Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Use of the field-based silica monitoring technique in a coal mine: A case studyBy James J. Meadows, Jason D. Pampena, Emanuele G. Cauda, Lauren G. Chubb
Respirable crystalline silica (RCS) found in dust generated by various mining processes is an important occupational hazard in the underground coal-mining industry. Exposure can lead to disabling and
-
Application Of Reinforced-Plastic Equipment In Extraction Processes ? IntroductionBy Richard J. Lewandowski
Corrosion and product contamination have been difficult problems for extractive metallurgy industries in the U.S. because of the highly active chemicals used. During the past twelve years, other indus
Jan 1, 1970
-
Natural Gas And The Competitive Fuel MarketBy Francis J. Quinn
The Natural Gas Act, of 1938, which put interstate pipelines under the jurisdiction of the Federal Power Commission, did not place a protective competitive shield around such companies - nor does any
Jan 1, 1961
-
Characterization of respirable dust in an underground coal mine in Central Appalachia - SME Transactions 2014By R. Sellaro, E. Sarver
It has long been understood that extended occupational exposures to respirable mine dusts can lead to chronic lung disease. In underground coal mines, coal workers pneumoconiosis (CWP) and silicosis a
Jan 1, 2014
-
Florida: The New Uranium ProducerBy John W. Sweeney
Florida is usually thought of as a vacation State, not a mining State, yet Florida has been the leading producer of phosphate rock in the United States for 85 consecutive years and in 1978 supplied ov
Jan 1, 1979
-
Metallurgical Developments At Palabora ConcentratorBy Johann Steynberg
The design and construction of a Concentrator based on initial pilot plant work is rarely perfect. Palabora's plant was no exception although the basic objective to produce copper in a safely con
Jan 1, 1985
-
Human Rights and Business Procedures: Using Data to Improve Relationship with StakeholdersBy C. Eddine
"Can we use data to make communication effective? How does one successfully tackle the challenge of solving cultural differences and harmonizing the needs of diverse stakeholders while developing and
Jan 1, 2016
-
Kaolinite Microflotation And Electrokinetic PropertiesBy O. M. S. Rodrigues
The kaolinite presence in bauxite ores increases caustic soda consumption during the digestion step in the Bayer process. Depending on the kaolinite content, the utilization of the ore in the Bayer pr
Jan 1, 2011
-
New KGV Design Opens the Door to Improved Efficiency for Slurry ValvesBy Michael Prince
"Managing slurry is a constant challenge for mining operations. Since slurries are not uniform, the challenge is complicated by varying rheology, velocity, temperature and pressure, all of which affec
Feb 1, 2019
-
Vegetative Stabilization Tests On An Acidic Copper TailingBy W. R. McDonald
The U.S. Department of the Interior, Bureau of Mines, conducted field tests on acidic copper tailing as part of its program to devise, improve, and demonstrate technology for stabilizing mining and mi
Jan 1, 1979
-
Difficult Winters Challenge Exxon Subsidiary In Chile - Location And Climatic ConditionsBy Orlando Oliveros
The Los Bronces Mine and Concentrator, one of the three operating units of Compania Minera Disputada de Las Condes S.A. (an Exxon Minerals Co. affiliate), is located in the high Andes of East-Central
Jan 1, 1983
-
In It For The Long Haul At Canadian Oil Sands; New Haul Truck Beds IntroducedBy Josh Swank
Albert Einstein once said, ?the important thing is not to stop questioning.? In the mining industry, a lack of inquisitiveness may lead to a blissful ignorance but it certainly will not increase effic
Jan 1, 2013
-
Chlorinated Solvents For Coal BeneficiatingBy R. J. Nankee
Coal is our most abundant, low cost energy resource. Expansion of its use is being challenged due to "SO2 emission" regulation with even more restrictive legislation pending. High quality coal reserve
Jan 1, 1985
-
Validation Of Exponential Decay Blast Vibration Predictor With Case StudiesBy A. Ghosh
Commonly used predictors of ground vibration from blasting, being linear in log-log plot, do not model the underlying physics of wave attenuation. Amplitude of the wave decays with distance due to geo
Jan 1, 1991
-
Evaluation Of Structural Properties Of Coal Seams (66b85ecb-f5e1-4559-b6e7-ef92fd2b91ba)By Tony Szwilski
A correlation between the rank, ash content and coal seam discontinuities and coal strength/stiffness is discussed. Rebound hammers were used to evaluate the strength properties of two coal seams. The
Jan 1, 1985
-
Numerical Study of Pillars Behavior in Continuous Miner Depillaring Panel: A Case StudyBy Shailendra Chawla, Ashok Jaiswal, B. K. Shrivastva
The study aims to evaluate the pillar behavior during the depillaring operation by continuous miner (CM) technology. A panel with five headings developed as per the coal mine regulation of Indian coal
May 8, 2022
-
New dozer offers increased fuel efficiency, enhanced serviceabilityCaterpillar unveiled a new dozer, the new Cat D10T2 dozer, that builds on the success the company has had with its D10T model. The newest version of the dozer includes refinements to its power train
Mar 1, 2014
-
Construction of the N20 To N25 Tunnel (basic) Segment of the Superconducting Supercollider Project]By Joseph A. Whitchurch
The N20 to N25 Tunnel (basic) segment was the second tunnel contract awarded for construction by The PB/MK Team. This project embodied 3.9 km (2.4 miles) of tunnel and was located within the northwest
Jan 1, 1995
-
Ground And Liner Behavior During Construction Of The Mt. Baker Ridge TunnelBy Alexander I. Feldman, Michael S. Kucker, Robert A. Robinson, Harvey W. Parker
An extensive geotechnical monitoring program was used to assess ground and liner behavior, provide input to a Disputes Review Board, and verify design assumptions during construction of the Mt. Baker
Jan 1, 1987
-
Extended Application Ranges for EPB-Shields in Coarse-Grained Soils, the Lower Olentangy Tunnel Project Case History - NAT2024By Elisa Comis, David Chastka, Miriam Piemontese, Maria Chastka
The Lower Olentangy Tunnel (LOT) Project involves the construction of a 17,000 ft (5,200 m) long, 12 ft (3.65 m) internal diameter Combined Sewer Overflow (CSO) tunnel. The tunnel is excavated by usin
Jun 23, 2024