Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A New Computer Program For The Design Of Ventilation Emergency Plans ? Introduction
By Rudolf E. Greuer
It is undisputed that an interaction between mine fires and mine ventilation systems exists. The ventilation carries the poisonous and sometimes explosive combustion products, which constitute the gre
Jan 1, 1980
-
Program-Wide Geo-Instrumentation Monitoring for the MTA East Side Access Project
By Dilip I. Patel, Jesus Schabib, W. Allen Mawr, Daniel A. Louis
East Side Access (ESA) will extend Long Island Rail Road into midtown Manhattan via 11 km of tunnels, a new terminal station and associated rail support facilities. The hard-rock tunneling in Manhatta
Jan 1, 2007
-
Middle Rouge Parkway Interceptor Extension—A Case History
By Harry R. Price, Behrooz Tahmasbi, Charles J. Roarty
The 2,408 meter (7,900-foot) long Middle Rouge Parkway Interceptor Extension varies in size from 1.52-meter (5-foot) to 2.36 meter (7-foot 9-inch) inside diameter. Most of the sewer was constructed in
Jan 1, 2007
-
Stochastic modeling of iron in coal seams using two‐point and multiple‐point geostatistics: A case study (Mining, Metallurgy & Exploration)
By Nasser Madani, SULTAN ABULKHAIR
The abstract of the paper discusses the challenge of quantifying iron content in a coal deposit in Kazakhstan. The iron dataset is limited, coming from only three drill holes and some stope samples, w
Mar 30, 2022
-
Productivity Gains Using A Computer-Aided Earthmoving System On A Track-Type Dozer
By D. R. Gagnon
Mining companies are continually looking for product-ivity and efficiency improvements with their equipment to reduce operating costs. This paper will review the results of a productivity analysis co
Jan 1, 2002
-
Recent Changes In Statute And Case Law: Effects On The Value Of Intellectual Property Assets ? Introduction
By W. O. Kerr
As in other industries, companies engaged in mining and extraction use and develop intellectual property (?IP?) in the form of new technologies or production processes. The development of IP assets i
Jan 1, 2012
-
Commissioning Of A 750 KW Centrifugal Fan At Pt Freeport Indonesia’s Deep Ore Zone Mine
By F. Calizaya
The PT Freeport Indonesia‘s Deep Ore Zone(DOZ) copper deposit is located in the province of Irian-Jaya, Indonesia. Currently, a block cave mine is being developed around this deposit. Production is sc
Jan 1, 2000
-
Recent Advancements In Slurry Shield Tunneling
By Yoshihiro Kawarabata
INTRODUCTION With only about 30% of Japan's entire population served by sewer systems at the end of 1980, extensive sewerage construction programs have been implemented. As major sewer network
Jan 1, 1983
-
An Innovative Finite Tube Method for Coupling of Mine Ventilation Network and Gob Flow Field: Methodology and Application in Risk Analysis "Mining, Metallurgy & Exploration (2020)"
By Yi Luo, FENGLIANG WU
Explosions and fires originated from longwall gob due to the formation of methane-air mixture have been a severe threat to coal miner’s lives.Many numerical studies on coalmine fire and explosion haza
Jul 10, 2020
-
The Ivar Project - An Uncommon, Everyday TBM Tunnel
By Yngve Jordal, Sverker Hartwig
The IVAR Project is Norway's largest sewer project presently under construction. One part of it is an 8.1 km (26 575 ft) long, 3.5 m (11 ft 6 in.) diam tunnel, bored in one year. The tunneling pr
Jan 1, 1991
-
Application of impact-resistant steel sets for underground roof fall rehabilitation - SME Transactions 2011
By J. C. Stankus, K. J. Ma, D. Faulkner
To protect mine personnel and moving equipment at underground roof fall areas, mine operators typically install steel sets, which are covered with wooden blocks and backfilled with an expanding-type c
Jan 1, 2011
-
Port of Miami Tunnel Update?A View From Design Builder?s Engineer
By Wern-ping Chen
Technical and non-technical challenges exist in each mega infrastructure project. It?s no exception to the first US underground PPP Port of Miami Tunnel (POMT) project in Miami, FL. The POMT will conn
-
Hydrothermal Silicification and Alteration of Breccias from Lucky Strike and Menez Gwen hydrothermal fields (Mid-Atlantic Ridge, Azores)
By I. A. Costa, Y. Fouquet, F. Barriga
"Lucky Strike and Menez Gwen are two hydrothermally active sites located along the border of the Azorean plateau, southwest of the Azores islands where the alteration processes affecting basaltic rock
Sep 1, 2014
-
New Approach To Developing The Optimal Mineral Processing Flowsheet
By Glenn E. Hoffman
Relax: the world today is not running short of many mineral commodities, even though prices are spiraling upward. Einstein?s observation still holds true that everything is still relative, as long as
Jan 1, 2012
-
Geology of the Brewer Gold Mine in South Carolina
By W. Scheetz
The Brewer Gold Mine is an open-pit, heap leach operation that processes about 122 kt/m (135,000 stpm). The mine is operated by Brewer Gold Inc., a subsidiary of Westmont Mining Inc., and is located n
Jan 1, 1991
-
The Expansion Of Tarkwa CIL Plant From 4.2mtpa To 12mtpa
By E. Barnard
Tarkwa Gold Mine is located in south western Ghana, and is majority owned and operated by Gold Fields Ghana Limited. The Tarkwa CIL plant utilises a single low aspect 27' x 42' 14MW dual pin
Jan 1, 2008
-
Exploration Review (9d246178-a5c1-4a8e-8bc1-7c65b46f2b9e)
By N. A. Karl, D. R. Wilburn
"This summary of international mineral exploration activities during 2017 draws upon information from industry sources, published literature, SNL Metals & Mining (SNL), an offering of S&P Global Marke
Jan 5, 2018
-
Role Of Gas Pressure In Underground Coal Mine Bursts And Bump
Face and pillar bursts, bumps and bounces are violent failures that occur in underground coal mines in response to a complicated interplay of face and pillar geometry, seam depth, coal properties and
Feb 27, 2013
-
Reclaiming Steep-Slope Eastern Coal Mines For Successful Reforestation
A methodology has been developed and demonstrated to be effective in reclaiming surface-mined land for a forestry post-mining land use. The Forestry Reclamation Approach (FRA) has been applied, almos
Jan 1, 2011
-
Cracking The Code—Assessing Implementation In The United States Of The Codes Of Practice For Risk Management Of Tunnel Works
By Terry W. Mellors, Robert J. F. Goodfellow
The underground industry has been forced to reconsider risk management sincethe introduction and implementation of the “Joint Code of Practice for Risk Management of Underground Works in the UK” publi
Jan 1, 2007