Search Documents

  • AUSIMM
    The use of mid-panel ventilation shafts to improve positional cooling efficiency in a Bowen Basin longwall mine – a case study

    By D Brouwer, P Wild, B Belle

    Due to the steep geo-thermal gradient in Bowen Basin area, as underground coalmines reach increased depths of extraction, the Bulk Air Cooling (BAC) requirements will increase as opposed to cooling th

    Aug 28, 2017

  • AIME
    Natural Gas Technology - Realistic K Values of C7+ Hydrocarbons for Calculating Oil Vaporization During Gas Cycling at High Pressures

    By A. B. Cook, C. J. Walker, G. B. Spencer

    Although water will displace oil from a petroleum reservoir to a greater extent than gas will, there are some reservoirs in which gas rather than water should be used for pressure maintenance. This is

    Jan 1, 1970

  • SAIMM
    Determining Settlement Rates and Surface Stability Using In Situ Density of Backfill as a Proxy for Displacement

    By D. Fenn, A. du Kanda, D. Dukhan

    "SynopsisGibb Consulting Services was contracted by Eskom Line Engineering Services to conduct an investigation to determine the absolute displacement to date and infer the current rate of displacemen

    Jan 1, 2015

  • SAIMM
    Iron slag dump material and leachate treatment

    By A. C. Moorgas, J. Divall

    This study investigates the feasibility of using waste iron slag, the by-product from a mineral sands processing works, in road construction. The study includes the different options investigated for

    Jan 1, 2003

  • NIOSH
    IC 8243 Iron And Steel Scrap In The Pacific Northwest

    By Gary A. Kingston

    This examination of Pacific Northwest (Idaho, Montana, Oregon, and Washington) ferrous scrap-industry operations, principally those in Oregon and Washington, points out factors influencing the supply

    Jan 1, 1964

  • DFI
    Session II - Industry Trends And Up And Coming Innovations - Reflections On Our Industry - Foundation Vs Geotechnical

    By Arturo Ressi di Cervia

    From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in

    Jan 1, 2000

  • CIM
    Using Laboratory Scale Flotation Testing to Predict Pilot Scale Flotation Performance

    By E. Amini

    "While methods exist to allow the simulation and optimization of existing flotation operations, there is a deficit in the ability to predict the performance of a new ore type pre-processing. A laborat

    Jan 1, 2009

  • SAIMM
    Community Management Of Mineral Resources: The Case Of The Royal Bafokeng Nation - Synopsis

    By S. E. Cook

    This article uses the case of the Royal Bafokeng Nation to argue that royalties and dividends from mineral resources, if managed well, can provide direct benefits to the surrounding community even whi

    Jan 1, 2013

  • NIOSH
    RI 7070 New England Beryllium Investigations

    By William R. Barton

    Sampling to determine development potential of beryllium deposits was conducted at 31 New England localities. A total of 54 additional areas where the geochemical environment appeared favorable were s

    Jan 1, 1968

  • NIOSH
    IC 8857 Mine Waste Disposal Technology - Proceedings: Bureau Of Mines Technology Transfer Workshop, Denver, Colo., July 16, 1981

    This Bureau of Mines publication consists of an overview of the mine waste management research currently being conducted by the Bureau. The following papers, given at a Technology Transfer Workshop, e

    Jan 1, 1981

  • AUSIMM
    The Role of Metallurgical and Engineering Information Systems in the Optimisation of Iron Ore Beneficiation Processes

    By T Nassis, H M. Nel, T du Toit

    Assmang Khumani Iron Ore Mine is exploiting the iron ore deposits that can be found in the Bruce-King-Mokaning farm areas in the Northern Cape, South Africa. The Bruce, King and Mokaning (Khumani) dep

    Aug 12, 2013

  • SME-ICGCM
    Evaluating Coal Pillar Mechanics Through Field Measurements (a8e6d7f0-5b83-40bc-b63c-ddaae2b3a526)

    By Anthony Iannacchione

    Designing coal pillars to provide resistance against overburden loads has long been an aim of rock mechanics engineers. The need for accurate pillar strength models has become more urgent as greater o

    Jan 1, 1992

  • SME
    OSHA Problems As Viewed By The Laborers' International Union Of North America

    By Joe M. Short

    More than eighty years ago, in what we generally consider a more leisurely age, workers and engineers began the construction of the longest railroad tunnel in the world. When completed, the Simplon Tu

    Jan 1, 1979

  • CIM
    Social indicators for mining in Ancash, Peru: combining community objectives, technical considerations and community relations insight to design a practical framework.

    By Carol J. Odell

    As a mining social practitioner, social indicators are within the purview of required competencies. A situation, where the ER manager requested assistance in quickly deriving a few social indicators f

    May 1, 2010

  • AUSIMM
    Exploration Implications from Variations in Whole-rock and Mineral Chemistry around the Volcanic-hosted Massive Sulfide Deposits of the Que-Hellyer Volcanics, Tasmania, Australia

    By S M Richardson, A W McNeill, J B. Gemmell

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Hellyer, Fossey, Que River and Mount Charter volcanic-hosted massive sulfide (VHMS) dep

    Mar 18, 2015

  • SME
    Tire maintenance requires an entire team effort

    By Roger Best

    In the mining industry, where some of the vehicles are larger than a one-story house, tire maintenance cannot be accomplished by the tire shop alone. It takes an army of people to maintain a fleet of

    Jan 2, 2010

  • IOM3
    Layered mine waste co-mingling for mitigation of acid rock drainage

    By J Hadijigeorgiou, R. W. Lawrence, R Pouling

    The layered co-mingling method involves the disposal of waste rock with the addition, at predefined construction stages, of layers of dewatered mine tailings. The resulting waste structure displays bu

    Apr 1, 1996

  • SAIMM
    A decision analysis guideline for underground bulk air heat exchanger design specifications

    By M. Hooman, W. M. Marx, R. C. W. Webber-Youngman

    This paper discusses a study that investigated different underground bulk air heat exchanger (>100 m3/s) design criteria. A literature review found that no single document exists covering all design c

    Jan 1, 2015

  • NIOSH
    RI 6937 A Mine Production-Scheduling Model And Critical Path Analysis Of Mine Development Work For Long-Range Mine Planning

    By Adrian J. Mathias

    This report presents the results of an investigation of a mine production-scheduling model and a critical path analysis for long-range mine planning. An example is given to illustrate how these techni

    Jan 1, 1967

  • DFI