Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
RI 7659 Lowering The Tin Content Of Secondary Leaded Tin-Bronze By Replacement With Lead Or ZincBy E. R. Cole
Laboratory heats of an 80 percent copper high-leaded tin-bronze alloy, similar to Brass and Bronze Ingot Institute (BBII) alloy 3A, were made with reduced tin content to determine whether an alloy com
Jan 1, 1972
-
RI 7350 Dismantling A Typical Junk Automobile To Produce Quality ScrapBy Karl C. Dean
All components of 15 automobiles manufactured between 1954 and 1965 were analyzed, and it was determined that a representative junk automobile would have the following composition (all figures in poun
Jan 1, 1969
-
OFR-43-84 Noise Control Of Rubber-Tired Front-End Loaders Used In Surface MiningBy N. R. Dixon
This report summarizes all work performed under U.S. Bureau of Mines Contract No. J0395028, "Noise Control of Rubber-Tired Front-End Loaders Used in Surface Mining. " Two loaders, a Caterpillar 988 an
Jan 1, 1983
-
Behaviour of large-span rock tunnels and caverns under favourable horizontal stress conditionsBy X. H. Zhang, J. G. Cai
This paper discusses the behaviour of large-span tunnels and caverns in hard rock in a major underground storage project. In-situ stresses were measured using hydraulic fracturing during site investig
Jan 1, 2003
-
Iron and Steel Division - Rate and Mechanism of the Sulfur Transfer ReactionBy S. Ramachandran, N. J. Grant, T. B. King
MANY investigations of the rate of the sulfur transfer reaction between carbon-saturated iron and blast furnace type slags have been made." It is evident that the reaction is complex, the rate being a
Jan 1, 1957
-
Prediction of mine tailings delta profilesBy P. H. Morris
The profile of a delta formed by fine-grained mineral processing wastes, disposed of as aqueous slurries by subaerial deposition from a pipeline, has a significant bearing on the volume that is availa
Apr 1, 1996
-
Permeability of Coal in Relation to Gas Outburst and DrainageBy J D. St George
In this paper a laboratory investigation into the effect of confining stress, water content and gas desorption on coal permeability is presented. Of major significance is the effect of coal permeabili
Jan 1, 1998
-
IC 9136 Survey Of Nuisance And Biologically Active Dusts In Metal And Nonmetal MinesBy P. J. Watson
The objective of this study was to prioritize the potential risks nuisance and biologically active dusts and fumes present in metal and nonmetal mines. This was accomplished by ranking numerical value
Jan 1, 1987
-
Kinetics of the Gaseous Reduction of HematiteThe widely accepted kinetic model for the gaseous reduction of hematite is critically examined. The formation of the wustite layer during internal reduction cannot be explained in terms of solid-state
Jan 1, 1964
-
Uplift Capacity Of Drilled Piers In Clay - SynopsisBy Braja M. Das
Laboratory model test results for the ultimate uplift capacity of square and circular foundations in saturated clay (ø=0) have been presented. The results of the present model tests for square foundat
Jan 1, 1987
-
Washability Characteristics of the Liddell SeamCONTENTSSummary.Introduction.Location and Geology.Historical and Exploitation.Part 1. Washability Characteristics of the Liddell.Seam.Foybrook Open Cut, Top Bench.Sampling.Size and Ash Distribution.Wa
Jan 1, 1954
-
Proceedings, 109th Annual General Meeting, 2006The 109th Annual General Meeting of The South African Institute of Mining and Metallurgy was held at The Country Club, Johannesburg, Napier Road, Auckland Park on Wednesday, 16 August 2006. Special
Jan 1, 2006
-
O Street Anchored Precast Lagging And Soldier Pile Retaining WallBy John Wise
Significant movement to an existing slurry wall which serves as a retaining wall on 'O' Street in Southeast Washington, D.C. initiated the Department of Public Works for the District of Colu
Jan 1, 2003
-
IC 7783 Methods And Costs Of Deepening The Crescent Shaft, Bunker Hill & Sullivan Mining And Concentrating Company, Kellogg, Shoshone County, Idaho ? Summary And IntroductionBy E. B. Olds
This paper describes the methods and costs of deepening the 3-compartment underground shaft in the Hooper Tunnel adit at the Bunker Hill & Sullivan Mining and Concentrating Company Crescent mine in th
Jan 1, 1957
-
Prediction of drill-bit performance using multi-variable linear regression analysisBy A. Ersoy, M. D. Waller
The principal factors which require consideration in predicting drilling rates are the bit-type, the bit operating parameters and the characteristics of the penetrated rock. A single index is not a su
Aug 1, 1995
-
Recent Developments In Dense Medium Cyclone Circuit Design – PreprintBy L. Watters, R. Terry, D. Placha
Dense medium cyclones are the preferred means for cleaning 1/2 in. x 14Mesh to 28Mesh (12.7 mm x 1.0 mm to 0.6 mm) raw coal and are becoming a common choice for cleaning raw coal from a nominal top si
Feb 24, 1997
-
Balancing Profits In Paradise By Exploiting A Zinc-Lead Mine At Highest Elevation On The Earth Through Innovative Concept & Energy Efficient Process Aimed At Sustainable Development Of The Mountainous Areas Of Rasuwa And Dhading Districts, NepalBy M. L. Baharani
Looking for an idyllic paradise that has investment and business potential as spectacular as the stunning views of mountains, the rich Ganesh Himal zinc-lead deposit exposed between 4,050 m and 5,000
Jan 1, 2008
-
RI 4498 Pilot-Plant Production Of Steel From Sponge IronBy W. W. Stephens
As part of the Bureau of Mines program directed toward more effective utilization of the mineral resources of the United States, a number of processes for production of sponge iron have been investiga
Jan 1, 1949
-
Reducing Longwall Noise With Acoustical Material On The Shields - 4 Preliminary Analysis – Preprint 97-108By A. D. Prokop, J. P. Rider
Along with increased production from longwall units has come the likelihood of increased worker noise exposures. In recent years, equipment has become larger, more powerful, and noisier than its prede
Feb 24, 1997
-
RI 9256 - Characterization of the Sheep Creek Pb-Zn-Ag-Sn Prospect, North-Central Alaska RangeBy W. K. Connor, O&apos
The U.S. Bureau of Mines investigated the Sheep Creek prospect in the north-central Alaska Range to evaluate the Pb, Zn, Ag, and Sn resources. The studies included field investigations, mineralogical
Jan 1, 1989