Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Fingerprinting and Signatures - Tracing Mine Impacts in Complex Aquatic Systems

    By C Bonini, A Markham, P Whittle, B Pearson

    "Mine-derived sedimentation in rivers can have significant impacts on the processes and features of the receiving environment and impact on communities reliant on this environment. However, identifyin

    Nov 26, 2013

  • AUSIMM
  • AUSIMM
    What is the Oxygen Depletion Potential of ?Water Vapour?

    By M A. Tuck

    Atmospheric air on a moisture free volume basis consists of approximately 21 per cent oxygen. The current minimum threshold for oxygen in Australia is 19.5 per cent. Atmospheric air generally will als

    Aug 31, 2015

  • AUSIMM
    Geochemical Mass Balance and Characterisation of Pollutants Draining from a Nickel Mine Site

    By N Dube, K L. Sandvik, C Mutevhe

    Trojan Nickel Mine is the largest producer of Ni, Cu and Co in Zimbabwe. The mine has operated a nickel flotation concentrator and base metal refinery continuously since 1969, creating 28 million tonn

    Jan 1, 2006

  • AUSIMM
    Some Bosh and Hearth Features of Blast Furnaces in India Operating with High Ash Coke

    By Singh BN, Chakravarty PK, Chatterjee LM

    Indian blast furnaces operate with coke gener- ally containing 24 to 28% ash compared to 10-15% ash in coke in most other parts of the world. The operating problems are further aggravated by the hi

    Jan 1, 1981

  • AUSIMM
    The Effects of Increased Salinity on Microbially Mediated Ecosystem Processes in Ephemeral Streams

    By J L. Kerr, J Beyer-Robson, S Vink

    Driven by an increasing need for water conservation, coal mine operators in the upper Isaac River catchment have placed significant emphasis upon the reuse of water. This initiative led to an overall

    Nov 26, 2013

  • AUSIMM
    Former metal mining areas in England and Wales – local residents’ preferences for the management of wastes

    By A M. Sardo, D E. Sinnett

    This study uses the Q Method to examine how those living in former metal mining landscapes value this heritage and their preferences for the long-term management of mine waste. Such sites are often pe

    Jul 23, 2018

  • AUSIMM
    The Design and Installation of a Booster Fan at Tahmoor Colliery

    By M Ogle

    "Booster fans are relatively rare in Australian coal mines. However, as mines become progressivelydeeper it is likely that such fans will be increasingly adopted as a method to sustain or improve the

    Jun 1, 2012

  • AUSIMM
    Tailings Dam Seepage at the Rehabilitated Mary Kathleen Uranium Mine, Northwest Queensland, Australia

    By P M. Ashley, M T. Costelloe

    The Mary Kathleen tailings storage facility (TSF) contains 7.1 Mt of uranium mill tailings. This waste repository was rehabilitated in the mid-1980s using a multibarrier dry cover. At the time of mine

    Jan 1, 2003

  • AUSIMM
    Negatively Geared Ore Reserves – A Major Peril of the Break-even Cut-off Grade

    "Recognising that the mining industry is wedded to the break-even cut-off grade rather than a cut-off grade that optimises value, the author examines some perils and pitfalls in the use of break-even

    Mar 8, 2016

  • AUSIMM
    Recent Investigations of Submarine Hydrothermal Activity in Indonesia

    By I Zulkarnain, H Permana, R A. Binns

    Through an ambitious but relatively low-cost program of marine fieldwork, laboratory investigations and technology-transfer and training activities, three Indonesia-Australia-led marine expeditions we

    Jan 1, 2004

  • AUSIMM
    Groundwater at the Underground Coal Gasification Site at Chinchilla, Australia

    By S Fidler

    Underground coal gasification (UCG) is a process by which coal is converted in situ to a combustible gas that can be used as a fuel or chemical feedstock. The process has been used in commercial-size

    Jan 1, 2003

  • AUSIMM
    Special Purpose Simulator for Improved Estimation of Day-to-Day CIL/CIP Recoveries

    Sampling of CIL/CIP circuits is typically done by compositing samples of feed and tails over eight or 12 hour periods. As the residence time in the leaching tankage may be approximately 20 hours, the

    Jan 1, 2006

  • AUSIMM
    Using Reverse Circulation Drilling to Improve Sampling in a Complex Underground Gold Operation – An Innovative Approach to Underground Grade Control at the Sunrise Dam Mine, Western Australia

    By F Clark, J T. Carswell

    Ore definition for final stope planning is often a challenging prospect in underground (UG) gold mines which exhibit high geological and grade variability. Unlike the grade control (GC) scenario in an

    Aug 18, 2014

  • AUSIMM
    When Does Further Processing at the Mine Site Make Sense?

    By G Lane, S La Brooy

    A century ago, new mines were often accompanied by smelters. In Australia, smelters were built at the Daydream mine near Broken Hill, at Kuridala and Mount Elliott near Mount Isa, Broken Hill, Mount L

    Jan 1, 2008

  • AUSIMM
    Multiple Indicator Kriging - Is it Suited to My Deposit?

    By D Guibal, J Vann, M Harley

    Many sample value distributions are highly skewed and present variograms with high relative nugget effects and/or short-range structures. In consequence, significant deskewing of the histogram and var

    Jan 1, 2000

  • AUSIMM
    21st century relining – the path to greater mine site profitability

    By P Rubie, J Russell

    This paper looks at the past, present and not too distant future of grinding mill relining.Since the adoption of autogenous grinding (AG) mills and semi-autogenous grinding (SAG) mills as the primary

    Aug 29, 2018

  • AUSIMM
    The Median versus the Mean Fragment Size and Other Issues with the Kuz-Ram Model

    By F Ouchterlony

    Soviet precursors to Cunningham’s Kuz-Ram model from 1983 are described. They are rooted in the mean fragment size and Rosin-Rammler (RR) fits to sieving data and rely on approximations. Three version

    Aug 24, 2015

  • AUSIMM
    Effective Contracting Through Partnering

    By Stewart R. D, Lawrence W, Youl M. J

    The trend towards contracting by major coal mining companies such as BHP Coal and MIM Ltd is examined. Reasons why this trend is occurring are discussed and the concept of partnering is examined.

    Jan 1, 1997

  • AUSIMM
    A Method for Establishing Site Specific Coal Pillar Design Guidelines

    By Mills KW

    Coal mine pillar design formulae available to mine planners are typically based on relationships determined for specific site conditions. Application of these methods is difficult when other factor

    Jan 1, 1992