Search Documents

  • AUSIMM
    Measurements and Modelling of Evaporation from Abandoned Mine Pit Lakes

    By T van Niel, M Trefry, B Baker, I Rea, A Hawdon, D McJannet, D Boadle, R Fandrich, A Littleboy

    Many open cut mines extend to depths well below the natural water table level with constant dewatering required to maintain operations. When mining activities cease the groundwater starts to fill the

    Jun 28, 2016

  • AUSIMM
    Life-of-mine Spillway Strategy – Managing Risk Associated with Surface Water at a Tailings Storage Facility

    By K Brand, M J. Ind, M Rynhoud

    Water management at a tailings storage facility (TSF) presents one of the major risks to the safe performance of the facility. International and domestic dam safety guidelines assess a dam’s hazard ca

    Jun 28, 2016

  • AUSIMM
    Optimising Land for Beneficial Use During and After Mining

    By J Purandare, D Murdoch

    The goal of the life-of-mine plan is to ensure that while the site is left safe, stable and non-polluting, the landscape is such that optimal use can be made of the site post-mining and closure. Howev

    Jun 28, 2016

  • AUSIMM
    Preparing for Progressive Mine Rehabilitation Sign-off in Queensland

    By P Swart, A Fletcher, P D. Erskine

    Glencore Coal Assets Australia (GCAA) operates five coalmines in Queensland and has rehabilitated thousands of hectares of mined land across these sites. Accordingly, GCAA seeks to continually improve

    Jun 28, 2016

  • AUSIMM
    Rainfall Patterns Rather than Climate Classification Control Cover Design for Closure

    By T Baumgartl, B Richards

    Covers on waste rock and tailings remain the primary choice for closure planning where the purpose is to create an environment where water ingress into reactive material can be controlled and/or preve

    Jun 28, 2016

  • AUSIMM
    The Social Licence to Operate and Drivers for Change – Resource Reporting and Mine Material Characterisation

    By J Heyes, G A. Maddocks, R J. Stewart, G D. Corder

    Mining is an international business and vital contributor to national and global economies. It depends on the trust and confidence of investors and stakeholders for its financial and operational well-

    Jun 28, 2016

  • AUSIMM
    Natural Capital Accounting – a Sea Floor Mining Application

    By R Grogan

    Nautilus Minerals Inc is a sea floor resource exploration and development company focused on developing the Solwara 1 Project, a copper-gold sea floor massive sulfide deposit in the territorial waters

    Jun 28, 2016

  • AUSIMM
    Applications of Advanced Remote Sensing Systems during a Mine Life

    By B P. Banerjee, S Raval

    In the recent past there have been dramatic advancements in the development of remote sensing platforms (satellite, aircraft and unmanned aerial vehicles – UAVs) as well as sensor systems (multispectr

    Jun 28, 2016

  • AUSIMM
    Reassessing Rehabilitation Objectives and Targets for Mature Mining Operations in Queensland

    By T R. Anderson, A R. Butler

    Haymont (2012) notes that in parts of Australia significant areas of mining disturbance cannot be relinquished. In Queensland it has been estimated that by 2010, just 0.3 per cent 507 ha of mining dis

    Jun 28, 2016

  • AUSIMM
    Waste Rock Pile Construction to Lower Closure and Relinquishment Costs

    By J R. Taylor, J A. Muchan, S M. Pape, B S. Davis

    Acid and metalliferous drainage (AMD) is routinely derived from waste rock, tailings, pit wall rock, underground mine voids, heap leach pads, ore stockpiles, concentrate stockpiles and even slag piles

    Jun 28, 2016

  • AUSIMM
    Thermal Coal Industry – Is Longwall Mining Currently a Life-of-mine Option in Australia?

    By T W. C Stambolie

    Longwall mining is a form of underground mining and the principal extraction method for underground coal mining in Australia. The method is used in the mining of both thermal and metallurgical coal. T

    Jun 28, 2016

  • AUSIMM
    Global Lessons for a Local Problem – Rehabilitation Bonds and Victoria’s Latrobe Valley Coalmines

    By M L. Cramer, N P. Wines

    "On 9 February 2014, bushfire embers landing on exposed coal in a disused pit at the Hazelwood mine in Victoria’s Latrobe Valley ignited a coal fire that burned for 45 days. The fire was the largest a

    Jun 28, 2016

  • AUSIMM
    Zooming Out – Learning to See Rehabilitation through Stakeholders’ Eyes

    By J L. Merritt

    The mining industry seeks to engage with and respond to stakeholders through open consultation processes during the various phases of a mining project (Department of Industry, Tourism and Resources, 2

    Jun 28, 2016

  • AUSIMM
    Development, Simulation, Economic and Environmental Evaluation of a Coal Processing Flow Sheet

    By J Tien, J Huang, N Haque, M O’Brien

    Coal preparation is an integral part of producing coal for thermal powerplants and metallurgical processing plants. Coal processing plants use various unit processes to separate gangue and ash content

    Jun 28, 2016

  • AUSIMM
    Landscape-scale Assessment of Watercourses in Remote Arid South Australia to Inform Mine Planning to Mine Closure

    By K White, C Ferguson, M Harding

    Understanding watercourses and river processes at a landscape scale is vital for managing risk to mining infrastructure and operations as well as minimising future environmental impacts beyond the lif

    Jun 28, 2016

  • AUSIMM
    Accounting for Vegetation Dynamics in Landform Evolution Modelling

    By G R. Hancock, S Grant, T Whiteside, J B. C Lowry, J Boyden, T J. Coulthard

    Physically-based landform evolution models (LEM) provide a spatial framework to forecast the long-term geomorphic stability of post-mining landscapes. When used to test the relative stability of diffe

    Jun 28, 2016

  • AUSIMM
    Simulating Integrated Hydrology in Mining Catchments from Planning to Closure

    By S Szylkarski, D N. Graham

    In mining, water management is an operational necessity, requiring planning and detailed engineering, as well as risk assessment. Yet, the hydrology of streams and aquifers typically extends well beyo

    Jun 28, 2016

  • AUSIMM
    A Simulation Approach for Improving the Assessment of Closure Risks

    By D Trembath

    "One of the key risks to the success of a mining operation is the accuracy of the estimates of both the economic mineral and any accompanying contaminants contained within the ore reserve. Misrepresen

    Jun 28, 2016

  • AUSIMM
    Derivation of High Reliability Water Quality Guideline Values for Cobalt in Freshwaters – Improving Water Quality Guidelines for Better Water Quality Compliance Management in Mining

    By F Butler, G E. Batley, A C. Hogan, A R. Butler

    The ANZECC/ARMCANZ (2000) Water Quality Guidelines (the Guidelines) are the primary reference used in Australia and New Zealand for managing and regulating water quality. For most mining operations in

    Jun 28, 2016

  • AUSIMM
    Predicting, Assessing and Managing Sediment Plumes Generated by Sea Floor Mining

    By R Grogan

    Nautilus Minerals (Nautilus) is a sea floor resource exploration and development company focused on developing the Solwara 1 Project, a copper-gold sea floor massive sulfide deposit in the territorial

    Jun 28, 2016