Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Operator Education: An Important Element Of The Corporate Knowledge Management EffortBy R. Zunich, E. Rybinski, M. Grondin, B. Flintoff
It is uncommon these days to read a business magazine or newspaper without finding a reference to Knowledge Management (KM), and its critical importance to corporate success. One definition of KM is:
Jan 1, 2001
-
Characterization of San Diego’s Stadium Conglomerate for Tunnel DesignBy S. J. Boone, A. Poschmann, C. Pound, A. Pace
San Diego’s Stadium Conglomerate consists of poorly cemented cobbles, gravel, sand, silt and clay. Conventional laboratory and in-situ testing is not suitable for characterizing its engineering proper
Jan 1, 2001
-
Caterpillar With Tunnel Boom Boosts Productivity On Swiss ProjectA dedicated tunnel construction version of the Caterpillar 328D LCR compact radius excavator is proving highly productive on the A9 Autoroute construction project near Visp, in Switzerland. It is the
Jan 1, 2009
-
Evaluation of deep-seated crib block fire tests (7bc9e718-229c-42f8-a8a2-7a3b0ae77860)By M. A. Trevits
The National Institute for Occupational Safety and Health (NIOSH), in partnership with the Mine Safety and Health Administration (MSHA), is conducting research to test, evaluate, improve or modify coa
Jan 1, 2009
-
Managing Contractor Safety In AustraliaBy J. Luxford
The last decade has seen an enormous increase in the use of contractors right across the Australian mining industry. So much so that contractors now operate 33 of the 68 underground metalliferous mine
Jan 1, 2000
-
Practical Geostatistics At Newmont Gold: A Story Of AdaptationNewmont Gold's methods for deposit modeling vary, depending on geology, mining and processing methods, economic feasibility and availability of historical information. It is argued that successfu
Jan 1, 1998
-
Design Considerations For Structures To Be Built On Subsidence Prone LandBy R. D. Begley
This paper will present detailed design drawings of a flexible single floor residential superstructure proposed for both longwall and room and pillar mining conditions. All efforts were made to provid
Jan 1, 1986
-
Design Concepts For Tomorrow’s Optimized Solvent Extraction Mixer SettlerBy B. Gigas, M. Preston, M. Giralico
Optimized mixer settler designs will now handle total flows of over 6,000 m3/hr.Computational Fluid Dynamics (CFD) is a timely and predictable tool for design development. Lightnin has the capability
Jan 1, 2004
-
The Effect Of Laboratory Cell Design On Flotation Machine Hydrodynamics, Solids Suspension And Particle RecoveryA large lab apparatus was designed using a scale-down methodology based on the design legacy of the current FLSmidth commercial forced air flotation machines. This new apparatus, along with a new test
Jan 1, 2012
-
Are Estimators Getting It Right? Comparing Actual And Estimated CostsBy J. Leinart
As is readily apparent, the reliability of the early-stage costs estimated for any mining project are critical to the viability of that project. An estimate too high might leave a potentially profitab
Feb 27, 2013
-
A Subsidence Prediction Model for Longwall Mine DesignBy Vladimir Admek, Paul W. Jeran, Michael A. Trevits
It has' been found that lithological conditions over the Pittsburgh Coal bed cause the subsidence coefficient to vary within the area of the subsidence trough. This precludes the use of European
Jan 1, 1986
-
Urban Tunnelling Experiences on the UK’s Channel Tunnel Rail LinkBy Keith Bowers, Frank Mimnagh, Eddie Woods
The CTRL London Tunnels The Channel Tunnel Rail Link (CTRL) London Tunnels comprise 36km of internal diameter bores that were driven by Earth Pressure Balance (EPB) Tunnel Boring Machines (TBMs).
Jan 1, 2005
-
Industrial Minerals 2004 - BromineBy R. Frim, S. D. Ukeles
The present U.S. production of bromine is from inland brines located in Arkansas and Michigan. The most concentrated domestic brines (up to 5,000 ppm bromide)are situated in Arkansas. Less concentra
Jan 1, 2005
-
Precious Metal Heap Leaching In A High Rainfall Alpine Setting At The Barrick Gold Pierina Mine In PeruBy G. Bee, Z. Gavelan, R. Espinel, Y. Roditis, X. Ochoa
In August 1996 Barrick Gold Corporation acquired the Pierina property, an advanced stage exploration project, high in the Andean Cordillera of Peru and in November 1998, in a record time of just over
Jan 1, 2002
-
Case Histories of Rehabilitation of French Railway TunnelsBy Verya Nasri
This paper presents analysis of damages and rehabilitation design for three major French rail-way tunnels built in mid-19th century. The La Nerthe tunnel underwent ovalization deformation with excessi
Jan 1, 2008
-
Evaluating Ground Conditions Ahead of a TBM Using Probe Drill DataBy Steven K. Duke, Jay Arabshahi
An economic, real-time probe drill monitoring system was developed for Metropolitan Water District’s Arrowhead Tunnels project to quantitatively evaluate ground conditions ahead of a TBM. This system
Jan 1, 2007
-
Taconite Mining – Concerns and ChallengesBy William R. Yernberg
The combined 75th Annual Minnesota Section of SME meeting and 63rd Annual University of Minnesota Mining Symposium was held April 9 and 10, 2002, in Duluth, MN. This year’s theme was “Keys to the Fut
Jan 1, 2002
-
A Discrete Fracture Network Model for Prediction of Longwall‑Induced Permeability (Mining, Metallurgy & Exploration)By E. Watkins, S. J. Schatzel, V. Gangrade, K. M. Ajayi, Z. Khademian
Longwall-induced deformations could jeopardize the mechanical integrity of shale gas well casings positioned in the abutment pillar of a longwall mine. The in situ and induced fracture networks surrou
Jun 17, 2022
-
Continuous Pilot Scale Testing Of Column Flotation For Recovery Of Fine Coal (Preprint 90-153)By J. G. Groppo
A series of performance studies have been conducted using counter-current column flotation to recover a marketable clean coal product from existing preparation plant fine waste streams. The test work
Jan 1, 1990
-
Comparison of Underground Coal and Trona Mine SeismicityBy W. G. Pariseau
"BACKGROUND Strata mechanics of three underground coal mines in central Utah were recently studied using a specialized finite element technique [1, 2, 3, 4]. The purpose of these studies was to examin
Jan 1, 2017