Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A review of dry cover placement on extremely weak, compressible tailings

    By A. T. Jakubick, A. MacG. Robertson

    This paper reviews key issues related to the placement of dry (soil) covers on extremely weak, compressible fine tailings. The design and construction of soil covers on such tailings often presents a

    Jan 1, 2000

  • CIM
    Nickel Rim South -Xstrata?s First New Mine in Sudbury in 20 Years

    By Rick Collins

    Presentation Agenda 1.Sudbury Basin 2.Diamond Drilling 3.Planned Production 4.Safety 5.Timeline 6.Sustainable Development 7.Scope Elements 8.Progress 9.Delivery Approach 10.Owners and EPCM

    May 1, 2009

  • CIM
    Development of New Frothers through Hydrodynamic Characterization of Frother Chemistry

    By J. A. Finch

    "Much progress has been made over the last several years in the ability to measure flotation cell hydrodynamic parameters in both the laboratory and plant. These techniques have allowed fundamental re

    Jan 1, 2007

  • CIM
    The activation of magnesia in serpentine by calcination and the chemical utilization of asbestos tailings-a review

    By R. Le Houillier, M. Nagamori, A. J. Plumpton

    "Asbestos tailings are a typical serpentine, hydrated magnesium silicate, consisting primarily of antigorite and a few per cent of unrecovered fibrous chrysotile. Serpentine has unique thermal propert

    Jan 1, 1980

  • CIM
    The Nanuq Diamond Project, Rae Domain, Western Churchill Province, Nunavut

    By Jennifer Pell

    Dunsmuir Ventures? Nanuq diamond project is located approximately 250 km northeast of Baker Lake and 170 km north of Chesterfield Inlet. It occurs at the intersection of the Wager Bay shear zone with

    May 1, 2004

  • CIM
    Measurement of Ball Size Distribution in a 8 m x 5 m Primary Mill of Sarcheshmeh Copper Mine

    By M. Pourkani, M. Karga, Samid Banis, Andre Laplante, G. Langari-Zadeh

    "The Sarcheshmeh mine processes 40,000 t/d of ore grading 0.9% Cu and 0.035% Mo. Grinding is effected in single stage ball mills using 80 mm forged steel balls, with an average consumption of 850 g/t.

    Jan 1, 1999

  • CIM
    Geologic Setting, Geochemistry of Alteration, and U-Pb Age of Hydrothermal Zircon from the Silurian Stog’er Tight Gold Prospect, Newfoundland Appalachians, Canada

    By G. R. Dunning, M. R. Wilson

    "Abstract - The early Paleozoic accretionary tectonic regime that was established along the Laurentian margin of the Newfoundland Appalachians provided a favorable setting for shear-hosted gold minera

    Jan 1, 2000

  • CIM
    Pavoncelli Tunnel Case Study

    This paper describes the back analysis of the Pavoncelli tunnel, an hydraulic tunnel which was excavated between 1904 and 1915 in South of Italy and experienced severe damages during the 1980 Irpino-L

    May 1, 2009

  • CIM
    The Gravity Recoverable Gold Test and Flash Flotation

    By André Laplante, Robert C. Dunne

    "The role of flash flotation in precious metal recovery is reviewed. Interacting flash flotation and gravity recovery is discussed. The GRG test can be used, when linked to the behaviour of gold in gr

    Jan 1, 2002

  • CIM
    Nitrogen-Based Collectors for Sulfide Flotation – Tecflote™

    By A. Lewis, J. Zachwieja, M. Widell, P. Zhou, W. W. Geissler, M. Svensson, A. Movahedi, H. Nordberg

    Flotation collectors for sulfide minerals has been traditionally based on xanthate, thiophosphate, thiophosphinate and thiocarbamate, all derived from sulfur chemistry. Tecflote™ is a new family of pa

    Jan 1, 2019

  • CIM
    Improvements in Dust Control Technology in the Precious and Base Metals Industries

    By David R. Macedon

    "Through the years, a wide variety of dust control methods have been utilized at mineral processing operations. While some have been successful, many have been highly ineffective. Dust Control systems

    Jan 1, 2004

  • CIM
    Barrick Goldstrike Grinding Expert System

    By Steve Custer, Tim Kahl, Sue Parker

    "The primary objective of the Barrick Goldstrike expert system is to achieve the desired liberation size for the autoclave circuit while maximizing throughput. In addition, when downstream limitations

    Jan 1, 2001

  • CIM
    The San Martin project: design and operating experience in the development of a 12,000 tpd gold heap leach mine in Central America

    By Paul Hosford, Tim Haldane

    "The paper describes the fast-track development of the project from feasibility study through to detailed design and construction, highlighting the process adaptations for handling sticky ore and wate

    Jan 1, 2002

  • CIM
    Computer process control for the Kudremukh Iron Ore Company Limited

    By V. Balakrishnan, A. Hewitson

    "The Kudremukh Iron Ore Company Limited, a government of India enterprise, has constructed iron ore mining, crushing, handling and concentrator facilities at Kudremukh, in southwest India. Concentrate

    Jan 1, 1984

  • CIM
    Thompson 1-D Deposit Geology and Structure

    By Rob Stewart

    Acknowledgements ? Josef Macek(Manitoba Geological Services) ? Sally Goodman (SRK) ? Inco Geologists ? Rogerio Montiero ? Thompson Mine Geologists Introduction ? Regional Geology ? Thompson G

    May 1, 2006

  • CIM
    Rebâtir, réparer et protéger les équipements industriels de l?usure

    By Iann Bouchard

    Introduction à l?abrasion et l?érosion Avec le temps, tout solide va éroder et user les métaux les plus durs; de plus, la Corrosion va aussi laisser une couche mince et faible d?oxydation qui sera ra

    Feb 1, 2008

  • CIM
    Leaching/flotation processing of complex sulphide ores

    By Franciszek Letowski

    "Recovery of precious metals associated with a sulphidic matrix has an important economic effect on complex sulphide ore treatment. Because a significant portion of the silver and gold associated with

    Jan 1, 1987

  • CIM
    Rejection of Uranium from a Copper Gold Ore by Flotation (1d1c391d-4ab9-408d-ad31-42faa02f60e9)

    By F. Ford, J. Dong

    "Laboratory and miniplant testwork was carried out to reject uranium from an Iron Oxide Copper Gold (IOCG) deposit that contains an average of 60-70 ppm uranium with high variability. The dominate cop

    Jan 1, 2017

  • CIM
    Mineralogy and characteristics that affect recoveries of metals and trace elements from the ore at Heath Steele Mines, New Brunswick

    By T. T. Chen, W. Petruk

    The mineralogy of the feed, concentrates and tailings from the Heath Steele mill in New Brunswick was studied in detail to determine the liberation and recoveries of the major ore minerals, and to cha

    Jan 1, 1980

  • CIM
    The Application of Trackless Equipment and Conveyor Hoisting at Dumbarton Mines Limited

    By C. P. Moore, G. W. Taylor

    Vertically dipping lenses of nickel-copper ore at Dumbarton Mines Limited are being mined by a modified blasthole stoping method. The principal access to the mine is provided by a 15-degree decline, w

    Jan 1, 1973