Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, Dc
By Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey
Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and
Oct 1, 2022
-
Safety Evaluation Of Adjoining Structures In Urban Areas During Deep Excavation: A Case Study Of Nagpur Metro
By Shreya Vivek Hokam, Dr. A. I. Dhatrak, S. W. Thakare, Dr. Vivek S. Hokam
Construction in congested urban areas has necessitated tall and massive structures. In urban areas, it is common to construct underground structure nearby existing buildings. Selection of an appropria
Sep 1, 2022
-
Nearshore Pile Construction Experience In Burnie, Tasmania
By Thomas W. Scott, Manh N. Tran
Marine environments present a range of challenges for pile construction. This paper contains a discussion on the design and construction of marine piles for a recent Toll Shipping wharf upgrade in Bur
Nov 1, 2022
-
The Effc/Dfi Guide To Support Fluids For Deep Foundations
By Chris Harnan, Christophe Justino
The European Federation of Foundation Contractors (EFFC) and the Deep Foundations Institute (DFI) jointly published Edition 1 of the ‘EFFC/DFI Guide to Support Fluids for Deep Foundations’ in April 20
May 1, 2022
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KY
By Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
Philadelphia Dock Story—Pile Challenges at Delaware River
By Craig H. Olson
"A new ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at
Jan 1, 2008
-
Westlink Projects – Geotechnical Challenges During The Execution Phase
By Robert Thurner, Albin Norrman, Sami U. Raja
The West Link is a double track railway project currently under construction in Gothenburg, Sweden. The project includes the construction of 8 kms of track, 6 kms of which will be in tunnels. Beside s
May 1, 2022
-
Securing of In-Situ Cement Mixing Quality for the Expansive Soil with the ‘Montmorillonite’ Inclusion
By Masaru Sakakibara, Ngo Tuan Anh, Mitsuo Nozu
"In the southern region of Vietnam and the southern United States, numbers of Deep Mixing (DM) columns have been installed to increase the stability of slopes and mitigate ground settlement. However,
Jan 1, 2015
-
Soil Nail Design Optimization of 100 Ft Deep Excavation Project in San Diego, CA
By Babak Mamaqani, Pirooz Barar
The Heights project was located at Fashion Valley North, San Diego, CA. The scope of the project was to replace two existing commercial buildings with a large 7-story multi-family residential building
Sep 8, 2021
-
Top-Loaded Bi-Directional Test and the Conventional Bi-Directional Load Test, a Direct Comparison
By Patrick J. Hannigan, Seth Robertson, Frank Rausche, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (“TLBT”) and the conventional Bi-Directional Load Test (“BDLT”) are full-scale load tests where loads are applied bi-directionally to the foundation element. The BDL
Sep 8, 2021
-
Re-Use Of Old Pile Foundations In Amsterdam
By Remco Offenberg, Marcel Bielefeld, Martijn van Delft
The question of the continued suitability of existing foundations arises when the function of the superstructure changes. This can occur when the superstructure is replaced or when the existing struct
May 1, 2022
-
Embodied Carbon Assessment For A Multi-Phased Development Pile Testing Strategy
By Jack Taggart, Chris Barker
Pile load testing strategies for large infrastructure projects and multi-phase building developments have historically justified cost and programme benefits for undertaking advance preliminary and wor
May 1, 2022
-
Philadelphia Dock Story—Pile Challenges at Delaware River (06bf9951-abf5-4656-aab7-81fa955662d4)
By Craig H. Olson
"Anew ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at t
Jan 1, 2008
-
San Diego Courthouse Commons Shaft Shoring And Tunnel Canopy Tubes
By Ali Nasirian Ph. D., Gabriel Carvajal
To facilitate the safer and more secure transportation of inmates from San Diego Central Jail to the new San Diego Courthouse, the County of San Diego committed to building a new transfer facility as
Oct 1, 2022
-
Load and Resistance Factor Design – Past, Present and Future
By Silas C. Nichols, Jennifer E. Nicks
"Limit states design (LSD), or load and resistance factor design (LRFD), is a method to account for the uncertainty in loads and resistance through a reliability calibration that requires all applicab
Jan 1, 2015
-
Cannonsville Dam Emergency Borehole Response
By John Vickers, William H. Hover, Paul C. Schmall
"Any sudden subsurface issue that threatens the stability of existing buildings or infrastructure is cause for immediate investigation and prompt remedial action. Nowhere is this more true than the n
Jan 1, 2016
-
Washington Avenue Tunnel Project: Fortifying Aging Underground Infrastructure
By Andrew R. Klaetsch, Peter W. Deming
"The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th
Jan 1, 2016
-
Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee Program
By Louay Owaidat, Daniel Jabbour, Allan Frappier, Jose Gomez, Mark Stanley, Tino Maestas
The U.S. Army Corps of Engineers (USACE) is implementing a levee strengthening program along the Sacramento River East Levee (SREL) designed to correct 11 miles of deficient levees as identified by re
Sep 8, 2021
-
Economic Design Of Piling Platforms On Coarse Grained Subgrade
By Patrick Wong
The design of piling platforms is addressed in BRE (2004) for both fine grained and coarse grained subgrades. However, for coarse grained subgrades, piling platform designs can often be overly conserv
Nov 1, 2022
-
Capacity of Hydraulically Jacked Piles
By Howard A. Perko, Melinda J. Hummel
"Hydraulically jacked piles, herein referred to as jacked piles, are commonly used for underpinning existing structures to arrest settlement or augment an existing foundation for higher loads. They co
Jan 1, 2017