Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Design and Construction of an Electric Oven to Determine the Detonation Temperature of the Fulminant

    By Alexander S. Escalante, Luis R. Ramirez, Nelson A. Arostegui

    Research, analyze, discuss, design, and build an electric oven to perform one of the quality control tests the fanel or common fulminers to determine what temperatures they can detonate at. Give pract

    Feb 1, 2020

  • ISEE
    Feasibility of Applying Probabilistic Risk Assessment to Terrorism

    By Natalie Zeleznik, Brian Hawkins, David Bradley, Rachel Gooding, Patrick Wilson

    "The United States (U.S.) Department of Homeland Security (DHS) Directorate of Science and Technology (S&T), utilizes a probabilistic risk assessment (PRA) approach to explore the risks (anduncertaint

    Jan 1, 2017

  • ISEE
    Enhancing Mining Productivity during Thunderstorms with Wireless Initiation Systems

    By Orica Peru, Pedro Lozada

    Maintaining a continuous mining process during thunderstorms is one of the primary challenges in Peru's open-pit mines. Safety protocols necessitate the establishment of exclusion zones to minimize th

    Jan 21, 2025

  • ISEE
    "Journal: 100 Years / Suggested Ordinance - Explosives September, 1912"

    By Robert Hopler

    CHAPTER I. DEFINITIONS AND CLASSIFICATIONS. Definition of Explosives. SECTION 1. The term “Explosive” or “Explosives” whenever used in this ordinance, shall be held to mean and include any chemical co

    Jan 1, 2013

  • ISEE
    Blasting Related Aggregate Size Optimization

    By John Cory, Ran Tamir

    Blasting data analytics are being increasing used to increase mining productivity, reduce mining costs, maximize high margin aggregate products, and to reduce fines. Three examples will be illustrated

    Jan 1, 2012

  • ISEE
    Blasting Optimization Using Autonomous Fragmentation Monitoring System

    By B. Corrêa, M. Cavalcante

    A large open pit iron ore mine in Brazil, which has a heterogeneous lithology, faces a challenge in defining drill and blast patterns to achieve the expected results. The mine needed to obtain an aut

    Jan 1, 2024

  • ISEE
    Effect of Structural Setting on Blast-Induced Azimuthal Velocities and Amplitude of Ground Motions in Perlite

    By Catherine T. Aimone-Martin, Susan G. Beattie

    A series of small scale explosive tests were performed at a perlite mine near Socorro, New Mexico. The tests were designed to investigate the azimuthal or directional relationship between small scale

    Jan 1, 1996

  • ISEE
    A Long Round Test in Conventional Room and Pillar Mining

    By Thomas Barkley

    Mining tradition holds that a parallel round underground can not be any deeper than it’s smallest face dimension. ln other words, a mine using a 12’ (3.7 m) high by 24’ (7.3 m) wide room and pillar mi

    Jan 1, 2000

  • ISEE
    Prediction and Assessment of Rock Fragmentation by Blasting

    By D VanDoorselaere

    "Image analysis techniques are widely used for blast fragmentation measurement, and various commercial packages are available for this purpose. These packages are very versatile and serve as a useful

    Jan 1, 2007

  • ISEE
    Austin's New Delay Primper Relay

    By Roger N. Prescott

    This report presents a new process in delay blasting with the use of ANFO and slurry explosives.

    Jan 1, 1977

  • ISEE
    Improved Drill and Blast Designs Free $3.6M of Ore for Surface Copper Mine Tacio Ferreira, Dyno Nobel

    By Tacio Ferreira

    A surface copper mine in the Western United States faced challenges in recovering rock and ore from final walls because of geotechnical constraints that require restrictions on methods for loading bla

    Jan 21, 2025

  • ISEE
    TABLE OF CONTENTS 2023 General Proceedings

    By NA NA

    None

    Feb 6, 2023

  • ISEE
    ICI's ExEx2000 Blasting Systems

    By Peter Duniam, Vivian Patz

    History of the ExEx 1000 CAB system. l What we’ve learned using electronic timing. l Requirements for a second generation. EDD system. l The ExEx 2000 system - simple, versatile and cost effective

    Jan 1, 1997

  • ISEE
    Investigation of Firing Patterns on Sandstone Benches of a Surface Coal Mine - A Case Study

    By Piyush Rai

    Proper use of fi ring pattern vis-à-vis the blast requirements can provide optimal blast performance in terms of fragmentation. Further to this, each fi ring pattern has its own characteristic, for in

    Jan 1, 2008

  • ISEE
    Breaking New Ground: Deflagrating Cartridges for Urban Tunneling at Grand Central

    By Joseph A. Meyers, Michael D. Stokes

    This paper will focus on the use of Deflagrating Cartridges for tunnel excavation in Midtown Manhattan at Grand Central and 42nd Street Station, where the excavation has challenges due to the proximit

    Jan 21, 2025

  • ISEE
    Update on Blasting Near a Crusher

    By Scott G. Giltner, Alex Schwenk

    This paper is an update on a paper presented at the 2022 ISEE conference. The original paper presented how the mine operator desired to open up ore reserves near several mine structures including two

    Jan 21, 2025

  • ISEE
    Floor Blasting for Establishment of a New Crusher in Underground Limestone Mine

    By Chris Searing

    An underground room-and-pillar limestone mine in Western Missouri acquired a new primary crusher, physically larger in every dimension than the unit it replaced. Due to the space constraints within th

    Feb 6, 2023

  • ISEE
    Journal: Safety Talk / MSHA Winter Alert Beat Winter Hazards, Win with Winter Alert

    By MSHA website

    “Conditions at underground and surface coal mines can change dramatically during the winter months,” said Joseph A. Main, assistant secretary of labor for mine safety and health. “We must be ever mind

    Jan 1, 2011

  • ISEE
    Journal: 19th Annual Photo and Art Contest - Best of Show "Chimney Blasting"

    By Walter Voglauer, Elisabeth Zechmeister

    Description of Project: The four photos show a chimney blasting operation in Vienna’s district of Floridsdorf on May 4 2011. The blasting was done with two types of charges. An internal charge provide

    Jan 1, 2013

  • ISEE
    Fifteen Years of Blast Vibration Control and Improved Public Relations for Two Traprock Quarries

    By Kenneth Faroni, Catherine Aimone-Martin, Thomas Gelormino

    A blasting improvement program began in 1985 at two traprock quarries in Connecticut to reduce the levels of ground motions and airblast measured at residential structures surrounding the operations.

    Jan 1, 2000