821999e-4c04-46db-a69e-e7a56781ac96)
By S. J. Mitchell
An analysis of bolting reinforcement of several large [approximately 18 m (60 ft) cube] pillars was performed. The many overcoring stress profiles in pillars at the mine were used to produce generaliz
Jan 1, 1984
-
Numerical Model Simulation of a Development Pillar at a Steeply Dipping Underground Limestone Mine
By Morgan M. Sears, Gamal Rashed, Jim Winfield, Brent Slaker
"Over the past decade, ground falls have resulted in five fatalities, representing over 40% of all fatalities occurring in underground stone mines in the United States. In conjunction with recent high
Jan 1, 2018
-
Analysis of a Stability Problem in an Underground Coal Mine Due to Floor Conditions
By M Nombe
Based on the analysis of a case study at POWELTON No.2 MINE, it was determined that mine stability problems had occurred due to floor softening. A fireclay (underclay) layer in the immediate floor was
Jan 1, 2002
-
Application of New Void Detection Algorithm for Analysis of Feed Pressure and Rotation Pressure of Roof Bolters
By Eric Keller, Jamal Rostami, Wenpeng Liu
"Roof and rib instability is an important issue in underground mining. To optimize ground support design, enhance ground stability, and reduce the possibility of roof or rib failure with minimal use o
Jan 1, 2016
-
Mine Convergence When Using Mobile Roof Supports In Pillar Recovery
By J. R. Stoltz
To date, there has been limited formal research dealing with the use of Mobile Roof Supports (MRS) for pillar recovery. This paper, which is a portion of a larger project, presents convergence data fr
Jan 1, 1999
-
Geo-Mechanical Property And Failures Of Weak Roof Shales In Coal Mines
By Yunqing Zhang
Weak shales refer to those with lower strength, thinly- laminated structure, sensitivity to moisture and weathering as well as significant time dependent behavior. It has been said that many future co
Jan 1, 2004
-
Factors Influencing Intersection Stability in U.S. Coal Mines (dc39f664-0f70-474b-be24-4adbb66c7510)
By Gregory Molinda
Groundfalls are much more likely to occur in coal mine intersections than in entries. NIOSH is using the experience of U.S. coal mines to determine the factors which influence intersection instability
Jan 1, 1998
-
Longwall Mining-Induced Abutment Loads and Their Impacts on Pillar and Entry Stability
By Jinsheng Chen
Longwall mining-induced abutment loads on the surrounding coal pillars can be grouped into two categories in terms of the relative position of the coal pillars and the longwall face. They are the fron
Jan 1, 2002
-
Longwall Mining-Through the Backfilled In-Panel Entries at Cyprus Emerald Mine
In recent years, improvements made to the longwall system have accelerated at a faster pace than those made to the gate entry development system. As a consequence, unless planned years ahead of time,
Jan 1, 1997
-
Development of a Risk Rating System for Use in Underground Coal Mining
By Johann van Wjk
Mandatory Codes of Practice to Combat Rock Fall Accidents came into force on South African Collieries in 1997. These were drawn up in accordance with guidelines issued by the Chief Inspector of Mines,
Jan 1, 2002
-
Evaluation Of Support Performance In A Highly Stressed Mine
By Hamid Maleki
The U.S. Bureau of Mines implemented a monitoring program in a western U.S. coal mine for the evaluation of both conventional and alternative support systems. The conventional support consisted of 2.5
Jan 1, 1994
-
Using The Point Load Test To Determine The Uniaxial Compressive Strength Of Coal Measure Rock (993fe9c2-59a0-4335-9e4c-58da9811402f)
By John A. Rusnak
Point load testing is used to determine rock strength indexes in geotechnical practice. The point load test apparatus and procedure enables economical testing of core or lump rock samples in either a
Jan 1, 2000
-
Assessment Of Underground Structural Design
By Eugene D. Krupa
Mine 33 of Beth Energy has serious and complex roof cutter problems causing delay of the advance rate of both the entry development and longwall face retreat. The cost of maintaining these entries is
Jan 1, 1990