Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design and Construction Performance of a Large Diameter Tunnel Constructed in Soft-Ground by the Stacked Drift Method
By Paul H. Madsen, Victor S. Romero
The Tren Urbano project in Puerto Rico includes a 19 m diameter tunnel constructed by the stacked drift method, which involves installation of a pre-supported concrete arch using multiple tunnels. Geo
Jan 1, 2001
-
Construction of an Underpass Crossing in Proximity of a Railway Track
By Satoshi Honda, Mitsuru Shimizu, Tatsuji Nagao, Motoaki Kurisu, Hirokazu Izumi, Toshinori Takahashi, Hiroyuki Itoi
"1. INTRODUCTION Grade separation of roads and railway tracks is an effective method for solving traffic-related issues in cities. However, in urban areas where the existing traffic infrastructure is
Jan 1, 2016
-
Daylighting Thorn Creek Tunnel Into Chicago?s Tarp Thornton Composite Reservoir
By Cary Hirner
The Metropolitan Water Reclamation District of Greater Chicago (District) is in the final phase of completing the Calumet System component of the Tunnel and Reservoir Plan (TARP) by bringing the Thorn
-
Pit Lake Water Quality In The Western United States: An Analysis Of Chemogenetic Trends (bfd9cce3-6ac0-458c-b12a-e31d4a21ae75)
By Andy Davis
The evolution of pit lake water quality depends on the lithology and hydrologic characteristics of the ultimate pit surface, the availability of buffering capacity in the wall rock vs. oxidizable sulf
Jan 1, 1997
-
A study of radon regulation and pathology as it relates to underground hardrock mining
By D. M. Loring
Radon progeny have been a health and safety concern for miners since the mining of radioactive minerals began. Through the ?nuclear age?, it has become better understood and the regulations have becom
Jan 1, 2009
-
Effectiveness of a water curtain utilized for dust control on continuous miner sections
The Mine Safety and Health Administration (MSHA) conducted a respirable dust survey to evaluate the effectiveness of a water curtain utilized for dust control on continuous miner sections. The purpose
Jan 1, 2009
-
Laboratory Investigation of the Anisotropic ConfinementDependent Brittle–Ductile Transition of a Utah Coal
This paper was developed as part of an effort by the National Institute for Occupational Safety and Health (NIOSH) to identify risk factors associated with bumps in the prevention of fatalities and ac
Jan 7, 2020
-
Empire Pebble Crushing Circuit, Going Back To Basics, Is The Crusher Crushing?
By H. Walqui
This paper describes operating gains resulting from standardizing operating and maintenance practices to improve the performance of the pebble crushing circuit at he Empire Concentrator. Past efforts
Feb 27, 2013
-
Application of Ground Freezing for Underground Construction
By Helmut Hass, Michael S. Shultz
For many tunneling, deep shaft and deep excavation projects ground freezing is one of the best if not the only technique available to create a watertight and load bearing temporary support system in s
Jan 1, 2005
-
Electrochemical Study Of Gold Dissolution In Cyanide Solution (Preprint 00-90)
By H. K. Lin
Cyclic voltammetric and potential step chronoam-perometric techniques were used to study gold dissolution in cyanide solution. Three distinct anodic and one cathodic peaks appear on the voltammogram b
Jan 1, 2000
-
Terrorism and the Mining Industry
By A. Dale Wunderlich
Since Sept. 11, 2001, the author has been asked by several mining companies and mining publications to share some of his insights on how the terrorist attacks on the World Trade Center (WTC) and Penta
Jan 1, 2002
-
Designing, Installing and Maintaining Clean, Stable and Efficient Conveyor Belt Systems
By R. P. Stahura
Conveyors are the lifeline of mining and processing operations. They continuously supply materials to and carry finished products and waste away from operations. When conveyors are running at less tha
Jan 1, 1992
-
A Simple Method To Select A Pit In The Presence Of Grade Uncertainty
Mine planners must select a single pit for design with the knowledge that the grades on which this selection is made are uncertain. This uncertainty is often ignored through the use of deterministic m
Feb 27, 2013
-
OSHA Problems As Viewed By The Laborers' International Union Of North America
By Joe M. Short
More than eighty years ago, in what we generally consider a more leisurely age, workers and engineers began the construction of the longest railroad tunnel in the world. When completed, the Simplon Tu
Jan 1, 1979
-
Tire maintenance requires an entire team effort
By Roger Best
In the mining industry, where some of the vehicles are larger than a one-story house, tire maintenance cannot be accomplished by the tire shop alone. It takes an army of people to maintain a fleet of
Jan 2, 2010
-
Improving Storage And Handling Of Ores In Mining And Processing Operations
By Jayant Khambekar
In a typical mining operation, run-of-mine (ROM) ore is crushed and screened to achieve a desired particle size distribution and then fed to processing equipment for further refining. For an operatio
Jan 1, 2009
-
Increasing Coarse Particle Recovery Using The Flsmidth Selective Froth Recovery System
The recovery of coarse particles has been widely recognized as being limited by the froth in mineral flotation. In response to this, FLSmidth has developed the Selective Froth Recovery (SFR) System.
Feb 27, 2013
-
Driving Molycorp’s Conyeyor Decline at Questa
By D. R. Shoemaker, H. W. Judges
A 16.5-kt/d underground molybdenum mine is being developed at Questa in northern New Mexico by Molycorp Inc., a wholly-owned subsidiary of Union Oil Company of California. The new $200-million undergr
Jan 6, 1980
-
Amax Coal’s Delta Mine – Medium-Sized, High-Sulfur Operation Survives Markets Challenges
By Steve Kral
Amax Coal Industries Inc.'s Delta Mine is a medium-sized. high-sulfur coal producer that has lived up to the challenges posed by nearly six decades of a highly competitive domestic coal market.
Jan 1, 1993
-
Cat Tests 360-st 797 Truck, Upgrades Wheel Loaders
Caterpillar’s 797 327-t (360-st) mining truck is currently being tested at the company’s proving facilities. Mine evaluations began in the second quarter. The unit will be commerically available in
Jan 1, 1999