Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Study of Gold-activated Carbon Electrodes for the Production of Hydrogen Peroxide

    By Philippe V. Scheers

    Polycrystalline gold, glassy carbon and gold-activated glassy carbon electrodes were compared for the production of hydrogen peroxide by the cathodic reduction of dissolved oxygen. Gold was deposited

    Oct 1, 2003

  • CIM
    The GMSG Guideline for Determining the Bond Efficiency of Industrial Grinding Circuits

    By Robert E. McIvor

    "Use of the Bond Work Index to size industrial grinding equipment was widely known. Bond also described its application for measuring grinding circuit efficiency. Bond Work Index efficiency also has b

    Jan 1, 2016

  • CIM
    The Use of Spiral Separators for Iron Ores Concentration (db0e1537-e712-471a-a21c-811cb2e51e56)

    By M. Ye. Shulgina, M. L. Bolotin, S. A. Prokopev, Ye. S. Prokopev

    Iron ores concentration at Russia’s operations is carried out using conventional flow sheets. They comprise the two-four stage grinding followed by one-two stage magnetic separation. This results in t

    Jan 1, 2016

  • CIM
    Preliminary Implementation of a Predictive Control for Ventilation Systems in Metro Stations

    By M. Vaccarini

    In this paper a possible methodology to supplement a predictive control approach is reported. The benefits deriving from the application of a predictive control on complex buildings lay on its capabil

    Aug 1, 2013

  • CIM
    Development of the Americ-Baker Cellular Mineral Thermal Insulating Materials for Buildings

    By W. J. D. Stone

    Discussions with people knowledgeable in the insulating material field revealed that materials on the market would be considerably improved if there was a greater meeting of certain very desirable cri

    Jan 1, 1979

  • CIM
    Fe(III)-As(V) Precipitates Obtained from the Fe(II)-As(V)-SO42--H2O System and Their Leaching Stability

    By Pingchao Ke, Zhihong Liu

    Fe(III)-As(V) precipitates were synthesized from the Fe(II)-As(V)-SO42--H2O system at 90°C in initial Fe(II)/As(V) molar ratios of 4.0 and 5.0, respectively. The synthesis were carried out by introduc

    Jan 1, 2017

  • CIM
    Development of a Heap Biooxidation Process for the Lahoca Refractory Gold Project

    By John Keay, Douglas R. Shaw, Gregory J. Olson

    "The results are presented herein of on-going laboratory investigations of heap bacterial oxidation as a pretreatment method for the recovery of sulfide-encapsulated gold from ore samples of the Rhode

    Jan 1, 1998

  • CIM
    Remote Diagnostic Services for Gearless Mill Drives (7077aae6-0ec3-4fb8-a157-31d67327a195)

    By J. Koponen, K. S. Stadler, A. Fuerst, S. Gaulocher, Th. von Hoff, R. Veldsman

    "Gearless mill drives (GMDs) are the workhorse in the mineral processing industries, more specifically when it comes to grinding crushed ore and cement (in various production stages) in semiautogenous

    Jan 1, 2012

  • CIM
    Life has no Limits. Purifying Water Mined from Asteroids for In Situ Resource Utilization

    By Laura Kelsey

    Contaminant Robust In Situ Water Extractor CRIWE Nafion-based water clean-up Extract purified water from natural extraterrestrial sources In situ water processing for downstream electrolysis

    May 1, 2013

  • CIM
    Upgrading The JK SAG Mill Model

    The original JKMRC AG/SAG mill model was developed over 30 years ago and has been upgraded a number of times since then, with the current published version being the Variable Rates model that is now o

    Jan 1, 2012

  • CIM
    Evcc ?cro

    By CRO CRO

    Elk Valley Coal?s Cheviot Project is located in the Alberta foothills south of the town of Hinton. The mine has been in operation now for the 3 years. The start up and subsequent operation of the Ch

    May 1, 2007

  • CIM
    Evaluation of a new Milling Process for the Caetité-Brazil Uranium Ore

    By L. A. Gomieroa

    The Caetité-Brazil uranium facilities produce about 340 t/y of uranium from an ore averaging 0,25 U %. The process steps are ore crushing, heap leaching with sulfuric acid, U separation and purificati

    Aug 1, 2010

  • CIM
    Biomineral Processing of High Apatite Containing Low Grade Indian Uranium Ore

    By Abhilash

    Uranium is conventionally extracted using a process that employs strong acid (H2SO4) and an oxidant (MnO2) as leaching agents. This method often creates environmental problems, requires large amounts

    Aug 1, 2010

  • CIM
    Upgrading the JK SAG Mill Model (15def195-c5f3-4b60-8363-9a74a9d677d7)

    The original JKMRC AG/SAG mill model was developed over 30 years ago and has been upgraded a number of times since then, with the current published version being the Variable Rates model that is now o

    Jan 1, 2012

  • CIM
    Milling

    By David C. Cook

    The milling complex, situated just east of the Cassiar townsite, receives raw ore from the tramline and processes it into 105,000 tons per year of milled asbestos fibre. The ore is passed through a co

    Jan 1, 1978

  • CIM
    Hydrolysis of Metallic Ions in Mineral Processing Circuits and its Effect on Flotation

    By S. Castro

    Hydrolysis of metallic ions depends on pH and the products of hydrolysis either activate flotation or can lead to inadvertent activation of gangue particles, but can also depress flotation of valuable

    Jan 1, 2017

  • CIM
    Mobile 3D Mapping for Surveying Earthwork using an Unmanned Aerial Vehicle (UAV)

    By Sebastian Siebert

    Unmanned Aerial Vehicles (UAV) as a data acquisition platform and as a measurement instrument have become attractive for many surveying applications in civil engineering. However, their performance is

    Aug 1, 2013

  • CIM
    Interactive 3D Modeling of the Refractory Linings of Vessels for Copper Production

    By A. J. Rigby

    Computer generated, actual-scale furnace models have been imported into a rendering software application to provide for impressively realistic surface features and lighting. When these models are impo

    Jan 1, 2007

  • CIM
    Overcoming Challenges of Rock Mass Characterization for Underground Construction in Deep Mines

    By P. K. Kaiser, F. Amann

    "Rock mass characterization for deep underground construction and mining offers many challenges. This paper first describes some of the key challenges when characterizing highly stressed brittle rocks

    Jan 1, 2015

  • CIM
    Electrochemical Characteristics of Iron Sulfide Minerals in the Presence of SMBS and TETA and the Case for Their Joint Action

    By A. M. L. Cushing, S. Kelebek, A. Ghahreman

    Iron sulfides are part of many ore deposits affecting flotation separation of non-ferrous base metals from them. Open-circuit potential (OCP), potentiodynamic polarization, and electrochemical impedan

    Jan 1, 2017