Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Gas Monitor Simulator Development And Mine Rescue Contest Field Trials

    By D. W. Alexander

    Researchers from the Office of Mine Safety and Health Research (OMSHR) of the National Institute for Occupational Safety and Health (NIOSH) completed field trials during coal mine rescue contests usin

    Jan 1, 2011

  • SME
    Design of the University Link Tunnels and Stations

    By Daniel N. Adams

    The University Link project extends Seattle?s light rail from downtown to University of Washington (UW). It includes 5.0 kilometers (3.15 miles) of twin-bored, 6.4 meters (21 feet) excavated diameter

    Jan 1, 2008

  • SME
    The State of Mining Education;What Does the Future Hold for the Next Generation

    By John Marsden

    Despite the recent pullback in metal and mineral prices, and the associated market adjustments, the mining industry is still facing a serious issue with the declining availability of graduate expertis

  • SME
    Specimen Mining at the Sweet Home Mine in Colorado’s Alma District

    By Paul Bartos

    Operations at the Sweet Home Mine transformed the mineral specimen industry, not only in the development of new innovative extraction techniques, but also in the fields of sample preparation and marke

    Jan 1, 2007

  • SME
    Design and Risk Management Strategy for the Sound Transit Beacon Hill Station and Tunnels

    By Joseph Gildner, Donald J. Phelps, Jürgen Laubbichler, Christopher Tattersall, David McAllister

    The Beacon Hill Station and Tunnels portion of the Sound Transit Central Link Project consists of one mile of twin rapid transit tunnels, an underground station, portals and ancillary works constructe

    Jan 1, 2005

  • SME
    Monitoring Of Natural Heat Occurrence At The Bear Canyon Coal Mine

    By Miles T. Stephens, Felipe Calizaya, Jacob O. Kingston

    Currently, the Bear Canyon Mine is facing the challenge of excessively high coal and rock temperatures in one of its headings. In Mine No.3, the air temperature at the 6th Right panel reached 36.4ºC a

    Jan 1, 2005

  • SME
    Selected Factors Affecting Longwall Mine Layouts In The Pittsburgh Coalbed Of Southwestern Pennsylvania

    By A. Iannacchione

    Longwall mining began within the Pittsburgh coalbed of Pennsylvania (PA) in the early 1970?s. Originally, longwall mine layouts were designed to fit within existing room-and-pillar operations, where

    Feb 27, 2013

  • SME
    Planning And Preparation For Tunneling At Brightwater West

    By Mina M. Shinouda

    Brightwater West (BT4) represents the state of the art in utility tunneling, namely a long relatively small diameter, soft ground tunnel, with no intermediate shafts, under significant groundwater pre

  • SME
    Placement Of Concrete Lining For Water Tunnel No. 3, Manhattan Portion

    By Robert Labbe

    The final tunnel lining for this project involved pumping vast quantities of concrete over large distances under the extremely busy streets of lower Manhattan. Approximately 68,000 cubic meters (89,00

  • SME
    Toward a Mine-Wide, Real-Time, and Autonomous Geotechnical Change Detection, Monitoring, and Prediction Framework for Underground Mines

    Adverse ground behavior events, such as convergence and falls of ground, are some of the most significant challenges and hazards in underground mines. Our goal is to work toward mine-wide, digital, an

    Jul 28, 2020

  • SME
    Effect of Surfactants in Dust Control by Water Sprays

    By H. Polat, Q. Hu, S. Chander

    The collection efficiency of dust particles was determined in a laboratory dust chamber equipped with a water spray. Measurements were made in the presence of selected nonionic, cationic and anionic s

    Jan 1, 1992

  • SME
    Separation and Recovery of Iron and Nickel from Low-Grade Laterite Nickel Ore Using Reduction Roasting at Rotary Kiln Followed by Magnetic Separation Technique Mining, Metallurgy and Exploration

    By Yang Ge, Yuzhu Pan, Mansheng Chu, Jue Tang, Cong Feng, Lihua Gao, Zhenggen Liu

    The low-grade nickel laterite ore used in this study was successfully upgraded through selective reduction by industrialized rotary kilns followed by magnetic separation. The results indicated that bo

  • SME
    Seismic Upgrades of the Claremont Tunnel

    By Bill Cain, R. John Caulfield, D. Scott Kieffer

    The East Bay Municipal Utility District is undertaking seismic upgrades of the Claremont Tunnel in the San Francisco Bay area. The tunnel carries treated water across the active Hayward Fault to suppl

    Jan 1, 2001

  • SME
    Siemens Controllers Aid Processing at the Madero Project

    By Rolando Gonzalez

    Mexico’s role in the world economic community continues to grow. And it is important that the country makes use of its natural wealth, including its large underground deposits of minerals and metals.

    Jan 1, 2003

  • SME
    Underground Construction For A Combined Sewer Overflow System In Providence, Rhode Island

    By John L. Kaplin

    The underground construction for the Phase I Combined Sewer Overflow(CSO) Project is on an impressive scale by any measure, appearing more so in a midsize city like Providence, RI. The Narragansett Ba

  • SME
    Impact Of Nitrogen Inertization On Methane Distribution In Bleederless Longwall Gobs

    By J. Marts

    Underground longwall coal mining sections are operated as sealed gobs if the coal is prone to spontaneous combustion. Sealing along the gate roads during longwall face retreat limits the flow of fresh

    Feb 27, 2013

  • SME
    Numerical Analysis of a Rock Bolt Load Indicator Washer Neglecting the Stress Relaxation Effect Mining, Metallurgy and Exploration (1651f380-7da4-4089-a8ef-ce53aa560d38)

    By Eugie Kabwe

    Rock bolts are components of tunnel support structures and their efficacy in reinforcement requires the appropriate estimation of the bolt pre-tension. However, cases of ineffective rock bolt applicat

  • SME
    Risk Considerations and Design for the Downtown Deep Sewer Tunnels, Austin, Texas

    By Greg Wieland

    Deep sewer tunnels are required to meet future growth demands of the City of Austin?s down-town redevelopment. The tunnel is 18,000 ft long and varies in finished diameter from 54 inches to 96 inches.

    Jan 1, 2008

  • SME
    Cresson Mine Completes Two-Year Expansion

    By William R. Yernberg

    The Cripple Creek & Victor Gold Mining Co.(CC&V) celebrated completion of a two-year, $168.5-million expansion and capital improvement program. An open house celebration was held in the historic mini

    Jan 1, 2002

  • SME
    Coal Review

    By F. Freme

    Coal production in the United States in 2008 reached a record level of 1.06 Gt (1,171.5 million st), according to preliminary data from the U.S. Energy Information Administration (EIA) (Table 1). This

    Jan 1, 2009