Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Pebble Lime From Preheater Kilns

    By J. L. Thompson

    Lime made in a coal-fired, rotary kiln has two distinct parts: the interior of the pebble which constitutes about 90% to 95% of the mass, and the surface dust layer which is the remaining 5% to 10%. U

    Jan 1, 1978

  • SME
    Structural Analysis of Composite Support for Tunnel Design Considering the Performance of Steel Sets

    By Jung-Joo Kim, Jong-Uk Kim, Turab H. Jafri, Han-Kyu Yoo

    "INTRODUCTION Steel sets such as H-type and lattice girders are often installed in the tunnels before the hardening of shotcrete to ensure the stability of conventional tunnels in soft ground conditio

    Jan 1, 2016

  • SME
    Optic Fiber Structural Monitoring System for Pavoncelli Bis Hydraulic Tunnel

    By Gabriele Eccher, Michele Caponero, Paolo Cucino, Roberto D’Angelis

    "This paper describes the optic fiber structural monitoring system implemented for Pavoncelli Bis tunnel. The paper highlights the optic fiber sensors customization capabilities, how they smoothly fit

    Jan 1, 2016

  • SME
    Development, Installation, And Effect Of An Underground Crushing And Conveying System At Pea Ridge

    By J. C. Irvine

    Meramec Mining Company, a joint venture by Bethlehem Steel Corporation and St. Joe Minerals Corporation, is engaged in the mining, concentrating, and pelletizing of iron ore from the Pea Ridge Mine lo

    Jan 1, 1972

  • SME
    Reducing Bolter Operator Exposure To Hazards (10250071-d245-48e5-87ea-cabe71bcc3da)

    By M. J. Klishis

    This paper presents the findings of a study on roof bolters' hazard exposure. A "micro-analysis" of accident data was combined with ergonomic observations of roof bolter operators to categorize b

    Jan 1, 1995

  • SME
    Ground Freezing Deep Shaft Excavation Shaft 17B-1 New York City Water Tunnel No. 3 New York, New York - RETC2023

    By Andrew Chegwidden, Tara Wilk

    Construction of Shaft 17B-1, a part of The New York City water supply system, required an excavation of approximately 38 m (123 ft) through water-bearing overburden soil and more than 152 m (500 ft) o

    Jun 13, 2023

  • SME
    Recycling And Secondary Recovery Applications Using An Eddy -Current Separator

    By D. A. Norrgran, J. A. Wernham

    Introduction In view of the continuing depletion of natural resources, requirements for energy conservation, plant optimization and hazardous waste management, and environmental consciousness, recy

    Jan 1, 1992

  • SME
    Development of a Comprehensive Mine Plan Approach for the Extraction of Icy Regolith on the South Pole of the Moon Using Surface Mine Modelling Software - SME Annual Meeting 2024

    By Mollie Hunt, William Riley, Russ Downer, Kate Willa Brown Requist, Víctor O. Tenorio, Geoffrey Gill

    One of the first activities after returning to the Moon will be finding sources of water and materials for the construction of human settlements and other infrastructure. There is evidence of the exis

    Feb 1, 2024

  • SME
    Mineral Exploration Then And Now

    By W. G. Stevenson

    The centennial celebration of the AIME provides an opportunity to review some aspects of developments in mineral exploration since 1871 and to reflect on the changes that have occurred. During this pe

    Jan 1, 1971

  • SME
    Taconite Tailings Reclamation, Techniques, And Results

    By Allan M. Hale

    Taconite tailings reclamation, especially the stabilization of tailings ponds, .dams, and slopes, can be effectively accomplished through the use of appropriate vegetation. Utilizing vegetation provid

    Jan 1, 1980

  • SME
    Optimizing pit shells in the presence of geologic uncertainty with a heuristic algorithm - SME Transactions 2018

    By C. V. Deutsch, T. Acorn

    Understanding and managing risk is of increasing concern for the mining industry. Although methods exist to model geologic uncertainty based on stochastic modeling techniques and multiple realizations

    Jan 1, 2018

  • SME
    A New Look At Underground Coal Mine Safety

    By Ernest M. Spokes

    Starting in 1980, a committee of the National Research Council studied the question of why some underground coal mines are safer than others and what could be done to improve the ones with poorer perf

    Jan 1, 1983

  • SME
    The Effect And Limits Of Particle Size In The Complete Leaching Of Sulphide Minerals In Dump Leaching Operations

    By A. S. Atkins

    The interest in the use of micro- organisms in the leaching of sulphide minerals has been traditionally exploited as a scavenger process for the recovery of valuable metal by- products from waste ore

    Jan 1, 1984

  • SME
    The Application Of Linear Goal Programming To Coal-Fired Power Plant Blending Problems

    By James E. Lonergan

    Linear goal programming is a multi-objective optimization technique where the constraints of a linear programming formulation of a problem are considered as additional objectives. The optimal solution

    Jan 1, 1984

  • SME
    Surface And Underground Mine Planning - Case Histories From Mining Consultants' Point Of View - Introduction

    By Neil B. Prenn

    Mine Development Associates, Inc. was formed in March of 1987 to provide mine engineering assistance to the mineral industry. To be competitive with other firms, Mine Development must be able to provi

    Jan 1, 1989

  • SME
    Understanding the Subsurface Conditions for the Cemetery Brook Drain Tunnel Project - RETC2023

    By Frederick McNeill, Mahmood Khwaja, Benjamin Lundsted, David Polcari, Michael S. Schultz, Timothy Clougherty

    The City of Manchester, New Hampshire, is embarking on one of its largest public works projects in history to construct a 12,000 foot long, large-diameter, conveyance tunnel through downtown Mancheste

    Jun 13, 2023

  • SME
    Acid Mine Drainage Quantity And Quality Generation Model ? Introduction

    By Vincent T. Ricca

    Acid mine drainage is a serious water pollution problem, for its contaminants will eventually effect the quality of the receiving streams. According to the Appalachian Regional Commission (1969)1, 10,

    Jan 1, 1973

  • SME
    Steep Seam Coal Mining In Western Canada By Open Pit Mining

    By Raj K. Singhal

    Canada produces close to 42 million tonnes of coal per annum of which some 38 million tonnes is produced by surface mining methods. The two Western Canadian provinces, Alberta and British Columbia, pr

    Jan 1, 1984

  • SME
    Performance Of The Homestake Mining Company Biological Cyanide Degradation Wastewater Treatment Plant August 1984 - August 1986

    By J. L. Whitlock

    A mutant strain of Pseudomonas paucimobilis is utilized to effectively degrade and or remove 90-98% of cyanide, thiocyanate, toxic heavy metals and ammonia from a cyanidation mill process and mine dis

    Jan 1, 1987

  • SME
    Study of Methane Outgassing and Mitigation in Longwall Coal Mines "Mining, Metallurgy & Exploration (2020)"

    By Jürgen F. Brune, SAMUEL A. LOLON, ADITYA JUGANDA, Gregory E. Bogin Jr

    Historically, there have been many occurrences ofmine fires and explosions recorded in the United States and other countries that have demonstrated the existence of explosivemethane–airmixtures, herei

    Aug 24, 2020