Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Value added productsBy J. A. E. Bell
"Inco has shifted part of its traditional extractive research effort at its J..Roy Gordon Research Laboratory in Mississauga toward new, value-added products. Most of the effort is being expended on n
Jan 1, 1990
-
Developing a Diamond Deposit in SaskatchewanBy Shawn Harvey
HIGHLIGHTS of STAR DIAMOND PROJECT Initial underground bulk sample 4,048 ct / 25,253 tonnes: US$135/carat: 3,050 ct March 2005 $116 million financing: Newmont takes 9.9% SGF Prefeasibility study
May 1, 2006
-
Synthesis of a-Bromo-Saturated Fatty Acids and Their Collecting Prperties on Quartz MineralBy Binbin Luo, Northeastern University, Chuanyao Sun, Jie Liu, Yimin Zhu, Yanjun Li
"A series of new type collectors a-bromo-saturated fatty acids, CH3(CH2)5CHBrCOOH (a-BHA), CH3(CH2)7CHBrCOOH (a-BDA), CH3(CH2)9CHBrCOOH (a-BLA), CH3(CH2)11CHBrCOOH (a-BMA) were synthesized from satura
Jan 1, 2016
-
Twin Mining?s Diamond Discoveries in Canada?s ArcticBy Hermann A. Derbuch
Twin Mining made a conscious decision when it changed from gold mine explorer and developer to become a diamond explorer in Canada?s Arctic. It was a decision of survival in an environment that saw ju
May 1, 2001
-
Degradation of Copper Solvent Extraction Reagents in the Presence of Nitrate ? Contributing FactorsBy G. Kordosky
The experience of one plant regarding degradation of copper solvent extraction reagents in the presence of 20 to 30 g/1 nitrate in the leach solution was described at Cobre 2003. However, little infor
Jan 1, 2007
-
The Line Creek Operation-an updateBy D. A. Riva
"The Line Creek Project is located in southeastern British Columbia, approximately 25 kilometres north of Sparwood. The design is to produce a total of2.7 million tonnes of coal annually. This is made
Jan 1, 1982
-
From Landmines to Mines and their Logistic Network RisksBy Cesar H. Oboni
The development of specific risk-based methodologies to guide and prioritize clearing decisions in countries contaminated by Unexploded Ordnance and Land Mines (generically defined as Explosive Remnan
May 1, 2010
-
Casing and linepipe steels for sour service applicationsBy L. E. Collins
"In western Canada, many new wells contain a significant fraction of H2S. As well, many older wells become increasingly sour over their operating lifetime. For these reasons, there has been increased
Jan 1, 1998
-
Wheeler River Uranium ProjectBy Dale Verran, Jared Orynik, Chad Sorba, David Bronkhorst
Denison Mines Corp. (“Denison”) has a 90% interest in the Wheeler River Uranium Project (“Wheeler River”) located along the eastern edge of the Athabasca Basin in northern Saskatchewan between the Key
Jan 1, 2020
-
TOUGH-UDEC Simulator for the Coupled Multiphase Fluid Flow, Heat Transfer, and Deformation in Fractured Porous MediaBy J. Lee, K. B. Min, J. Rutqvist
Shear slip of fractures in fractured rock masses is a critical issue for many geological engineering applications, such as the design of underground nuclear waste repositories, enhanced geothermal sys
Jan 1, 2015
-
Research and Mineral ExplorationBy D. R. E. Whitmore, J. M. Harrison
There are five logical stages in the search for orebodies in virgin territory, namely: (1) reconnaissance inventory of geology, and related investigations; (2) development of broad concepts as a basis
Jan 1, 1967
-
Principal Types of Iron-Formation and Derived Ores (c790e046-3ab7-49c9-a5af-9c8aaba2813d)By G. A. Gross
"Nearly 90 per cent of the iron ore produced in Canada is derived from iron-formation or bedded iron deposits. About 70 per cent of this consists of concentrates obtained from iron-formation; another
Jan 1, 1966
-
Geology of North American Palladium Ltd.’s Roby Zone Deposit, Lac des IlesBy M. J. Michaud, M. J. Lavigne
"Abstract - North American Palladium Ltd. operates its Lac des Iles open pit palladium mine 85 km north of the city of Thunder Bay, Ontario. The Roby Zone deposit occurs within the mafic/ultramafic La
Jan 1, 2001
-
GMT: A Spreadsheet-Based Software to Predict Charge Shape and Trajectory in Tumbling MillsBy S. Banisi, M. Maleki-Moghaddam
Direct observation of charge shape and its motion in industrial mills is not possible; therefore, a combination of analytical and physical studies is used to determine charge trajectory. Software pack
Jan 1, 2016
-
Electrical Trends In the 70's and 80'sBy George F. Bassett
"More will be expected from the mine or metallurgical plant electrical system in the late 70's and 80's in terms of energy conservation, reliability and fire prevention. Increased electrical loads 1•e
Jan 1, 1976
-
Développement et Exploitation souterraine Puits PennaBy Jean A. Bastien
Cette présentation décrit les étapes de développement et l?exploitation souterraine au puits Penna chez Agnico-Eagle division Laronde. Les sujets suivants sont touchés : le fonçage du puits, le dévelo
May 1, 2001
-
Environmental Upgrade at the Freeport McMoran Miami SmelterBy Avi Nanda, Robert Brandt, Alex Piatkiewicz, David M. Jones
In 2010 the United States Environmental Protection Agency (UESPA) revised the National Ambient Air Quality Standards (NAAQS) by lowering the permissible value to a 1-hour average SO2 concentration of
Jan 1, 2019
-
Computer modelling limitations and new directions - Part 1By Simon Houlding
"The objective of Part J of this paper is to identify the limitations of the traditional modelling methods and to illustrate, by example, the potential for error created by their application to comple
Jan 1, 1991
-
Spinel direct bonded refractory for copper convertersBy R. A. L. Drew, C. A. Rodríguez González, Caleym W. F.
This work addresses the need of new refractories for copper converters. Technological improvements and environmental regulations for chromium containing refractories have generated this need. Chemical
Jan 1, 2004
-
Development of a Two-Stage Middlings Circuit at Inco's Clarabelle Mill PART 2: On-Site Pilot plant Testwork and Full Plant ImplementationBy A. Bouchard
"Based on laboratory testwork, a two-stage cleaner / re-cleaner circuit with feed regrind was proposed to replace an existing single-stage middling circuit treating a scavenger concentrate at Inco’s C
Jan 1, 2001