Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Management of Copper Solvent Extraction Plants Running At Reduced Throughput

    By D. Kachongo, Y. Cheng, A. Kashala, D. Samal, G. Mitshabu

    Many copper processing flowsheets in the Democratic Republic of Congo include the leaching of oxide ores containing copper and cobalt, copper solvent extraction, copper electrowinning, and precipitati

    Jan 1, 2019

  • CIM
    Improvements in Column Flotation Through the Use of Microcel™ Spargers at Antamina

    By David Estrella, Hector M. Lizama, Jhonny Carrión

    "Microcel™ sparging systems were installed on one column of the molybdenum cleaner circuit and one column of the copper first cleaner circuit at Antamina. The Microcel™ system is known to generate fin

    Jan 1, 2008

  • CIM
    Andritz Metals Spray-Roast Acid Regeneration Pilot Plant

    By S. K. Mitterecker, T. Hofbauer, F. Baerhold

    "Acid regeneration is a very important process step in each acid leach circuit. It is required to recover dissolved metals and HCl from spent leaching acid. Andritz Metals presents its recently commis

    Jan 1, 2016

  • CIM
    An Economic and Environmental Case for Re-processing Gold Tailings in South Africa

    By James A. Brown, Marius Botha, Christopher A. Fleming

    "The technical and economic feasibility or re-processing hundreds of millions of tons of tailings in a number of historic gold tailings dams in the Witwatersrand area of South Africa is being investig

    Jan 1, 2010

  • CIM
    Leaching Of Copper Flash Furnace Dusts with Weak Acid Bleed and Arsenic Precipitation as Scorodite and Arsenical Jarosite

    By A. Roca, G. Ríos, I. Ruíz, M. Cruells

    Flash Smelting Furnace (FSF) hot dust-laden is cooled in a waste heat boiler (WHB) and then dedusted in electrostatic precipitators (ESP’s) before being treated, together with the Peirce Smith Convert

    Jan 1, 2019

  • CIM
    Update of Chilean Mining Projects and Technological Trends

    By C. Cornejo, C. Schuffeneger, J. Rosas

    "At the end of 2010 the AMSA Esperanza Concentrator started commissioning. Located in the Atacama Desert this project is the first of several large size concentrators developed recently to operate in

    Jan 1, 2012

  • CIM
    CO Oxidation Activity and Temperature-Programmed Reduction Study of Au/CuZnOx Catalysts

    By Stephen J. Roberts

    Gold catalysts were prepared on co-precipitated, calcined copper oxide - zinc oxide support by an inverse deposition-precipitation method. These catalysts were characterised by X-ray diffraction (XRD)

    Oct 1, 2003

  • CIM
    X-ray barium sulphate for North America

    By J. D. Nye, I. A. Farr, W. J. D. Stone

    "A unique deposit of barite exists near Brookfield, Nova Scotia. The crystals are extremely fine and the whole deposit virtually free of heavy metals. The deposit size was not large enough for convent

    Jan 1, 1980

  • CIM
    Creating Sustainability at Antamina

    By Steven D. Botts

    The Antamina project, owned by BHP Billiton Plc, Mitsubishi Corporation, Noranda Inc., and Teck Cominco Ltd. , is a $2.3 billion copper/zinc project, located in the Ancash Department in Perú. The proj

    May 1, 2002

  • CIM
    Simulation of an SX/EW Pilot Plant

    By Hossein Aminian, Daniel Hodouin, Claude Bazin, Claude Jacob

    "Solvent extraction followed by electrowinning (SXEW) is an economical option for the processing of low grade and oxidized copper ore. Phenomenological models were developed to simulate the copper sol

    Jan 1, 1999

  • CIM
    The St. Lawrence deposit, Seeley’s Bay, SE Ontario — A major wollastonite skarn in the Frontenac Terrane

    By T. A. Grammatikopoulos, B. Vasily, A. H. Clark

    "The St. Lawrence deposit is a large wollastonite skarn (ca. 9 Mt @ 41.3% wollastonite) adjoining the gabbroic-to-syenitic Leo Lake pluton in the granulite facies Frontenac Terrane of the Grenvillian

    Jan 1, 2003

  • CIM
    In Situ Synchrotron Radiation Diffraction during Compression of a ZKQX Alloy

    By K. U. Kainer, A. Stark, D. Tolnai, M. Hehenberger, C. L. Mendis, N. Schell, N. Hort

    Samples of an as extruded Mg-6Zn-0.6Zr-0.4Ag-0.2-Ca (wt.%) alloy was compressed at room temperature and at 250°C. The in situ deformation tests were performed at the P07 (HEMS) beamline of PETRA III,

    Jan 1, 2014

  • CIM
    A New Potential Standard in Monitoring and Optimizing Deposit Control in Mining Process Waters

    By W. J. González

    "With the increasing demand for minerals, technologies to maximize mineral recovery are paramount to a mine’s economic success. Many mining process waters have the potential to form calcium-based inor

    Jan 1, 2014

  • CIM
    Distribution of Gold in Hypogene Ore at the Ernest Henry Iron Oxide Copper-Gold Deposit, Cloncurry District, NW Queensland

    By P. J. Williams, A. R. Foster

    Petrographic studies, assay records, and laser ablation-inductively coupled plasma-mass spectrometer (LA-ICP-MS) analyses of major sulfides suggest nearly all of the gold at the Ernest Henry Cu-Au dep

    Jan 1, 2007

  • CIM
    Slurry Pumping Practice

    By C. A. Horne

    "The transportation of mineral solids in the form of slurry is a subject most of us are associated with and, in fact, live with on a daily basis. The design parameters of slurry systems and most impor

    Jan 1, 1976

  • CIM
    Reducing Mercury Production at Bald Mountain Gold Mine

    By Jim Wickens, Vince Lofftus, Mark Kravetz

    "This paper discusses how Bald Mountain Gold Mine (Ely, NV) dramatically reduced mercury production by treating process solutions with a liquid reagent based on organic sulfide chemistry. Cherokee Che

    Jan 1, 2001

  • CIM
    Improvements in HPGR and Grinding Mill Technology

    By Cosmin Carpinisan, Erich J. Hofmann, Stephen J. Hall

    "Since presenting a technical paper regarding their unique capabilities in Forged Steel Mill Gearing at the SAG-2006 Conference, Australian heavy engineering company Hofmann Engineering has pioneered

    Jan 1, 2012

  • CIM
    Truck Lift System

    ? CONSTRUCTION AND MINING COSTS ARE HIGH IN THE ARCTIC ? VERTICAL KIMBERLITE PIPES WITH HIGH STRIP RATIOS ? SITE SPECIFIC GEOMETRIC CONSTRAINTS ? OPEN PIT FOLLOWED BY UNDERGROUND MINING ? HIGH KIM

    May 1, 2003

  • CIM
    The Bethlehem Molybdenum Plant

    By E. A. Lowe, A. F. Bellamy, J. W. Smith

    "In the autumn of 1977 Bethlehem management initiated feasibility studies on recovery of by-product molybdenum from concentrate produced at the existing Highland Valley mining operation. Over the fall

    Jan 1, 1980

  • CIM
    A Geometallurgical Approach of the Copper-Nickel-Platinum Group Elements Maturi Deposit, Minnesota, USA, Using Quantitative Mineralogy

    By Charles Knilans, Tassos Grammatikopoulos, Nicole Hoffmann

    "Twin Metals Minnesota LLC, (TMM) has recently completed a prefeasibility study evaluating the development and operation of an underground copper (Cu), nickel (Ni), platinum (Pt), palladium (Pd), and

    Jan 1, 2015