Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Pre-Split Economics and Practice at Gold Fields Operating Co. - Chimney Creek Mine

    By Lyle Avey

    For the purpose of this paper, testwork and general pre-splitting practice will be discussed for the Chimney Creek Mine.

    Jan 1, 1990

  • ISEE
    Determination of Seismic Velocity from Quarry Blasts Using GPS Enabled Vibration Monitors

    By William. J. Birch, Catherine. E. Johnson, Robert Farnfield

    Rocks and other materials can be characterized by their elastic properties. However, seismic velocities represent a more practical set of physical properties for seismic methods. Seismic velocities de

    Feb 6, 2023

  • ISEE
    Oversize Quantification Using Drone-Based Fragmentation Analysis

    By Nolan Eckroade

    The demand for blast optimization within the quarrying industry calls for more effective, faster and safer methods of quantification of blast performance. Drones provide the ability to safely and quic

    Jan 1, 2018

  • ISEE
    The Effect of Inclined Boreholes on the Quality of Blast Results in Coal Mining - Comparison Between Field and Simulated Results

    By D Schneider, H Elliott

    The advantages and disadvantages of using inclined boreholes in blasting has been under discussion for a long time. Some recognized disadvantages are that drilling costs, both operating and capital co

    Jan 1, 1988

  • ISEE
    Blast Damage Predictions from Vibration Measurements at the SKB Underground Laboratories at ASPO in Sweden

    By Conny Sjoberg, Finn Ouchterlony, Bjorn Jonsson

    This contribution reports an investigation of the blasting damage in the contour of an access ramp to a Swedish underground laboratory for nuclear waste related studies. Near zone vibration measuremen

    Jan 1, 1993

  • ISEE
    Attenuation of Ground Vibration Induced by Blasting at Can Open - Pit Lignite Mine in Turkey

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Savas Gorgun

    The principal disturbances created by blasting in open pit mines are vibrations, air blast and fly rock. All of them, under some circumstances, caused damage to structures nearby and apart from this c

    Jan 1, 2001

  • ISEE
    Vibration Monitoring and Control of Blasting Associated with the Construction of a Highway Next to a Show Cave

    By Paul Worsey, Gerald Rupert, Mark Kirkbride

    The realignment of Highway H in the proximity of Crystal Cave (Springfield MO.) required the development of a blasting program that was both economical and efficient for construction, yet ecologically

    Jan 1, 1997

  • ISEE
    The Relationship between Hole Spacing and Misfires of Permissible Explosives

    By Richard J. Mainiero, Michael S. Wieland, Harry C. Verakis

    The Bureau of Mines, U.S. Department of the Interior, has been conducting research on delay blasting in underground coal mines in support of the efforts of Mine Safety and Health Administration (MSHA)

    Jan 1, 1986

  • ISEE
    Blasting In Hong Kong

    By R L. Keller

    Hong Kong has some of the most restrictive practices regarding blasting than any place in the world. Regulations regarding vibration limitations are 1 in/sec for structures and 0.5 in/sec (or even les

    Jan 1, 1997

  • ISEE
    Blasting Accidents in Underground Mines a Two Decade Summary

    By Harry Verakis, Thomas Lobb

    This paper is a summary and an update of the underground mine blasting accident investigations and studies previously conducted by the Mine Safety and Health Administration (MSHA) and the former US. B

    Jan 1, 2002

  • ISEE
    So You Think You Are Monitoring Peak Particle Velocity

    By R A. Farnfield

    Measurement of the environmental impact of ground vibration from blasting operations is based almost exclusively on the peak vibration level generated. This measurement is known as the Peak Particle V

    Jan 1, 1996

  • ISEE
    A Blast Vibration Prediction and Data Storage Computer Program

    By Jerry W. Schweiker

    An extensive computer program has been developed which will store and analyze pertinent blast related parameters such as date, time, shot coordinates, charge, delay times, etc. In conjunction with the

    Jan 1, 1984

  • ISEE
    Computer Simulation of Explosive Demolition of Structures By Using Nerual Network

    By Gungor Tuncer, Erhan Bakirci, Ali Kahriman, Atilla Ozmen, O. Nuri Ucan, Savas Gorgun

    There are several methods for demolition of structures but most of them depend mostly on conventional ways of using machines for breaking and crushing structural elements. However the need for lots of

    Jan 1, 2002

  • ISEE
    Advanced Primer Designs

    By Tim A. Beattie, John R. Grant, David L. Kennedy

    After many years of research, ICI staff have developed a numerical modelling system for the study of detonator/primer/explosive configurations. Results from this work clearly identified that current p

    Jan 1, 1991

  • ISEE
    The Largest Chemical Explosion on the Australian Continent: The Ord River Project

    This case history refers to the detonation of the two largest chemical explosions on the Australian continent. An important element of feasibility studies and construction guidance included prediction

    Jan 1, 1995

  • ISEE
    Productivity Improvements in Longhole Stoping with Repumpable Emulsions

    By Rolly Thorpe

    Bulk emulsion explosives have been used at surface mines and quarries for many years. Recently, this technology has been adapted for underground use in relatively confined work areas and in smaller di

    Jan 1, 1994

  • ISEE
    Achieving Non-Duplicated Firing Times in Multipledeck Priming of Individual Blast Holes in Surface Coal Mining Using Non-Electric Down-the-Hole Primers and Electric Surface Initiation

    By James Ludwiczak

    We are coming to an end of an era in Midwest surface coal mining. For many years, large tracts of coal lands were readily available for sale or lease to surface mine operators.

    Jan 1, 1980

  • ISEE
    Cost Determination

    By Gary B. Hemphill

    Estimators will agree that estimating for excavation is the most difficult costing task. Equipment costs and production rates are the toughest to determine. The following illustration is a method that

    Jan 1, 1976

  • ISEE
    Experiences and Applications with Wassara Water Hydraulic Down Hole Drilling Systems

    By Graeme Exelby

    The 4" Wassara water hammer was originally developed by G-Drill AB together with Swedish Mining Company LKAB for their underground long hole production drilling. Sandvik Rock Tools AB is responsible f

    Jan 1, 1998

  • ISEE
    Journal: Blast Vibration and Seismograph Section / Post Blast Assessment Using Blasting Seismograph Data

    By Kenneth Eltschlager

    Post-blast assessment techniques using off-site data which includes location, seismograph and photographic data were discussed during the Blaster’s Weekend at this year’s ISEE Conference. Blast and pr

    Jan 1, 2007