Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    New geological and geotechnical considerations within the Interoceanmetal exploration area

    By Ivo Dreiseitl, Kondratenko. Anatoly

    "The second prime area within the Interoceanmetal Joint Organization exploration area named H22 was delineated in 2013 with the goal to ensure sufficient nodule reserves for profitable mining operatio

    Sep 1, 2014

  • SME
    Warm Springs Ponds: Superfund Success

    By Harry E. Hughes

    A section of the largest Superfund site in the country has become a success story for engineering innovation and for cooperative problem solving. “Superfund site” and “success story” are phrases that

    Jan 1, 1996

  • SME
    Passive Integrating Measurements Of Radon And Thoron: Methods And Field Observations

    By S. Murdock, R. L. Fleischer, H. W. Alter, J. E. Gingrich

    The use of solid state track deters allows totally passive, integrating measurements of 222Rn (radon) or of 220Rn (thoron) plus radon. A track-detecting solid is placed in a holder that is closed by a

    Jan 1, 1981

  • SME
    Floodplain Aggregate Mining in Western Oregon

    By E. F. Schnitzer

    During 1996 and 1997, Oregon experienced flooding on a scale not seen in many years. Some gravel pits located near rivers experienced erosion. In several cases, breaches occurred between the gravel p

    Jan 1, 1999

  • SME
    The Effectiveness Of Task-Based Noise-Exposure Assessment Methods For Monitoring Miner Noise Hazards

    By C. Bise, A. Seal

    Excessive noise has long been a hazard in the coal-mining industry. Studies conducted during both the mid-1970s and the mid-1990s consistently show that hearing hearing loss within the mining industr

    Jan 1, 2001

  • SME
    Enhanced flotation separation of phosphate and dolomite using a new amphoteric collector

    By C. L. Jiang, B. K. Parekh, X. Shao

    Among the impurities present in phosphate ore, dolomite is the most difficult to remove. This is because dolomite and phosphate have similar chemical compositions and because the dissolved species of

    Jan 1, 1999

  • SME
    Design and Construction of the 42nd Ave S Storage and Treatment Tunnel for the Henderson/ML King CSO Project

    By J. Chae, D. Pecha, R. Andrews

    The Henderson/ML King CSO Project is a major combined sewer overflow (CSO)reduction project for the Department of Natural Resources and Parks of King County, Washington. The central element of the pro

    Jan 1, 2005

  • SME
    Jet Grout Ground Modifications for the Brightwater Conveyance System

    By Richard Hanke

    Tunnel construction on the Brightwater Conveyance System?s East and Central contracts required ground modifications of the existing site soils, comprised of sandy alluvium to very dense glacial till,

    Jan 1, 2008

  • SME
    Evaluation Of Blast Fragmentation In Quarries Nearby Istanbul ? Introduction

    By T. Hudaverdi

    Control of the particle size distribution of a muckpile after blasting is always an important subject for mining industry. Blasting has a significant impact on downstream processes such as loading, cr

    Jan 1, 2012

  • SME
    Design Analyses for a Large-Span Tunnel in Weak Rock Subject to Strong Seismic Shaking

    By Bhaskar B. Thapa

    The proposed Caldecott fourth bore will consist of a two lane highway tunnel along California State Route 24 near the City of Oakland. The proposed design and construction sequence for the 15-m-diamet

    Jan 1, 2008

  • SME
    Successful Tunneling for Water Tunnel No. 3, New York City, New York

    By Thomas P. Kwiatkowski, Joginder S. Bhore, Christopher D. Orlandi, Jose Velez

    Three case histories of successful TBM tunneling for New York City Water Tunnel No. 3 are presented. The tunnels, costing about one billion dollars total, are the 5-milelong, 18'-11" OD Brooklyn

    Jan 1, 2007

  • SME
    New York Subway Caverns and Crossovers—A Tale of Trials and Tribulations

    By Charles Stone, Madan Naik, Drupad Desai, Karel Rossler

    Planning of New York’s new subway line dictated the location of shallow underground station caverns and track crossovers. Clear span openings ranging from70 feet to 100 feet and lengths in excess of 1

    Jan 1, 2005

  • SME
    Holistic planning and approval of sustainable lignite mining and utilization

    By L. Kulik, J. den Drijver

    Rhenish lignite will continue to play an indispensible role in the energy mix of the German Federal Republic for a long time to come. The use of lignite for electricity generation, upgrading and, if n

    Jan 1, 2011

  • SME
    Using Option Pricing to Predict Market Values of Publicly Traded Mining Companies

    By Andrew K. Simpson

    What will this deal do to the company’s stock price? This question arises when a publicly traded mining company is presented with a new mine project, or business combination. The standard tool fo

    Jan 1, 2000

  • SME
    Robot-Human Control Interactions In Mining Operations (0b1217a6-1d54-43fe-b0e6-c8bd395d732a)

    By G. Danko, R. Tiwari, J. Knowles

    Many excavation and loading tasks require equipment operators to simultaneously coordinate the motion of multiple machine links, in order to achieve complex tool trajectories. Efficiency, ore selecti

    Jan 1, 2006

  • SME
    Singapore’s Deep Tunnel Sewerage System—Experiences and Challenges

    By Richard F. Flanagan, Robert H. Marshall

    The Republic of Singapore’s Public Utilities Board is implementing the Deep Tunnel Sewerage System Project. The project’s deep tunnel component, 48 km of deep, large diameter sewer tunnels has been su

    Jan 1, 2007

  • SME
    Soil Deformation Analysis During TBM Excavation: Comparing Three Different TBM Technologies Used During the Construction of the Toulouse Metro Line B

    By Richard Kastner, Emilie Vanoudheusden, Fabrice Emeriault, Jacques Robert

    INTRODUCTION The subway line B of Toulouse (France) has been realized with three different tunnel boring machines (TBM) techniques: Contracts 2 and 5 are excavated with earth-pressure balanced TBM

    Jan 1, 2007

  • SME
    Real-time measurements of diesel EC and TC in a Nevada Gold Mine with photoacoustic and dusttrak instruments: Comparison with NIOSH 5040 filter results

    By W. P. Arnott

    This paper presents real time photoacoustic measurements of diesel-soot black-carbon (BC or EC) and Dusttrak nephelometer total carbon (TC) concentrations in a Nevada gold mine. Comparisons with time-

    Jan 1, 2009

  • SME
    Engineered Pumpable pHoam?: A New Innovative Method For Mitigating Ard

    If one can embrace the medical analogue, much of the mining industry currently suffers from a massive bacterial infection. When pyrite-bearing or sulfide-bearing rock formations, tailings, or mine was

    Jan 1, 2012

  • SME
    History of the Getchell Gold Mine

    By Robert C. Horton

    The Getchell Mine is located on the east flank of the Osgood Mountain Range in the Potosi Mining District, Humboldt County, NV. Mining in the area first began in 1883 for copper, lead and silver in s

    Jan 1, 1999