Search Documents

  • CIM
    Using 3D Computer Simulation to Improve Construction Project Planning

    By Patrick Cloutier

    Presentation objectives ? Introduce discrete-event 3D computer simulation as a tool to design, improve and optimize construction projects: ? Describe a real typical construction project planning i

    Aug 1, 2013

  • SME
    Establishing Geotechnical Baseline Values for Deep Soft Ground Tunnels

    By John E. Newby

    The Brightwater Conveyance System consists of four tunnel segments in three tunnel con-tracts, comprising over 21,760 m (71,400 ft) of pressurized face tunneling in complex glacial and non-glacial sof

    Jan 1, 2008

  • AUSIMM
    Presidential Address. Some Applications of Geology to Mining and Metallurgy

    Professor Skeats said: I wish at the ,outset to express my appreciation of the h0!-l0ur conferred on me by my election as President of this Institute for the ensuing year. The selection of a geologist

    Jan 1, 1924

  • AUSIMM
    Emerging Technologies for Ironmaking - An Indian Perspective

    By Prasad S, Chatterjee S. S, Singh B. N

    The chief source of metallic iron for steelmaking in India, even today, as it is in most part of the world, is through blast furnace (BF) route. This will continue to be so in the foreseeable future

    Jan 1, 1999

  • AUSIMM
    Analyses of Some New Zealand Scheelites

    Analyses of scheelite from all the known scheelite fields in the South Island of New Zealand have shown that the scheelites are essentially molybdenum-free. The scheelites are almost stoichiometric Ca

    Jan 1, 1970

  • AUSIMM
    Robotic Hang-up Assessment and Removal of Rock Blockages in Mining Operations Using Virtual Reality for Safety

    By G Baiden

    The removal of rock blockages in mining operations has long been a risky undertaking, especially in high overhead conditions. Moreover, the assessment of where to put charges and the placement of them

    May 9, 2016

  • NIOSH
    OFR-162(2)-81 Interactive Mine-Power-System Analysis - User's Manual

    By Richard A. Rivell

    This document is a users manual intended as a reference for personnel interested in the analysis of coal-mine-electrical-power systems under either normal operating conditions or fault situations. The

    Jan 1, 1980

  • AIME
    Open-Pit Mining Operations

    By L. E. Fish, G. S. Wyman

    CHUQUICAMATA open-pit mine is capable of producing a total of 105,000 tons daily. When the sulphide plant is operating to capacity the distribution of this quantity will be approximately 30,000 tons s

    Jan 1, 1952

  • SME
    Shanxi Wanjiazhai Yellow River Diversion Project—Lots II & III

    By Edgardo Fogli, Mario Lampiano, Antonio Nicola

    The project is located in the northern region of the People’s Republic of China and was awarded to Impregilo, as sponsor of the Wan Long Joint Venture, in September1997. The project consists of fo

    Jan 1, 2001

  • AUSIMM
    Analysis of jig behaviour in coal preparation plants in China

    A wide-ranging base of jig data was collected from various types of commercial jigs in 9 coal preparation plants in China, and a complete data analysis was made. It was found that the sharpness ofsepa

    Jan 1, 1986

  • SME
    Jet Grout Ground Modifications for the Brightwater Conveyance System

    By Richard Hanke

    Tunnel construction on the Brightwater Conveyance System?s East and Central contracts required ground modifications of the existing site soils, comprised of sandy alluvium to very dense glacial till,

    Jan 1, 2008

  • SME
    Expert Control Of A High Altitude Crushing Plant

    By M. Valdebenito, J. Rajala

    An OCS Expert control system was implemented by Svedala Cisa at the Minera Maricunga Refugio Crush-Leach Operation near Copiapo, Chile. The purpose of the Expert system was to maximize production thr

    Jan 1, 2002

  • NIOSH
    Reservoir Simulation-Based Modeling for Characterizing Longwall Methane Emissions and Gob Gas Venthole Production

    By S. J. Schatzel, W. P. Diamond

    Longwall mining alters the fluid-flow-related reservoir properties of the rocks overlying and underlying an extracted panel due to fracturing and relaxation of the strata. These mining-related disturb

  • AUSIMM
    The Geometry of Mineralisation and Exploration Models for the Blackwater Mine in the Reefton Goldfield

    At Waiuta near Reefton there is a remarkable vein of quartz <1 m thick which, apart from small offsets on late-stage faults, is a sheet like body essentially continuous down-dip and along-strike fo

    Jan 1, 2000

  • CIM
    Overview of Lake Shore Gold’s 2012 - 2013 Bell Creek Mill Expansion

    By D. B. Felsher

    "Lakeshore Gold’s Bell Creek Mill is located in Timmins, Ontario. The mill has been in operation since 2009 and has undergone several small expansions since then. In 2012 - 2013 the first major mill

    Jan 1, 2015

  • ISEE
    Garbage Plug Demolition Using a Low Detonation Velocity Explosive in “Presa Mixcoac” Dam, in Mexico City

    By Enrique Albarrán, Julian Hernández

    "In 1942 The “Presa Mixcoac” dam was built, along with 15 other dams, to control the rain fall waterin the mountains west of Mexico City. Mexico City’s population at that time was around 1.5 millionpe

    Jan 1, 2016

  • SAIMM
    The Impact Of Mixed Fleet Hauling On Mining Operations At Venetia Mine

    By J. Krzyzanowska

    Paper written on project work carried out in partial fulfilment of Bachelor of Engineering-Mining Venetia Mine, an open-pit diamond mining operation in the Limpopo Province of South Africa, current

    Jan 1, 2007

  • SME
    Big News And Excellent Sessions Define 2009 Fox Conference

    As the 2009 George Fox Conference neared its conclusion, Arthur Silber, project chief of the Mass Transit Tunnel (MTT) project was able to pull away from the constant buzzing of his Blackberry long en

    Jan 1, 2009

  • CIM
    Geophysical Case Study of Shallow and Deep Structures Based on Traditional and Modified Interpretation Methods: Application to Tectonic Studies and Mineral Exploration

    By J. Asfahani

    "The Schlumberger configuration used in geoelectrical sounding is slightly adapted here to obtain reliable data for both shallow and deep penetration depths from the same survey. In this configuration

    Jan 1, 2009

  • DFI
    Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic Retrofit

    By A. R. Dover

    The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew

    Jan 1, 2008