Search Documents

  • ISEE
    Improved Blasting Using Low Density Ammonium Nitrate Prills; Improved Fragmentation via the Use of Blast Controls Plans

    By Ron Frye, Carl Liibbe, Wayne Curtis, Julie Pecori, Dan Leach

    Test work comparing the performance of a Low Density Porous Ammonium Nitrate Prill to regular Porous Ammonium Nitrate conducted in Pennsylvania and New York showed that less ammonium nitrate was requi

    Jan 1, 1997

  • SME
    Performance Of The Lorraine Mine Site Cover To Limit Oxygen Migration

    By Bruno Bussière, Michel Aubertin, Anne-Marie Dagenais, Johanne Cyr

    A five steps remediation program was commissioned in 1998 for the acid generating Lorraine mine site, located in the Témiscamingue region, Quebec, Canada. It included, as the main expenditure, a cover

    Jan 1, 2005

  • SME-ICGCM
    Design And Control Of Working Support In Polish Coal Mines Based On Three-Dimensional Numerical Modeling

    By Slawomir Bock

    One of the fundamental issues having a great influence on the safety of operations performed in underground mines is the support of workings which should assure their stability in a given geological s

    Jan 1, 2009

  • AUSIMM
    Presidential Address-The Hauraki Goldfields, N.Z. (d4987ecd-7c0b-443f-b1ef-df0f3c599ca2)

    YOUR Excellency, Fellow Members of the Australasian Institute of Mining Engineers and Gentlemen:-Nearly a decade has passed since our Institute first met in New Zealand. May I, at the very outset of t

    Jan 1, 1912

  • AUSIMM
    Research Procedure in an Investigation into the Basic Causes of High Tailing Loss at Mt. Morgan

    The concentration of Mt. Morgan sulphide ore has always been attended by serious loss of gold. Until recently, with a simple selective flotation flowsheet, even the lowest grade of ore milled-about 2

    Jan 1, 1939

  • SME
    Large diameter tunneling in Seattle is a sign of things to come

    By Christopher Bambridge

    The Washington State Department of Transportation (WSDOT) is constructing a new tunneled route under Seattle to replace the existing State Route 99, Alaskan Way Viaduct (AWV), which follows the histor

    Sep 1, 2013

  • SAIMM
    Numerical Modelling Of The Yielding Of A Stabilizing Pillar/Foundation System And A New Design Consideration For Stabilizing Pillar Foundations

    Following a short review of selected literature, a back analysis of stress measurements of stress regeneration in a closed mini-longwall is shown. The agreement is good, lending confidence to the para

    Jan 1, 1998

  • AUSIMM
    Metallurgical Practice in the Beach Sands Industry

    The history of the industry which recovers rutile and zircon from the heavy mineral beach sand deposits of Eastern Australia began with the initial discovery of zircon in 1895. Whereas a large number

    Jan 1, 1963

  • AIME
    Mining - Drilling Practice in Swedish Mining

    By Ingvar Janelid

    DURING the last ten years, in the effort to save manpower and costs, methods of drilling and blasting in Sweden have changed and developed in a revolutionary manner. These developments have been accom

    Jan 1, 1955

  • DFI
    Practical Experience With Nondestructive Testing Of Augered Cast-In-Place Piles

    By Bernard H. Hertlein

    All methods of deep foundation construction present challenges to the contractor and engineer that vary according to the method employed, and the geotechnical conditions in which it is being used. Aug

    Jan 1, 1997

  • SME
    The Potential Of GPS Guidance In The Mining Industry

    Recent advances in GPS, machine guidance technology and telemetry allow an unprecedented level of control of surface mining operations. GPS technology can now locate the bucket of a shovel or the blad

    Jan 1, 2004

  • AUSIMM
    Applied Mineralogy of the Kevitsa Nickel-Copper-PGE Deposit, SodankylS, Northern Finland

    By F Gervilla, J Laukkanen

    The Kevitsa Ni-Cu-PGE deposit in northern Finland contains disseminated Ni-Cu-Fe sulfides, and platinum-group minerals (PGM). The 2.05 Ga-old ultramafic-mafic, funnel-shaped intrusion is intruded into

    Jan 1, 2008

  • TMS
    Recovery of Nickel and Cobalt by Pyrometallurgical Process of Waste from Producing Program of Nickel Metal Hydride Batteries

    By Hui Wang

    With the great increasing use of nickel metal hydride batteries recently, the waste of this kind batteries have been paid for close consideration. For the main reason that the waste of the batteries c

    Jan 1, 2009

  • IOM3
    In-situ ground stress measurements and their effect on the design of Pergau hydroelectric project, Malaysia

    By R. Patel, D. R. Taylor, P. M. Varley

    In-situ measurements of ground stress were made from surface boreholes, using overcoring and hydrofracturing techniques, to obtain data for the detailed design of the underground works at Pergau. Unex

    Jun 19, 1905

  • SAIMM
    LHD optimization at an undergroundchromite mine

    By W. Mbhalati

    "Conzal Mine was not meeting production targets in 2013, and it was established that this was caused by the inability of the load haul dump machines (LHDs) to tram the required tonnages. An investigat

    Jan 1, 2015

  • AIME
    Minerals Beneficiation in 1962

    In 1962, minerals beneficiation showed definite signs of coming out of the doldrums into which it has drifted after the uranium boom. Demand by steelmakers for high-grade iron pellets has created

    Jan 2, 1963

  • NIOSH
    Reducing Enclosed Cab Drill Operator’s Respirable Dust Exposure With Effective Filtration And Pressurization Techniques

    By Michael Schmitz, Eugene Ahrenholtz, William A. Heitbrink, Jeanne A. Zimmer, Andrew B. Cecala, Ernest S. Moyer, Earle H. Andrews, Chris C. Coppock, John A. Organiscak

    Many different types of surface mining equipment use enclosed cabs to protect equipment operators from health and safety hazards. The overburden removal and mining process can be extremely dusty and c

  • SME
    Dewatering for the Lenox Avenue Subway Reconstruction Project

    By Paul C. Schmall, Thomas Tuozzolo, Arthur B. Corwin

    The Lenox Avenue Reconstruction Project involved the excavation and replacement of 750 m (2,500 ft) of deteriorated subway invert concrete, 5 to 7 m (15 to20 ft) below water table in very permeable gr

    Jan 1, 2001

  • TMS
    Synthesis and Characterization of ZrB2 Produced with Molten Salt Electrolysis

    By Selda Ozkan

    In this study, a combination of cathodic arc physical vapor deposition (PVD) and molten salt electrolysis methods were used to obtain ZrB2 layers on AISI 304 grade stainless steel surface. Prior to bo

    Jan 1, 2010

  • AIME
    Concreting Drifts at Ray Mines Division of Kennecott Copper Corporation

    By Robert Thomas

    DURING the past 20 years the advantages of reinforced concrete as a substitute for timbering in so-called permanent mine openings have been fully recognized, and its use has become almost general prac

    Jan 1, 1936