Search Documents

  • SME
    Grouting For Groundwater Control Milwaukee Inline Project

    By Edwin F. Shorey, Richard F. Coon, Steven B. Fradkin

    Crosstown Interceptor Phase IA is the first deep tunnel element of the Milwaukee Inline Project. The tunnel contract includes 6,492 meters (m) of 9.1-m-diameter tunnel, two access shafts, and partial

    Jan 1, 1987

  • SAIMM
    Using MIP for strategic life-of-mine planning of the lead/zinc stream at Mount Isa Mines

    By M. L. Smith, G. Karunatillake

    Lead-zinc production at MIM, Mount Isa includes three mines, a lead concentrator, zinc filter plant and lead refinery. Lead production is vertically integrated with lead-silver bullion shipped from Au

    Jan 1, 2003

  • SME
    Multi-objective Mathematical Programming Framework for Integrated Oil Sands Mine Planning and Tailings Disposal Optimization - Mining, Metallurgy & Exploration (2021)

    By Hooman Askari-Nasab, AHLAM MAREMI, EUGENE BEN-AWUAH

    In oil sands mining, tailings are voluminous unwanted by-products generated from extracting the desired mineral from the mined ore. Dyke construction and backfilling activities require well-managed te

    Apr 14, 2021

  • SAIMM
    Application of magnetic separation technology for the processing of a colemanite ore - Synopsis

    By I. Alp

    Application of magnetic separation was investigated for the enrichment of colemanite ores by removing the magnetic gangue fraction. The detailed XRD analysis of the ore has indicated that the gangue f

    Jan 1, 2009

  • SAIMM
    Planning For Value In The Mining Value Chain - Mine Planning To Deliver Value - A Complex Problem

    By A. Vorster

    The objective with mine planning is to consistently deliver production conforming to quality and quantity requirements throughout the life of the mine. The complexity of the operational context of the

    Jan 1, 2001

  • CIM
    Fast Track Reactivation -Jacobina Mine

    Mine Evaluation Engineering , Operational and Social evaluation. Focus is on what opportunities are available. Social ??History ??Past Management Practices ??Community / Available labor force Mi

    May 1, 2006

  • NIOSH
    RI 8500 Preparation of Platinum-Palladium Flotation Concentrate From Stillwater Complex Ore

    By J. Bennetts

    As part of its mission to develop technology that will help increase the supply of critical and strategic minerals from domestic resources, the Bureau of Mines has investigated methods for beneficiati

    Jan 1, 1980

  • DFI
    120 Years of Caisson Foundations in Chicago

    By Robert E. Schock, Eric J. Risberg

    "Less than 20,000 years ago, the last of the glaciers retreated from the Chicago region. They left behind sheets of glacial clay till underlain by dense, over-consolidated till (“hardpan”) below which

    Jan 1, 2016

  • SAIMM
    Optimization of geological lead-time in a feasibility study drill out—Two Rivers Platinum, Mpumalanga, South Africa

    By Hornsey R., P. van der Merwe

    The Two Rivers Project is a feasibility study to evaluate the UG2 chromitite layer on Dwarsrivier372KT, Mpumalanga Province, South Africa. The project, which commenced in August 2001, is expected to r

    Jan 1, 2003

  • NIOSH
    RI 7204 Composition And Characteristics Of Municipal Incinerator Residues

    By C. B. Kenahan

    The Bureau of Mines is developing methods for reclaiming the metal and mineral values contained in municipal incinerator residues. This report describes the first phase of the research, in which relia

    Jan 1, 1968

  • NIOSH
    OFR-57-75 A Computer-Controlled Electrical Resistance Network Analog For Rational Mine Design ? Summary

    By S. L. Crouch

    An important class of mining problems involves excavations in planar seam or vein-type deposits. In many instances it can be assumed that the seam is at 'infinite' depth in a homogeneous, is

    Jan 1, 1974

  • NIOSH
    OFR-63-77 Feasibility Study Of A Differential Current Ground Fault Or Leakage Current Sensor For Direct Current Offtrack Machines - 1.0 Introduction

    By Robert R. Perron

    The U.S. Bureau of Mines is engaged in many diverse programs fur improving mine safety. One area of interest to the Bureau is new and improved means for minimizing the hazards of accidental gas igniti

    Jan 1, 1976

  • NIOSH
    RI 3023 Increased Recoveries- Phosphate in Land Pebble of Forida

    By H. M. Lawrence

    "The land-pebble district, the larger of the two producing areas of Florida, is situated in Polk County and in the eastern part of Hillsborough County. About 80 per cent at the phosphate rock produced

    Jul 1, 1930

  • AUSIMM
    Forecasting for Mining and the Environment

    Forecasting, particularly when applied to meaningful issues, is known irreverently as 'futurology'. There is quite a range of opinion ext.ant in the world when mineral resources are looked a

    Jan 1, 1981

  • SME
    Cliffs And Associates Limited Circored® Iron Plant

    By E. C. Dowling, S. A. Elmquist, L. A. Kipfstuhl

    The Cliffs and Associates Limited (CAL) 500,000 tpy HBI plant located in Trinidad was commissioned after modifications in early 2001. This plant employs the novel Lurgi Circored® process to reduce iro

    Jan 1, 2002

  • DFI
    Settlement & Vibration Monitoring For Transmission Line Foundation Installation: A Case History

    By R. Heath Forbes

    The route of a new, 4-mile long, electrical transmission line passed through residential neighborhoods and commercial areas of a small town in the South Carolina Coastal Plain. The new line consisted

    Jan 1, 2011

  • NIOSH
    OFR-13-70 Advisory Conference On Tunnelling - Introduction

    By Thomas E. Howard

    Man has been engaged in the construction of tunnels in. rock for several thousand years. During that time, methods of tunneling have changed drastically. Hordes of men chipping away at the tunnel face

    Jan 1, 1970

  • NIOSH
    RI 3500 Progress Reports - Metallurgical Division - 38. Electrometallurgical Investigations - An Electrolytic Method For The Production Of Calcium Boride ? Introduction

    By J. Koster

    Boron is an element whose metallurgical possibilities never have been investigated thoroughly, probably because of the difficulties experienced in the preparation of elemental boron and its intermetal

    Jan 1, 1940

  • SME-ICGCM
    Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)

    By Larry DeGraff

    With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr

    Jan 1, 2009

  • SME-ICGCM
    Stability of Slopes in Discontinuously Jointed Rock (4d3fd7d1-f3a8-44f5-b86c-03d96a9b1123)

    By T. M. Tharp

    Attempts to analyze the stability of slopes, foundations and underground openings in discontinuously jointed rock have generally assumed full joint continuity or ignored the role of stress concentrati

    Jan 1, 1984