Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mining at Golden Cross

    The Golden Cross mine commenced production in December 1991. Both open pit and underground mines produce 1000 tonnes of ore per day. Mining techniques are discussed along with results and variations t

    Jan 1, 1992

  • AUSIMM
    Development of an iron ore microparticle binder for increasing the concentrate content of sinter blends

    By Y Yamaguchi, S Nomura, M Matsumura, C Kamijo

    In order to increase productivity and decrease reducing agent rate (RAR) of blast furnaces, slag content of sinter ore must be decreased. However, gangue content in iron ore tends to increase because

    Jul 24, 2017

  • AUSIMM
    Effective Dry Density Benefication of Coal

    Effective Dry Density Benefication of Coal

    Sep 13, 2010

  • AUSIMM
    VisuMet – analyses of lumpy iron carriers with image processing

    By H Mali, B Kain-Bückner

    Different types of lump iron ore-bearing particles were investigated in terms of their raw material properties depending on their behaviour during reduction. To predict the reduction behaviour differe

    Jul 24, 2017

  • AUSIMM
    Grey River Gold Dredge Project

    Grey River Gold Mining Ltd commenced dredging alluvial flats in the Grey River Valley in 1989. Previous drilli

    Jan 1, 1990

  • AUSIMM
    Achieving Acceptable Dredge Availability at Grey River Gold Mining Limited

    The achievement of high availability of the Grey River Gold Mining Limited's alluvial gold dredge is a tortuous task which will rely upon the dedication of all staff employed at Grey River Gold M

    Jan 1, 1989

  • AUSIMM
    Stacking and Reclaiming Facilities at the Thiess Bros Pty Ltd, South Blackwater Coal Mine from Conception to Operation

    By R Hoskings

    Conceptual studies of the run of mine stockpiling and reclaiming requirements commenced in 1975. Final selection of equipment was made in 1978 and the equipment was commissioned in June, 1979. Equipm

    Jan 1, 1980

  • AUSIMM
    Ultimate Pit Limit of Iron Ore Mines using Maximum Flow Algorithms

    A major problem in open pit mine planning is to determine the optimum pit limit of the mine. The optimum pit limit is the one with maximum discounted net profit and satisfies technical conditions. A n

    Dec 6, 2010

  • AUSIMM
    The Flotation of Alluvial Gold

    By S G. Keyte

    Gravity methods of recovering alluvial gold are not very efficient at particle sizes below about 0.l mm. Whereas such gold may not have been economic to recover in the past, the same may not be true t

    Jan 1, 1990

  • AUSIMM
    Some Aspects of Tailings Disposal

    By C J. Hogan

    Increasing demand for fine grinding to improve mineral liberation and metal recovery and the need for stricter control of the environmental impact of tailings deposition poses problems for tailings di

    Jan 1, 1993

  • AUSIMM
    Geophysical Signatures of Andesite Volcanoes in New Zealand - Contrasts and Structural Implications

    By C A. Locke

    Geophysical signatures of the Taranaki and Tongariro volcanoes reflect similarities in their age, composition and hydrothermal histories, but also reflect differences in host rock settings and edifice

    Jan 1, 1995

  • AUSIMM
    Mineral Exploration Comparison Across the Tasman

    The early development patterns of both Australia and New Zealand were substantially in parallel and both were heavily indebted to gold mining for, providing the stimulus to growth. However, since the

    Jan 1, 1982

  • AUSIMM
    Gold-Silver Mineralisation at Neavesville, Coromandel Peninsula, NZ

    By L Torckler, R L. Brathwaite

    At Neavesville gold-silver (electrum) mineralisation occurs in steeply-dipping zones of intense fracturing, brecciation and quartz veining within rhyolitic pyroclastics, carbohaceous shales and andesi

    Jan 1, 1980

  • AUSIMM
    Development of a Special Purpose Coupling for Jointing Polyurethane Lined, High Pressure Pipework

    The New Zealand Steel Ironsand Slurry Pipeline was successfully commissioned in February 1986. The project includes 18 km of high pressure, polyurethane lined buried pipe. McConnell Dowell Constructo

    Jan 1, 1986

  • AUSIMM
    Old Copper Flotation Tailings Waste Reprocessing

    Old Copper Flotation Tailings Waste Reprocessing

    Sep 13, 2010

  • AUSIMM
    A Sustainable Minerals Sector in Australia? Thoughts from a Science and Technology Perspective

    In the context of sustainable development, the Minerals Council of Australia (2010) states that 'investments in minerals projects should be financially profitable, technically appropriate, enviro

    Jun 1, 2010

  • AUSIMM
    Methods for Improving the Flotation Recovery of the Coarse Fraction of a Nickel Ore

    Methods for Improving the Flotation Recovery of the Coarse Fraction of a Nickel Ore

    Sep 13, 2010

  • AUSIMM
    Study on Flotation of the Low-Grade Magnesite Ore

    Study on Flotation of the Low-Grade Magnesite Ore

    Sep 13, 2010

  • AUSIMM
    The Use of Electronic Nose Devices for Coal Self-Heating Detection

    Electronic noses are being used in the processing industries and in fields such as environmental and occupational hygiene to detect a wide variety of problems from contaminated foods to toxic chemical

    Jan 1, 2005

  • AUSIMM
    Study on a Novel Polymer/Bentonite Compound Adsorbent for Removal of Cu(II) from Aqueous Solution

    Study on a Novel Polymer/Bentonite Compound Adsorbent for Removal of Cu(II) from Aqueous Solution

    Sep 13, 2010