Search Documents

  • SME-ICGCM
    Cable Support Systems For Longwall Gate Road Stability

    By Stephen C. Tadolini

    The U.S. Bureau of Mines, in cooperation with the Cyprus- Plateau Mining Company, has conducted research to provide an alternative to traditional secondary support systems in a two-entry, yield pillar

    Jan 1, 1995

  • SME
    Environmental Management At Homestake Mclaughlin Mine (PREPRINT 90-23)

    By R. E. Krauss

    The McLaughlin Mine is a world class epithermal gold deposit located in the coastal thrust fault of Northern California, U.S.A. Homestake adopted a proactive strategy in the permitting of the Mine. Ex

    Jan 1, 1990

  • CIM
    A New Potential Standard in Monitoring and Optimizing Deposit Control in Mining Process Waters

    By W. J. González

    "With the increasing demand for minerals, technologies to maximize mineral recovery are paramount to a mine’s economic success. Many mining process waters have the potential to form calcium-based inor

    Jan 1, 2014

  • AUSIMM
    Stemming of Blastholes in Mining Excavations

    By Lamont G

    The significance of blasthole stemming in determining blasting efficiency has been extensively studied for small diameter holes using gelignite explosives. Recent developments in blasting technology w

    Jan 1, 1979

  • AUSIMM
    Geochemical Prospecting of the Bureau of Mineral Resources

    Geochemical projects in progress or recently completed in the Bureau of Mineral Resources, Geology, and Geophysics (BMR) cover a wide range of topics and include research projects, regional studies, a

    Jan 1, 1970

  • SME-ICGCM
    Practical Aspects Of Mobile Roof Support Usage

    By F. E. Chase

    Mobile roof supports are shield-type support units mounted on crawler tracks. Mobile roof support (MRS) units are used during retreat mining, and they eliminate the setting of roadway, turn, and cross

    Jan 1, 1996

  • NIOSH
    IC 8652 Profitability Analysis Of Producing Crude Oil By Waterflooding Using A Simulation Technique

    By W. D. Dietzman

    This Bureau of Mines report presents a profitability analysis of producing crude oil by waterflooding. Included are the estimated costs of installation of water injection and producing equipment for w

    Jan 1, 1974

  • NIOSH
    RI 7295 Bureau Of Mines Coal-Fired Gas Turbine Research Project - Test Of Combustor And Ash Separators For Open-Cycle Plant

    By Donald C. Strimbeck

    The Bureau of Mines designed a down-fired refractory-lined combustor that efficiently burned pulverized coal to produce a gas suitable as working fluid for an open-cycle gas turbine. The gas contained

    Jan 1, 1969

  • NIOSH
    Comparison Of Ore Pass Computer Simulations For Designs Against Dynamic Load

    By K. Biswas, S. Iverson, S. J. Jung

    Computer modeling of rock flow in ore passes is being investigated and compared using MSC Soft-ware’s Working Model 2D1 (WM2D) and Itasca Corp.’s Particle Flow Code in Two Dimensions (PFC2D). This wo

  • TMS
    Classification and Rating of Inclusions in a High Carbon Steel

    By M. Faraji

    Inclusions formed in a high-carbon, manganese-silicon killed plain steel (Fe-0.77C wt%) were studied. Various techniques were used to characterise the inclusions, and the latter were classified accord

    Jan 1, 2010

  • TMS
    Metallurgical Considerations For Recycling Siliceous- Bearing Materials In The Mitsubishi Continuous Copper Converter

    By Fumito Tanaka

    The Mitsubishi Process is the sole pyrometallurgical process for the continuous production of blister copper from copper concentrates. Continuous converting originates from the application of the pro

    Jan 1, 2005

  • AUSIMM
    Smelting Practice at Mount Morgan

    By Hennessy F. L

    IntroductionEvolution of the Present SmelterRoastingFiringHearth SlopeDust HandlingFurnace DetailsSmeltingFurnaceFeed DeliveryPulverised Coal FiringWaste Heat BoilersDust HandlingAir PreheaterReverber

    Jan 1, 1952

  • SME
    Performance Comparison of Real-Time Light Scattering Dust Monitors Across Dust Types and Humidity Levels Mining, Metallurgy and Exploration

    By Donald P. Tuchman, Justin R. Patts, Emanuele G. Cauda, Andrew B. Cecala, Elaine N. Rubinstein

    Video techniques for monitoring exposure, such as NIOSH’s “Helmet-CAM,” employ both real-time dust monitors and mobile video cameras to assess workers’ respirable dust exposures. Many real-time person

  • SME
    Performance Comparison of Real-Time Light Scattering Dust Monitors Across Dust Types and Humidity Levels Mining, Metallurgy and Exploration (822ee1d1-598a-49fd-803c-4aba5d62e4bf)

    By Donald P. Tuchman, Justin R. Patts, Emanuele G. Cauda, Andrew B. Cecala, Elaine N. Rubinstein

    Video techniques for monitoring exposure, such as NIOSH’s “Helmet-CAM,” employ both real-time dust monitors and mobile video cameras to assess workers’ respirable dust exposures. Many real-time person

  • SME
    Gold Mineralization In The Coffee Creek Area; White Gold District (Dawson Range), West-Central Yukon ? Introduction

    By A. J. Wainwright

    The Coffee Creek lode gold discoveries are located in the White Gold district (Dawson Range), west-central Yukon, 130 km south of Dawson City and 30 km south of the Golden Saddle gold deposit (Figure

    Jan 1, 2012

  • AIME
    Waste Dump Stability at Fording Coal Limited in B.C.

    By Robert S. Nichols

    Fording Coal Limited's mine in the Rocky Mountains near Elkford, B.C. has produced 21.8 million clean tonnes of metallurgical coal from 1971 to 1980, inclusive. This production has come from seve

    Jan 1, 1983

  • NIOSH
    OFR-149-84 Development And Validation Of A Training Program For Operators Of Noncoal Equipment - Volume I. Final Report

    This report describes the development of training materials for the operators of underground mining equipment in the underground metal and nonmetal mining industry. The objective was to determine the

    Jan 1, 1984

  • CIM
    Geostatistical Determination of Production Uncertainty: Application to Pogo Gold Project

    By J. A. McLennan

    Geological uncertainty is an unavoidable characteristic of all mining projects since only limited information is available from sampling. Mine planning and development decisions with significant econo

    May 1, 2004

  • DFI
    A Theoretical Study Of Underpinning Of Rigid Circular Foundations By Piles ? Synopsis

    By M. Makarchian

    Existing buildings sometimes experience excessive settlement under their design loads, or due to increased foundation loading, if a change of building use is required. One of the oldest and widely num

    Jan 1, 1996

  • NIOSH
    IC 6815 Mining Operations At The Property Of The Britannia Mining & Smelting Co., Ltd., Britannia Beach, British Columbia ? Introduction

    By C. V. Brennan

    This paper, describing the various mining methods and practices at Britannia mines, Britannia Beach, British Columbia, is one of a series covering mining practices, methods, and costs in the mining di

    Jan 1, 1935