Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Geotechnical Planning Basis for the Optimization of Workings

    By Nikolaos Polysos

    Besides considering the given geomechanical conditions, the geological/geotechnical logging of drill cores and heading faces during the driving of parallel entries and the resulting rock classificatio

    Jan 1, 2003

  • SME-ICGCM
    High Capacity Tensioned Cable Bolts For Tailgate Support

    By Stephen C. Tadolini

    A joint research program was designed and conducted at Lodestar Energy?s Baker Mine to investigate the performance of a high-capacity tensioned cable supported gateroad. The secondary system consisted

    Jan 1, 2000

  • SME-ICGCM
    lnterpanel Barriers for Deep Western U.S. Longwall Mining

    By Leo Gilbride

    Western U.S. longwall operators face increasing challenges with optimizing ground control and productivity as mines reach greater depths and coal bursting hazards increase. Some western U.S. mines, ma

    Jan 1, 2004

  • SME-ICGCM
    Numerical Modeling of Standing Support Performance in Entries between Longwall Gobs

    By Benjamin Mirabile

    "Current and emerging practices to ventilate longwall gobs are prompting increased design and analysis of standing support requirements related to longwall mining. Specifically, additional design meth

    Jan 1, 2015

  • SME-ICGCM
    Investigation Into Abnormal Surface Subsidence Above a Longwall Panel in the Southern Coalfield, Australia

    By Winton J. Gale

    The subsidence over a longwall panel at Tahmoor Mine in the Southern Coalfield of NSW, Australia, was found to be approximately twice the size it had been in previous measurements. An investigation in

    Jan 1, 2011

  • SME-ICGCM
    Machine Design Parameters For High Seam Truss Bolting Applications

    By G. Bucelluni

    An essential element of truss bolt installation requires machines to angle a hole in the top of approximately 39° to 45° from its vertical axis. Parameter which inherently effect the drill position ar

    Jan 1, 1982

  • SME-ICGCM
    AMCMRR- An Analytical Model for Coal Mine Roof Reinforcement

    By Mark G. Colwell, Russell Frith

    "An Analytical Model for Coal Mine Roof Reinforcement (AMCMRR) has been developed. AMCMRR utilizes a Factor of Safety (FOS) approach, which is commonly used in all forms of engineering. The starting p

    Jan 1, 2010

  • SME-ICGCM
    Proposed Criteria for Assessing Subsidence Damage to Surface Structures

    By Swapan Bhattacharya

    Section 516 of Public Law (PL) 95-87, commonly known as the Surface Mining Control and Reclamation Act of 1977 (SMCRA), requires that underground coal mine operators must 'adopt measures consiste

    Jan 1, 1984

  • SME-ICGCM
    Stereological Sampling And Analysis For Characterizing Discontinuous Rock Masses

    By J. K. Owens

    As part of a larger research effort focused on ground control, the U.S. Bureau of Mines is currently evaluating the effectiveness of using stereological analysis for characterizing mine roof strata. I

    Jan 1, 1994

  • SME-ICGCM
    Analysis of Panel Stability for Post-Mining Slurry Injection

    By Tim Ross

    Slurry injection into mined-out panels is an attractive alternative for disposal of coal preparation plant fines. however, in areas where surface subsidence cannot be tolerated, either by law or neces

    Jan 1, 1998

  • SME-ICGCM
    Flexible Support Design For Gateroads Of Retreating Longwall Panels

    By Erdal Unal

    In gate roads where supports are subjected to dynamic loading four times due to retreating longwall panels, it is a real challenge to replace the rigid arches with flexible reinforcement systems and y

    Jan 1, 1993

  • SME-ICGCM
    Improved Design Of Coal Pillars For U.S. Mining Conditions

    By Z. T. Bieniawski

    This paper presents the results of a survey of room and pillar dimensions and design practice in U.S. coal mines aimed at improving the design procedures in room and pillar mining. A review is given o

    Jan 1, 1981

  • SME-ICGCM
    Seam Structure - An Important Criterion for Coal Pillar Design

    By Kot F. v. Unrug

    In spite of the extensive research and accumulated experience from mining operations, an appropriate pillar design remains an open issue. Due to the shrinking reserve base, present mining operations m

    Jan 1, 2005

  • SME-ICGCM
    Entry Stability Monitoring & Analysis For Longwall & Continuous Mining Systems

    By Wm. Mark Hart

    Under a specific geological condition, roof supporting method, and pillar-entry system, an entry convergence concept may be the most effective means that can be used to effectively indicate the longwa

    Jan 1, 1995

  • SME-ICGCM
    An Analytical Approach For The Estimation Of Pillar Strength

    A procedure fm the estimation of pilla1 strength is presented where the design of underground coal pillars is emphasized. An analytical approach has been developed, proposing that the effect of end co

    Jan 1, 1990

  • SME-ICGCM
    SDPS Update: Easy Calculation of the Edge Effect Offset for Complex Extraction Panels

    By Joshua Hescock, Zach Agioutantis

    "The Surface Deformation Prediction System (SDPS) has been developed as an engineering tool for the prediction of subsidence deformation indices through the implementation of an influence function. SD

    Jan 1, 2017

  • SME-ICGCM
    The Implementation of Rock Mechanics Into a Multiple Level Limestone Mine

    By David A. Newman

    In the 1950s, an underground limestone mine in the Camp Nelson Formation was developed from an outcrop exposure. The Camp Nelson Limestone met the requirements for DOT stone and aggregate. The mine

    Jan 1, 2014

  • SME-ICGCM
    New developments with the coal mine roof rating (7c278b2d-cc1e-4949-9bd2-643d1af010e5)

    By Chris Mark

    The Coal Mine Root Rating (CMRR) was first presented at this Conference nine years ago. Since Its Introduction, the CMRR has been incorporated into many aspects of mine planning. including longwall pi

    Jan 1, 2002

  • SME-ICGCM
    A Study Of Floor Heave In The Mines Of The Southern Coalfield Of New South Wales By Two Dimensional Finite Element Modelling

    By A. K. Bhattacharyya

    The excessive displacement of the seam floor in headings (i.e. roadways) called 'floor-heave' is often experienced in the underground mines of the Southern Coalfield of New South Wales. Apar

    Jan 1, 1992

  • SME-ICGCM
    Numerical and Physical Modeling as Planning Tools for Rockbolted Roadways

    By Peter Griesenbrock

    In German underground coal mining mostly arch and some rectangular roadways are used in the development work. Due to its positive results from numerical and physical modeling techniques as well as goo

    Jan 1, 2002