Guidelines for Soil Mixing
"1.0 INTRODUCTIONThese Guidelines reflect the state-of-the-practice of the Deep Mixing Method (DMM) in North America. DMM is an in situ mixing process that breaks down the soil structure; injects bind
Jan 1, 2016
-
Real Time Monitoring the Historic Old South Church, Boston, Massachusetts
By Pierre Gouvin, Michael Oakland
"This paper covers the rapid response methods used to monitor the emergency response to damage to an historic structure. An architectural gem, the latest incarnation of the old south Church was comple
Jan 1, 2017
-
Foundations Of The 'Kö-Galerie' In Düsseldorf Using Top/Down Building Technologies
By P. Arz
With a total of five basement levels, ground floor and a further six levels above grade, construction of the Kö-Galerie building, on the Königsallee, in the centre of Düsseldorf, was completed with al
Jan 1, 1989
-
Statnamic Load Testing Of High Capacity Marine Foundations (62a0500e-14c7-4ace-9608-4578694a5392)
By Mike Muchard
STATNAMIC load testing augmented with embedded instrumentation has been successfully used to obtain structural and geotechnical design information on large diameter spun cast concrete cylinder piles o
Jan 1, 2013
-
Ground Improvement by a Combination of a Mixed-In-Place (MIPTM) Lattice Grid Wall and Stone Columns to Mitigate the Risk of Liquefaction and Lateral Spreading
By Noreen Tarac, Pablo Forgoso, Philipp Schober
A multiple use storage facility building is being developed in the Philippines on a peninsula that was reclaimed in the 1990s without any soil treatment. The subsoil now consists of loose to medium de
Sep 8, 2021
-
Hybrid Shoring Solutions for a Challenging Excavation Project Adjacent to a Subway – 21 Avenue Road, Toronto
By Graeme Smart, Thomas Fiala
"Yorkville Plaza II, a 40-storey signature condominium residence, is scheduled to open on Avenue Road in Toronto’s prestigious Bloor-Yorkville neighbourhood in spring 2017. In close proximity to Toron
Jan 1, 2015
-
Execution Example of the Expanded Dry Jet Mixing (EX-DJM) Method (71db6e71-57a4-4d54-81bc-d746d501291d)
By Kiyotaka Ohno, Nobushige Yasuoka, Yosuke Hioki
"The diameter of improved columns adopted by the original DJM Method had been 1000 mm, however, in order to comply with the social need for construction cost reduction, the Expanded Dry Jet Mixing (EX
Jan 1, 2015
-
The Berkeley Art Museum: Repurposing a Historical Building
By Timothy Nelson, Simon Burnworth
"The Berkeley Art Museum and Pacific Film Archive (BAMPFA), which currently resides in a 1970s-era post-modern concrete structure just south of the University of California, Berkeley campus, was in ne
Jan 1, 2016
-
Granular Pile For Ground Improvement ? Synopsis
By G. Ranjan
The designers and the practicing engineers have started using latest and cost effective techniques of ground improvements which utilise the weak and poor sub-soil deposits efficiently for the civil en
Jan 1, 2010
-
Pile Test Results - 1-15 Corridor Reconstruction Project, Salt Lake City, Utah (Abstract Only) - DFI Member Conference - Seattle, 1998
By D. M. Holloway
As a part of the 1-15 Reconstruction Project, static and dynamic (high-strain) testing methods formed the basis to estimate long-term axial capacities, and to assess the magnitudes of bearing capacity
Jan 1, 1998
-
Seismic Remediation of Perris Dam
By Michael W. Driller, Wen Yan (Grace) Chen, Steven J. Friesen
"Remediation for Perris Dam has been proposed in response to deficiencies identified in a seismic stability study prepared by the California Department of Water Resources (DWR) in 2005. Lenses of pote
Jan 1, 2015
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope Terminal 46 Apron Upgrade, Port Of Seattle, WA (18615664-0169-4e91-aa2b-8ec5994bb0a0)
By Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
Geotechnical Challenges of Pile Driving in a Marginally Stable Slope TERMINAL 46 APRON UPGRADE, PORT OF SEATTLE, WA
By Monique Nykamp
"INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the
Jan 1, 2007
-
Piling Adjacent To Rail Tunnels At King’S Cross Central
By David A. Hart, Barry P. Osborn, Richard J. Totty, Ana T. Carvalho, Max B. Elliott
This paper addresses the experience designing and installing bored piles for the King’s Cross area. This includes continuous flight auger and rotary bored piles, with a range of diameters between 600
May 1, 2022
-
8000 Series Piling Rig
By Roger A. Bullivant
The introduction of this size and type of piling rig is intended to address a multipurpose foundation activity. The 8000 denotes the size of equipment that is attached to the mast, namely 8000 Kg. Lar
Jan 1, 1995
-
Optimization of Drilled Shaft Design for a Highway Bridge in Arizona Using Load Test Results (0a742001-9cf1-441f-b0fc-5890697ef97e)
By John C. Niedzielski, A. Frances Ackerman
The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter) l
Jan 1, 2017
-
DFI Europe Monitoring and Instrumentation Committee Objectives
By Rob van Dorp
"AbstractThe Monitoring & Instrumentation Committee (MIC) of DFI Europe has the objective to support DFI members in concern of risk management of geotechnical matters, where monitoring and instrumenta
Jan 1, 2014
-
Equipment Installation - Recent Developments: General Report On 'Installation Equipments' ? 1 Introduction
By A. Paviani
The subject of this session is "Equipment Installation, Recent Developments". This is a subject which is not usually addressed at conferences of Foundation Engineering. It is rare to find sessions
Jan 1, 1994
-
SIMBAT Dynamic Pile Testing - Results of an Independent Pile Capacity' Prediction Event
By Richard T. Stain
"In 2001, a pile trial site was established at Limelette in Belgium consisting of 25 displacement screw piles and 5 driven pre-cast piles. Interested parties were invited to participate in a pile pred
Jan 1, 2005
-
Anchored Diaphragm Wall and Dewatering System for Libya Hotel
By Claudio Asioli
"The project’s goal was to construct the Al Ghazala Intercontinental, a multi-use development in the bay area of Tripoli overlooking the Mediterranean Sea. The site of the project is located approxima
Jan 1, 2017