Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
RI 3453 Relative Air Dustiness During Cycle Of Operations At Mount Weather Testing Adit ? IntroductionBy John A. Johnson
For the purpose of comparing the amounts of dust produced by various mining operations, samples of atmospheric dust were collected during a complete cycle of drilling, blasting and mucking at or near
Jan 1, 1939
-
Part 2: Experimental calibration of sampling parameters K and alpha for Gy?s formula by the sampling tree method ? SynopsisApplication of Gy?s formula is appropriate for calculation of the Fundamental Error (FE) prior to samples being collected at any stage of the minerals process, provided that sampling parameters K and
Jan 1, 2007
-
OFR-50-84 Stress Analysis Of Wire Hoist RopeBy George A. Costello
A theoretical analysis is presented for the static and dynamic response of wire rope in deep-shaft mining operations. Expressions for the stresses in the individual wires of complex wire ropes are der
Jan 1, 1983
-
Mechanical properties and fatigue resistance of rails welded with the aluminothermic methodBy J. P. Sancho, J. M. Duart, J. I. Verdeja, J. O. García
Following a short review of the history of rails used in the transport of passengers and goods, this paper describes the process for rail fabrication, rail structure, and properties, and summarizes th
Jan 1, 2007
-
A Generic Study of the Capital and Operating Costs for the Recovery of Precious Metals from Refractory Ore"This generic study has been developed in response to the frequently asked question, ""That is the best treatment route for refractory gold ore?"". The study has developed operating and capital costs
Jan 1, 1989
-
OFR-82(2)-75 Probe Drill Guidance System - Volume 2 - Appendix A - Computer ProgramBy Llewellyn A. Rubin
ROUTINES AND SUBROUTINES A- 1 Wait Loop (Wait) A- 2 Receiver Processing (RCVP) A- 3 Control Panel Sequence (CPNL) A-4 Interrupt Routine (INTRP) A- 5 Math Processing Routine (PROC) A-6 Input
Jan 1, 1973
-
Parascrew Self Unloading Barge SystemBy Harry E. Holzschuh
The two Agrico Chemical Company self unloading Phosphate Rock barges put into service in 1976 operate at over their design carrying capacity. Each barge now carries 26,000 short ton instead of the pla
Jan 1, 1983
-
Effects of Solidification Rate and Alloy Composition on the Cast Microstructure of Aluminum Alloy 5182By P. N. Anyalebechi
The effects of solidification rate (0.4-26.1 K/s) and alloying elements on the cast microstructures of aluminum alloy 5182 have been investigated with directionally cooled laboratory-size ingots. The
Jan 1, 2010
-
A History of Improvements at the Kemess ConcentratorBy Paul Grady, Martin Froehling, Curtis Mohns, Eliab Roman
"Since the idea of processing rock to unlock the valuable minerals inside was put into practice, efforts to improve production began. Methods have been learned that allow for operation in environments
Jan 1, 2005
-
RI 3306 Progress Reports - Metallurgical Division - 12. Annual Report Of The Metallurgical Division, Fiscal Year 1935 ? Introduction (1ff6aa2b-f070-4d81-aa24-fe846df542bc)By R. S. Dean
The function of the Metallurgical Division is to conduct investigations relating to the treatment of mineral products from the state in which they are mined to the refined metal or other unfabricated
Jan 1, 1936
-
RI 3306 Progress Reports - Metallurgical Division - 12. Annual Report Of The Metallurgical Division, Fiscal Year 1935 ? IntroductionBy R. S. Dean
The function of the Metallurgical Division is to conduct investigations relating to the treatment of mineral products from the state in which they are mined to the refined metal or other unfabricated
Jan 1, 1936
-
A critical evaluation of processes to produce primary titanium - SynopsisBy D. S. van Vuuren
Over the last 60 years many different processes were conceived to reduce the cost of titanium produced by the Kroll process. However, success eluded all previous efforts, which were consequently termi
Jan 1, 2009
-
Antimony Milling at Consolidated Durham Mines and Resources LimitedBy B. St. Pierre
"The alchemists' symbol for antimony is a diamond with a dot in the centre. The latin name ''stibium'' gives this mineral its chemical symbol ""Sb"" and the name to the principal ore containing antimo
Jan 1, 1977
-
Determining Ore Breakage Characteristics using the Steel Wheel Abrasion TestBy Tapiwa Chenje, Victor Olivas, Peter Radziszewski
"Ore breakage and grinding media wear have always been considered and determined separately in laboratory tests. However the two processes are linked with the ore broken down in any comminution device
Jan 1, 2011
-
IC 8038 Developments In Waterflooding And Pressure Maintenance In Osage County, Okla. Oilfields, 1961 ? Introduction And SummaryBy Kenneth H. Johnston
Records show that waterflooding was tried in Osage County as early as 1934, but it was not economically important until a large unitized flood in the North Burbank field was begun in 1950. Development
Jan 1, 1961
-
Creation Of An Underground Mine Development Sequencing OptimizerBy M. J. Blattman
Upon completion of an underground mine design, the planning engineer is faced with a surprisingly complex problem, “What development and mining sequence should be implemented so as to maximize the ret
Jan 1, 2003
-
Unsteady State Heat Transfer Analysis Of Lower Parts Of Blast Furnace With Liquid FlowBy Tsunehisa Nishimura
Stable operation of the blast furnace needs adequate control of the lower part. To clarify the behavior of the lower part of the blast furnace with accurate consideration of the property of slag and i
Jan 1, 2006
-
Augered Cast-In-Place Concrete Piles In Flood Plains - 1.0 IntroductionBy Javaid M. Alvi
This paper is an attempt to outline the emergence of Augered Cast-ln-Place piles as one of the more economical types of foundation for supporting high-rise buildings and heavily loaded structures rece
Jan 1, 2001
-
RI 9335 - Production of Lead Metal by Molten-Salt Electrolysis With Energy-Efficient ElectrodesBy J. E. Murphy
The u.s. Bureau of Mines investigated electrode designs for electrowinning lead metal from a LiCl-KCl-PbCI2 electrolyte at 4500 C. The major objective of this investigation was to decrease the energy
Jan 1, 1991
-
Automatización de los sistemas de gestión en MilpoBy Juan Lucero
Como consecuencia de los factores externos e internos, las empresas mineras necesitan ser más eficaces a través de la implementación de nuevas tecnologías e informática. En este sentido, la compañía m
Sep 13, 2001