Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Simulating The Impact Of A Shale Gas Well Breach On Longwall Mine Ventilation Utilizing A Scaled Physical Model - SME Annual Meeting 2022By E. Watkins, S. J. Schatzel, V. Gangrade, R. Kimutis, J. Addis, C. Hollerich
The recent shale gas revolution in the United States has led to the drilling of hundreds of unconventional shale gas wells in active and future coal reserves in traditional coal-mining regions of Penn
Mar 2, 2022
-
Geotechnical Investigation and Design for the Sister Grove Outfall Tunnels - RETC2021By Michael Schultz, Gregory Sanders
In 2017, the North Texas Municipal Water District (NTMWD) initiated the design of the Sister Grove Regional Water Resource Recovery Facility (SGRWRRF) to provide additional treatment capacity for futu
Jun 13, 2021
-
Mining the Lake Superior Ores.By Duluth Engineers' Club, Engineers' Club of Northern Minnesota
"Prospecting and Exploration. Since the Lake Superior ores occur in pockets or distinct bodies and vary much as to character and location, the actual mining of the ores is preceded by much work of an
Jan 1, 1920
-
Improved Drill and Blast Designs Free $3.6m of Ore for Surface Copper Mine - SME Annual Meeting 2025By Liz Diaz, Tacio Ferreira
Capstone Copper’s Pinto Valley Mine faced challenges in recovering rock and ore on final walls because of geotechnical constraints that require restrictions on methods for loading blastholes adjacent
Feb 1, 2025
-
Computer Modeling of Underground Coal Mine Ventilation Circuits: Selection and Application of Airway Resistance ValuesBy Thomas H. Koenning, William E. Bruce
The importance and complexity of the ventilation systems in many underground coal mines necessitates the use of digital computers to model the ventilation networks. The modeling procedures used by the
Jan 1, 1987
-
Subsidence And Time (f502063a-1e46-48f7-bce7-16a2c063e8fa)By N. B. Aughenbaugh
Subsidence due to abandoned coal mines has received copious attention recently. This is a result of many factors such as the enactment of new mining laws and the effect subsidence has on land use over
Jan 1, 1983
-
Enabling Automation On Drilling Rigs; Improves Capability And ReachAutomated drilling in surface mines is here, it?s successful, and it?s already at work in mines around the globe. Coal, copper, iron and gold mines in large mining countries such as Canada, Australia,
-
Early Contractor Involvement and Observational Method Supported with Artificial Intelligence for Equitable Risk Management - NAT2024By David J. Hatem, K. Bhattarai
Effective risk management in major subsurface projects involves ways to mitigate adverse impacts to final design and construction approaches due to changed subsurface conditions. An Early Contractor I
Jun 23, 2024
-
Asset Maintenance Readiness By Metso Outotec - SME Annual Meeting 2022By E. Gutierrez, P. Gillies
Asset Maintenance Readiness (AMR) provides a tailored reliability and maintenance strategy specific to operational needs. AMR delivers reliability and maintenance foundations for the plant and equipme
Mar 2, 2022
-
Construction Of Southwest Interceptor #3 And #4 Cleveland, OhioBy Lawrence M. Lenahan
Cleveland's Southwest Interceptor Contracts No. 3 and No. 4 are continuations of Contract No. 1 addressed at the 1987 RETC with geology, equipment, and methods that differ greatly. The two con
Jan 1, 1989
-
2021 MPD Student Video Contest – Winning Abstracts - Mining, Metallurgy & Exploration (2021)By Qingqing Huang, Aaron Noble
The Mineral & Metallurgical Processing Division (MPD) of the Society for Mining, Metallurgy & Exploration held the first MPD Student Video Contest during the spring of 2021. The event showcased the wo
Sep 13, 2021
-
Practice And Operation Of The Angular Spiral Ball Mill Lining System At The San Manuel Division Concentrator Of Magma Copper Company, San Manuel, ArizonaBy P. A. Korpi
In March of 1978 the first set of Angular Spiral Liners utilized in grate discharge ball mills for wet grinding was put into service in the San Flanuel Concentrator of Flagma Copper Company. The use o
Jan 1, 1982
-
Ground Improvement Works and Construction of Six SEM Adits as Part of the Northeast Boundary Tunnel Project in Washington, D.C. - NAT2022By Basilio Giurgola, Federico Bonaiuti, Norbert Fuegenschuh
The North East Boundary Tunnel (NEBT) project in Washington, D.C. requires design and construction of several SEM adits which have to be built between lateral shafts and the NEBT-TBM Tunnel. The paper
Dec 1, 2022
-
Remote Control Mining With The Pushbutton Miner ? IntroductionBy Lester G. Rollins
Coal today enjoys a dominant position, serving the energy and metallurgical marketed The measure of success in the market place is, and will continue to be, the price per million BTUs or price per ton
Jan 1, 1966
-
Computer Approximation Of Three-Dimensional Surfaces In Surface Coal Mining And ReclamationBy David B. Costain
Three dimensional surface approximations are important means of evaluating physical and environmental factors that affect surface coal mining and reclamation. Computer approximated surfaces are projec
Jan 1, 1984
-
Assessing Activated Carbon Quality in Hydrometallurgical Circuits Analysis and Presentation of DataBy Richard H. Follis
Activated carbons used for precious metal recovery from carbon-inpulp (CIP), carbon-In-leach (CIL) and carbon-in-column (CIC) circuits often become fouled with Inorganic precipitates (i.e., CaCOa, Ca
Jan 1, 1992
-
Thiourea Leaching Of Gold From An Oxidised Gold-Copper OreBy Cheryl M. McInnes, Graham J. Sparrow, James T. Woodcock
Three composites, assaying about 3 g/t Au and 0.75% Cu, were investigated. Each contained oxide copper minerals, iron oxides, and silicates. One composite also contained copper and iron sulphides.
Jan 1, 1989
-
Radio Remote Control Of Locomotives ? I. IntroductionBy David Hartley
United States Steel Corporation Minntac Mine is located at Mt. Iron, Minnesota, on the Mesabi Iron Range. The taconite pit is two miles long by a mile wide, with a maximum depth of 170 feet. This pape
Jan 1, 1970
-
The Use Of A Microcomputer In The Design And Selection Of Materials Hoisting SystemsBy J. D. Patsey
A computer program has been developed for use by the mining engineer for analyzing drum-type hoists prior to the modification of an existing system or the designing of a new one. Its use permits the p
Jan 1, 1986
-
A Study Of Axial Backmixing In A 0.76-M Flotation ColumnBy A. M. Taweel, M. T. Ityokumbul, A. I. A. Salama, M. W. Mikhail
The liquid-phase mixing within CANMET's Western Research Centre's (WRC) 0.76-m-diem pilot-plant flotation column was characterized using a salt tracer. The process variables studied were fro
Jan 1, 1996