Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Processing of a Tantalite Ore and The Preparation of The Carbides of Tantalum and Columbium
By Greenwood J. N
This is the fourth paper in the series on Australian w,ar materials and the work was undertaken as part of the programme for producing hard carbides. It had been intended to determine the influence of
Jan 1, 1943
-
Mineral Composition of The Tin Ores of Renison Bell Tasmania
By Edwards A. B
Renison Bell is on the Emu Bay Railway, midway between Zeehan and Rosebery on the west coast of Tasmania. The tin deposits in this area have been described by G. A. WaIler (1902), L. K. Ward (1909), H
Jan 1, 1943
-
Robustness of Geostatistical Calculations: A Case Study
A study of drilling data at various stages of development of an orebody show that the semi-variogram, used for calculating the accuracy of block estimates can be ill-defined if too few data are availa
Jan 1, 1977
-
Project Delivery
By E Skinner, G Lane
Project delivery strategies are determined by project context, business case requirements, scale of project, market conditions, ownerÆs capability and preference, contractorÆs experience, resource and
Jul 15, 2013
-
Design of the Second Block Cave at Northparkes E26 Mine
The pressure of low commodity prices forced the design process for the second lift of Northparkes E26 Mine to adopt a continuous improvement philosophy. The emphasis was to minimise capital expenditur
Jan 1, 2001
-
Pilot Scale Carbonization of Wallarah Coal Using the Parry Process (6d646f40-1507-4d07-950f-53652f2f845c)
A pilot plant was constructed for the low temperature carbonization of Wallarah (N.S.W.) coal at the rate of 300 lb/hr. The design was based on an entrained state carbonizer developed by Parry and D.S
Jan 1, 1963
-
Environmental Management Systems for Mining Companies
The increased focus on best practice environmental management has led to mining and mineral processing companies developing a variety of procedures to ensure that the environmental impacts of their op
Jan 1, 1995
-
Beneficiation of Nickel Lateritic Ore from Montes Claros de Goißs, Brazil
Beneficiation of Nickel Lateritic Ore from Montes Claros de Goißs, Brazil Beneficiation is a key factor for both technical and economical aspects of industrial processing of nickel lateritic ores. A
Sep 13, 2010
-
Hydrocarbon Potential of the Great South Basin
By M Carter
The Great South Basin is located beneath the northwest part of the Campbell Plateau, a+broad, nearly level, triangular shaped submarine platform, southeast of the South Island of New Zealand. It encom
Jan 1, 1983
-
Avoid Average Design in Processing Plants
The quantity, quality and detail of project information increases as project development moves from initial scoping level studies, to pre-feasibility and option studies, then definitive feasibility st
Jan 1, 2004
-
Mineralisation and Structural Setting of the Rise and Shine Shear Zone, Otago Schist: Comparisons to the Macraes Deposit
By D Craw, L Cox, R J. Norris
The Rise and Shine Shear Zone is a mineralised low-angle deformation zone traceable for at least 7 km through biotite zone schist of the Dunstan Range, central Otago. The zone is commonly believed to
Jan 1, 2005
-
Speculations on the Origin and Formation of the Diamond with Especial Reference to its Formation and Position at Bingara, N.S.W.
The latest outcome of science is that aII bodies are composed of vibrating atoms or molecules. In almost all mineral bodies when changing from the gaseous or liquid condition to the solid, if the vibr
-
The Occurrence of Gold in the Broken Hill Lode
The smelting of the Broken Hill lead concentrates at the Broken Hill Asso,ciated Smelters produced, among other products, approximately 4,900 ounces of gold and 8,800,000 ounces of silver during the y
Jan 1, 1940
-
Kalgoorlie Tailings Retreatment Project- A Case Study
The Kalgoorlie Tailings Retreatment Project (or "Kaltails") involves the reclamation and retreatment of approximately 50 million tonnes of gold tailing situated on the Golden Mile at Kalgoorlie, Wes
Jan 1, 1990
-
Controlling Product Quality at High Production Rates as Applied to BHP Billiton Iron Ore Yandi Fines Operation
By T Howard, J E. Everett
BHP Billiton Iron Ore has replaced the conventional product quality control batch system at Yandi with the Continuous Stockpile Management System (CSMS) centred on a fully integrated æcontinuousÆ stoc
Jan 1, 2002
-
An Occurrence of Hydrothermal Eruption Breccia, Onemana, Coromandel Peninsula, New Zealand
By M R. Stevens
An approach of geological mapping and descriptive criteria has been used to identify hydrothermal eruption breccias, named the Onemana Breccia. These in part mantle a gold bearing fossil hydrothermal
Jan 1, 1991
-
Diamonds: The Ultimate in Added Value
Australia is not capitalizing on the raw gems and precious minerals that it produces in abundance. In particular, there is an unrealised value for diamonds due to lack of processing after mining. A
Jan 1, 1989
-
Theoretical Analysis of the Countercurrent Gas-Solid Heat Transfer During the Drying of Brown Coal Briquettes with Circulating Gas
By Sharpin P. C
The countercurrent gas-solid heat transfer during the drying of brown coal briquettes in the pilot carbonization plant at Morwell has been analysed and theoretical gas and solid temperature distributi
Jan 1, 1966
-
Measurement of Blast Vibrations: Compliance under the RMA
With the change in legislation under the Resource Management Act 1991 (RMA), the responsibility for administering the effects of blasting on the environment, has transferred from an essentially centra
Jan 1, 1996
-
Comparative evaluation of manual sampling and Outotec MSA 2/50 metallurgical slurry sampler
By J Loimi, P Minkkinen, T Korpela
The head loss caused by metallurgical sampling for slurry streams can be reduced by metallurgical sampler design. When the process volumetric flow rate is reduced by vertical static cutters before the
May 9, 2017