An Innovative Approach To Load Testing Of High Capacity Piles
By P. Bermingham
A new approach to load testing of high capacity piles is presented. The method is mobile, inexpensive, repeatable and non-destructive allowing for multiple pile testing at a single site. A reaction ma
Jan 1, 1989
-
Augered Cast-In-Place Concrete Piles In Flood Plains - 1.0 Introduction
By Javaid M. Alvi
This paper is an attempt to outline the emergence of Augered Cast-ln-Place piles as one of the more economical types of foundation for supporting high-rise buildings and heavily loaded structures rece
Jan 1, 2001
-
Toward Understanding the Seismic Performance of Rigid Inclusions
By J. Tanner Blackburn, James R. Gingery, Lisheng Shao
Rigid inclusions consist of grout columns installed using displacement auger or vibrated tooling. The columns are typically installed in an array to provide support for footings, mats, or embankments.
Jan 1, 2018
-
Support Of Excavation System - Columbia Heights Metro Station Project - Washington, D.C. - Summary:
By Robert W. Bergwall
The $58,000,000.00 Columbia Heights Metro Station project (Section E3-a) forms a part of the Washington Metropolitan Area Transit Authority's (WMATA) Greenbelt Route - Green Line subway system. T
Jan 1, 1997
-
"Value Engineering" In United States Of America
By Maral Papazian Bedian
Construction contracts in the USA contain the clause "Value Engineering" ? an interesting and curious clause allowing contractor initiated design changes. Misleading is the interpretation of value eng
Jan 1, 2002
-
A Small Diameter Vibration Pile With Soil Compaction
By Miklós Kovács
A new type of the cast in situ piles is introduced. The installation of the new pile is based on a pushing in/gaining back procedure. A temporarily closed tip element with square shaped cross-section
Jan 1, 2002
-
Wave Equation Analysis And Dynamic Monitoring - A Presentation At The Deep Foundations Institute?McGill University Symposium Montreal, September 1983
By Bengt Fellenius
The conventional wave equation analysis without control of the representativeness of the parameters to the actual conditions does not provide accurate results. However, the representatives can be vast
Jan 1, 1984
-
Estimation of Shaft and Base Responses from Pile Load Test
By Vidyaranya Bandi, Madhav Madhira, Kota Vijay Kiran
"Using hyperbolic relationships for the non-linear responses of shaft and base resistances, a method is proposed for estimating initial shaft and base stiffnesses and ultimate shaft and base resistanc
Jan 1, 2017
-
Vibration Environmental Effect Of Construction Operations - Synopsis
By Mark R. Svinkin
Construction vibrations may be harmful to adjacent and remote structures, sensitive instruments and people. Construction vibration sources have a wide range of energy, displacement, velocity and accel
Jan 1, 2000
-
Lateral Performance Of Two-Section Helical Piles In Soft Soils
By Mohammed Sakr
A Two-Section Helical Pile (TSHP) is a steel pipe with two shaft sections of different diameters and with one or more helix plates near the bottom of each shaft section. TSHPs are used regularly in we
Jan 1, 2009
-
A Novel Approach To The Performance Evaluation Of Driven Prestressed Concrete Piles And Bored Cast-In-Place Piles
By Sridhar Krishnan
This paper presents the results of a comprehensive pre-production pile testing programme for the US$ 800 million 1400MW Coal-Fired Jimah Power Plant Project in Negeri Sembilan, Malaysia. The testing p
Jan 1, 2006
-
Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)
By David B. Paul
"ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class
Jan 1, 2014
-
Characterization Of Loess For Deep Foundations
By Robert L. Parsons
This paper describes the results of a detailed analysis of a loess deposit at the deep foundations test site established by the Kansas Department of Transportation. Multiple CPT, SPT, and pressuremet
Jan 1, 2009
-
Seismic Retrofit Of Bridges; Geotechnical Design Considerations And Case History
By Aly M. Mohammad
State and federal agencies during rehabilitation of existing bridges may require the existing bridges to be evaluated under seismic conditions. If the bridge does not perform under the seismic event,
Jan 1, 2006
-
Design Of Concrete Tunnel Liners And Pipes By Ring Compression Theory ? Synopsis
By W. Lum
In the U.S., flexible metal pipe culverts are designed by ring compression theory because the pipes are capable of deflecting and deriving side support from surrounding ground. For economy, tunnel
Jan 1, 2010
-
Settlement Of Tall Buildings Supported On Deep Foundations In Southeast Florida, USA
By Rudolph P. Frizzi
This paper presents different deep foundation systems and associated settlement records for high-rise building projects in the coastal areas of southeastern Florida. An introduction to the sedimentary
Jan 1, 2003
-
Specialized Slurry Wall Equipment - The Hydromill - Summary
By Mario Mauro
The article illustrates the Hydromill technology, as applied in urban sites, and its advantages in terms of quality of the end product, mitigation of the construction impact, and optimization of the l
Jan 1, 1994
-
Deep Foundations On Deer Island
By Michael W. Oakland
Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts.
Jan 1, 1994
-
Damage To Initially Bent Piles ? Synopsis
By B. B. Broms
A method for calculating the bending moment induced in misaligned or bent piles is described, The maximum bending moment varies with the angular rotation between the pile segments, the coefficient of
Jan 1, 2010
-
Analysis Of Driving Stress Measured In The RC Long Pile
By Yu Zhenquan
At the construction site of Bao Shan Iron &. Steel Mill in Shanghai, lots of RC driven piles with length of 50 to 60m were applied. The most unfavourable distribution of stress along the pile shaft wa
Jan 1, 1991