Design Of Pile Foundations For The Sand Creek Byway, Sandpoint, Idaho
By Dean E. Harris
The realignment of U.S. Highway 95 in Sandpoint, Idaho, is being designed on a site underlain by glaciolacustrine soil that includes very thick deposits of soft, sensitive clay to estimated depths of
Jan 1, 2003
-
Evaluating Lateral Bracing Code Requirements for Large Diameter Foundations
By Jon Huff, Jeffrey Donville, Hannah Iezzoni, Dan Stevenson
Occasionally, in the design of deep foundations for a structure, a single deep foundation element may be used to support a building column. The most common type of element used in such cases is a dril
Sep 8, 2021
-
Design & Construction Of Pile Foundations For A Building Complex - A Case History
By S. K. V. Avasarala
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c
Jan 1, 1995
-
Eglinton Crosstown, a New Step in Toronto’s Subway System
By Lars Richter, Franz-Werner Gerressen
"The Eglinton Crosstown Line was conceived as the Eglinton Crosstown LRT, a partially underground light rail line, announced in 2007 as part of the Transit City plan, which included the implementation
Jan 1, 2017
-
Secant Pile Walls - Design, Construction And Case History
By Ketan H. Trivedi
This paper describes the method of analyses used for the design of temporary and permanent Secant Pile Walls, describes various aspects of construction including, guide walls, sequence of pile install
Jan 1, 2006
-
Axial Pile Analyses For The New East Span Of The San Francisco-Oakland Bay Bridge
By Jacob Chacko
The east span of the San Francisco-Oakland Bay Bridge (SFOBB), which is one of the most heavily traveled bridges in the world, will be replaced due to seismic safety concerns. The majority of the new
Jan 1, 2002
-
Short Comparison Of The Determination Of Allowable Loads Of Steel H-Piles Following The Practice Applied In Different European Countries - Synopsis
By L. P. Weber
During the years 1983-1987, a research programme, jointly performed by the steel producers ARBED, British Steel Corporation, Peine-Salzgitter, Unimetal, and co-sponsored by the European Community for
Jan 1, 1991
-
Time Dependent Open-End Pipe Pile Capacity Assessment By Dynamic And Quasi-Static Methods
By Derrick D. Dasenbrock
Three piers of a new river bridge are supported on 1.067 m diameter open-end steel pipe piles. At time of drive, and after pile re-strikes, high-strain dynamic capacity values at plan tip elevations,
Jan 1, 2006
-
Case History - Augered Cast-In-Place Piling Installed Into Weathered Sandstone
By Edwin W. Meyer
The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560
Jan 1, 2006
-
A Historic Capitol And A Deep Excavation
By Richard F. Sliwoski
The Virginia State Capitol was designed by Thomas Jefferson and constructed in 1785. The Capitol is of great historic and architectural significance to not only the Commonwealth of Virginia but to the
Jan 1, 2006
-
New Possibilities for Quality Assurance of Diaphragm Wall Joints
By Joram M. Amir, Ernst Niederleithinger, Nikolaus Schneider
"Abstract: Diaphragm walls are used to provide a stable and watertight confinement for the construction of tunnels, underground railway stations, deep basements and other structures requiring deep exc
Jan 1, 2014
-
Bearing Capacity Of Long Piles Driven Into Soft Soil ? Synopsis
By F. Z. Suo
Baoahan Iron and Steel Complex is situated at lower beaches of the Yangtze River. The subsoils 50~70 M below the surface is a deposite of Yangtze River delta, consisting mainly of weak silty clay and
Jan 1, 2010
-
6000 Ton Osterberg Load Test Reduces Foundation Costs For Delaware River Tramway
By Aly M. Mohammad
The Delaware River Tramway will link civic and retail developments in Philadelphia, Pennsylvania and Camden, New Jersey. Twin 300-foot towers will anchor the cables at either side of the river. Four h
Jan 1, 2002
-
Use Of Helical Piles Set Into Soft Rock For 1500-Ton Screw Press Foundation
By David C. Kraft
A major manufacturer and user of machine tools had the need to install a screw press machine at its plant site with the following design load requirements: (1) Vertical Compression Live Load = 2000 ki
Jan 1, 2003
-
Design Of Cooper River Bridge Foundations
By Osama Safaqah
The new Cooper River Bridge will replace two existing bridges along U.S. Highway 17. The cable-stayed bridge will be one of the largest in the U.S and will connect the City of Charleston and the town
Jan 1, 2005
-
Support Of Structures In Expansive Shale Using Recycled Plastic Piles
By Lance A. Roberts
Expansive soil formations can be found throughout the United States. When subjected to wetting, these formations have the potential to swell and exert large uplift forces on buildings and foundations.
Jan 1, 2010
-
Steel H-Section Piles Support 2,120-Foot Long Cable Stayed Bridge Verona Island And Prospect, Maine
By James W. Weaver
The 2,120-foot long cable stayed Penobscot Narrows Bridge that carries US Route 1 over the Penobscot River between Verona Island and Prospect, Maine is supported on four foundation units, one below ea
Jan 1, 2011
-
Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:
By Paul Morrison
The paper describes the design process, trial testing and contract pile installation of 772 precast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig
Jan 1, 2000
-
Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora Project
By H. Boghosian
This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w
Jan 1, 2006
-
High Stress Pile Testing At Soldier Field
By Michael H. Wysockey
The load test program for the pile foundation at Soldier Field included static and dynamic load tests at four locations around the site. The dynamic tests were run with no knowledge of the static resu
Jan 1, 2002