Search Documents

  • AIME
    A Case History Of Rockbursts At Elliot Lake

    By D. G. F. Hedley, S. N. Muppalaneni, J. W. Roxburgh

    A stope and pillar method is used to mine the gently-dipping uranium bearing reefs, to a depth of 1000 m, at Elliot Lake, Ontario. A few isolated rockbursts have been reported in the 11 mines in the a

    Jan 1, 1984

  • AUSIMM
    A Case History of the Crusher Level Development at Henderson

    By W D. Rech, K W. Keskimaki

    As an integral part of the conversion from rail haulage to conveyor haulage at Henderson, over six kilometres of drifting and several large complex openings were mined. The deepest of these areas was

    Jan 1, 2000

  • SME-ICGCM
    A Case History of the Effect of Mine Subsidence on a Concrete Arch Bridge in Northern West Virginia

    By R. B. Alke

    Request to Mine Beneath Bridge The Jabs Run Bridge is a reinforced portland concrete arch filled bridge located on WV Bouts 7 near Pentress, WV. The bridge has a span of 22.9 m (meters) and a height o

    Jan 1, 1984

  • DFI
    A Case History On Design, Construction, And Performance Of Stone Column Ground Improvement Beneath An Mse Embankment

    By Karen Dawson

    This paper presents a case study of the deformation-based design, construction, and performance of stone column ground improvement (GI) beneath a mechanically stabilized earth (MSE) wall and bridge ab

  • DFI
    A Case History on Design, Construction, and Performance of Stone Column Ground Improvement beneath an MSE Embankment

    By Dominic Parmantier, Karen Dawson, Suthan Pooranampillai, Seungcheol Shin

    "This paper presents a case study of the deformation-based design, construction, and performance of stone column ground improvement (GI) beneath a mechanically stabilized earth (MSE) wall and bridge a

    Jan 1, 2017

  • DFI
    A Case History On The Design, Construction, And Field Quality Control Of Cement Deep Soil Mixing

    By Suthan Pooranampillai

    This paper presents a case study of the use of single axis cement deep soil mixing (CDSM) to deal with static settlement and seismic stability of the foundation soils under a reinforced soil slope (RS

  • DFI
    A Case History on the Design, Construction, and Field Quality Control of Cement Deep Soil Mixing

    By Dominic Parmantier, Karen Dawson, Suthan Pooranampillai, Seungcheol Shin

    "This paper presents a case study of the use of single axis cement deep soil mixing (CDSM) to deal with static settlement and seismic stability of the foundation soils under a reinforced soil slope (R

    Jan 1, 2017

  • DFI
    A Case History Studying On Displacement Controlling In Deep Excavation

    By Feng Yongxuan

    Anchored sheep pile is normally used in deep excavations, many of which only require stability in accordance with Terzaghi theory. In this paper, based on the experience, new lateral earth pressure me

    Jan 1, 1991

  • DFI
    A Case History – Termination of Pile in Rock Based on Penetration Resistance for a Bridge across River Mandovi in Goa

    By Akshay Sakhuja, M. S. Karthika, R. Vignesh

    "The bridge across River Mandovi in Goa is a cable stay bridge structure proposed parallel, along existing bridges for regulation and reduction of vehicular traffic; the entire bridge structure is sup

    Jan 1, 2015

  • SME
    A Case History: Convergence in a Shear Zone at Devil’s Slide

    By Jeramy B. Decker, Paul H. Madsen

    "During the excavation of the north bound tunnel of the Devil’s Slide Tunnel project, deformation (convergence) was measured after passing through Fault Zone B. The tunnel convergence was not symmetri

    Jan 1, 2016

  • AUSIMM
    A Case of Discrepancy Between Bore Values and Recoveries

    The care necessary to ensure a reliable estimate of average value from the individual values of a series of bore holes sunk in any alluvial deposit containing coarse gold was well exemplified in check

    Jan 1, 1929

  • DFI
    A Case Study - Drilled Pier Foundations for a New Atlanta Stadium

    By Jean Wehbe, Daniel C. Brahana

    "This paper presents a case history of drilled pier construction for a new stadium in Atlanta, Georgia. The stadium structure is supported on several different foundation types, with the heaviest ""me

    Jan 1, 2017

  • SAIMM
    A Case Study Application Of Linear Programming And Simulation To Mine Planning - Synopsis

    By J. A. de Carvalho Junior

    This paper analyses the impact of the uncertainty associated with the input parameters in a mine planning optimization model. A real example was considered to aid in the building of a mathematical mod

    Jan 1, 2012

  • SAIMM
    A Case Study Application Of Linear Programming And Simulation To Mine Planning ? Synopsis

    By J. A. de Carvalho Junior

    This paper analyses the impact of the uncertainty associated with the input parameters in a mine planning optimization model. A real example was considered to aid in the building of a mathematical mod

    Jan 1, 2012

  • ISEE
    A Case Study Applying the Multiple Blasthole Fragmentation Model (MBF) at an Open Pit Mine

    By C. McAllister, D. Preece, J. Berendzen

    The Multiple Blasthole Fragmentation (MBF) model was developed recently and has been reported in previous papers. The MBF model accepts inputs from the blast design, such as: location and orientation

    Jan 1, 2016

  • DFI
    A Case Study Describing The Use Of A Top Down Construction Sequence For A Three Level Basement Using A Diaphragm Wall And Cfa Foundation Piles

    By Chris Leach, Lucie Spencer

    This case study describes the geotechnical aspects of the basement construction for a multi-storey, residential and hotel complex located in the newly developed Elizabeth Quay precinct in Perth, Weste

    Nov 1, 2022

  • SME
    A Case Study Establishing Optimization Techniques and the Procedure for Successful Numerical Simulation of Ground-Structure Interaction - NAT2022

    By Ali Keneti, Xavier Ryan, Gerardo Sanchez, Shannon Goff

    In this study, FLAC3D modeling was conducted for ground-structure stability assessment for a pilot tunnel passing under a large shaft excavated in the vicinity of existing structures at Karangahape St

    Dec 1, 2022

  • ISEE
    A Case Study Examination of Two Blast Rounds at a Nevada Gold Mine

    By Joel Warneke, Cristian Caceres, Ed Mchugh

    NIOSH researchers collected basic data from two blast rounds at the SSX-Steer Mine as a component of a larger study on controlled blasting, the goal of which is to reduce injuries from falling rocks i

    Jan 1, 2008

  • NIOSH
    A Case Study Examination of Two Blast Rounds at a Nevada Gold Mine

    By Ed Mchugh

    NIOSH researchers collected basic data from two blast rounds at the SSX-Steer Mine as a component of a larger study on controlled blasting, the goal of which is to reduce injuries from falling rocks i

    Jan 1, 2007

  • SME
    A Case Study Exploring Field Level Risk Assessments as a Leading Safety Indicator

    By R. Heiser, J. Vendetti, B. P. Connor, E. J. Haas

    "DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the views of the National Institute for Occupational Safety and Health. Reference to sp

    Jan 1, 2017