Search Documents

  • SME
    Monitoring Of Natural Heat Occurrence At The Bear Canyon Coal Mine

    By Miles T. Stephens, Felipe Calizaya, Jacob O. Kingston

    Currently, the Bear Canyon Mine is facing the challenge of excessively high coal and rock temperatures in one of its headings. In Mine No.3, the air temperature at the 6th Right panel reached 36.4ºC a

    Jan 1, 2005

  • DFI
    Analysis Of Driving Stress Measured In The RC Long Pile

    By Yu Zhenquan

    At the construction site of Bao Shan Iron &. Steel Mill in Shanghai, lots of RC driven piles with length of 50 to 60m were applied. The most unfavourable distribution of stress along the pile shaft wa

    Jan 1, 1991

  • NIOSH
    IC 8167 Bureau Of Mines Research And Technologic Work On Coal, 1961 ? Introduction

    This report is the 26th in a series summarizing Bureau of Mines research and technologic work on coal and related investigations and the 8th of these reports to be issued on a calendar-year basis.1 It

    Jan 1, 1963

  • SAIMM
    A Symphony Of Collaboration Between Mining And Engineering

    By M. Andrews, B. J. Göhre, G. Strong, C. Terblanche

    Mechanized mining can be experienced as a symphony by substituting the instruments for the different machines that each perform their own function and thus have different sounds. The drill-rig is the

    Jan 1, 2006

  • SME
    Selected Factors Affecting Longwall Mine Layouts In The Pittsburgh Coalbed Of Southwestern Pennsylvania

    By A. Iannacchione

    Longwall mining began within the Pittsburgh coalbed of Pennsylvania (PA) in the early 1970?s. Originally, longwall mine layouts were designed to fit within existing room-and-pillar operations, where

    Feb 27, 2013

  • DFI
    The Impact Of Vibro Compaction Adjacent To Large Vertical Maritime Retaining Structures

    By Barry C. Slocombe

    The development of new ports, extensions of existing facilities and reclamation of former docks will involve consideration of a variety of geotechnical problems. This paper presents data including in

    Jan 1, 2008

  • CIM
    Simultaneous Optimization of Ultimate Pit and Production Scheduling Using a Heuristic Approach

    By A. K. Mahto, B. Samanta

    "A heuristic model was developed to simultaneously generate the ultimate pit and production scheduling at a mining project. The method consists of a preprocessing step to select a starter pit, the imp

    Jan 1, 2017

  • NIOSH
    RI 9314 - Pressure Leaching of Galena Concentrates To Recover Lead Metal and Elemental Sulfur

    By Agnes Y. Lee

    As part of the U.S. Bureau of Mines program to improve base metal leach systems, pressure leaching of galena (PbS) concentrates in fluosilicic acid (H2SiF6) solution was investigated. Lead extraction

    Jan 1, 1990

  • SAIMM
    Slag Properties And Design Issues Pertinent To Matte Smelting Electric Furnaces (e3a20593-dc35-4fd2-9a1d-dff5bd2ffd2f)

    The effect of composition on electrical conductivity (resistivity), viscosity and liquidus temperature of the slags encountered in electric smelting of PGM-containing suphide concentrates is reviewed

    Jan 1, 2004

  • AIME
    Virginia Beach Paper - The Stetefeldt Furnace

    By C. A. Stetefeldt

    Jan 1, 1895

  • NIOSH
    RI 9202 - Control of Airborne Respirable Dust in the Face Area With Water Sprays Using a Full-Scale Laboratory Model

    By L. Cheng

    This report presents the results of a Bureau of Mines laboratory investigation of the effect of water sprays in reducing respirable dust that escaped the face area of a full-scale wooden model of a mi

    Jan 1, 1988

  • AUSIMM
    Tensile strength and shear strength properties of the adhering layer of granules in iron ore sintering

    By H Zhou, T Honeyands, M Zhou

    In iron ore sintering, packing the granules onto the sintering strand to form a porous bed with optimum permeability is a complex dynamic process. The packed bed voidage is the key factor determining

    Jul 24, 2017

  • SME
    Planning And Preparation For Tunneling At Brightwater West

    By Mina M. Shinouda

    Brightwater West (BT4) represents the state of the art in utility tunneling, namely a long relatively small diameter, soft ground tunnel, with no intermediate shafts, under significant groundwater pre

  • AUSIMM
    Highlighting key features of the pore structure of iron ore sinter using mercury intrusion porosimetry and X-ray computed tomography

    By D O’Dea, B Godel, T Honeyands, G Evans, T Harvey

    The pores within iron ore sinter are important for producing a high quality material that is strong and easily reduced. The complementary methods of mercury intrusion porosimetry (MIP) and X-ray compu

    Jul 24, 2017

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Program Development - Background - Collapse

    By Darrell L. Beddard

    The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western

    Jan 1, 1996

  • AUSIMM
    Application of X-ray Diffraction to Iron Ores - Potential Implications for Grade Control and Downstream Processing

    The steps for the beneficiation of iron ores differ from ore to ore, depending on the mineralogical phases of the particular iron ore and the nature of the association of the gangue minerals with iron

    Aug 12, 2013

  • SME
    Placement Of Concrete Lining For Water Tunnel No. 3, Manhattan Portion

    By Robert Labbe

    The final tunnel lining for this project involved pumping vast quantities of concrete over large distances under the extremely busy streets of lower Manhattan. Approximately 68,000 cubic meters (89,00

  • SAIMM
    CFD modelling of methane movement in mines

    By D. Whittles, C. J. Lea, T. X. Ren, A. Kelsey

    A methodology for the simulation of methane drainage combining geotechnical modelling and computational fluid dynamics (CFD) will be described. Geotechnical modelling was used to predict the developm

    Jan 1, 2003

  • AUSIMM
    Technical Note on Recovery of Manganese from Low Manganese Content Ferromanganese Slag

    By Rao P. K, Sahoo P. K

    The main constituents of ferromanganese slags are silicates of Mn, Ca and AI. Factors affecting the recovery of manganese from a low manganese content ferromanganese slag (about 16 per cent MnO) durin

    Jan 1, 1979

  • SME
    Toward a Mine-Wide, Real-Time, and Autonomous Geotechnical Change Detection, Monitoring, and Prediction Framework for Underground Mines

    Adverse ground behavior events, such as convergence and falls of ground, are some of the most significant challenges and hazards in underground mines. Our goal is to work toward mine-wide, digital, an

    Jul 28, 2020