    The New Red Lake Mine: Narrow Vein Mining in Deep, Burst-Prone Ground

    By Pierre Rocque

    The Red Lake Mine is located approximately 600 km northwest of Thunder Bay. This 545 tpd (600 tons/day) underground narrow vein gold operation is set to produce in excess of 14.8 tonnes (475,000 ounce

    Oct 1, 2001

  • CIM
    Reduction in Dolomite Contamination in Pine Point Zinc Concentrate

    By D. A. Cormode

    "INTRODUCTIONPine Point Mines, operated by Cominco Ltd., is located approximately 55 miles east of Hay River, N.W.T. by the southern shore of Great Slave Lake.The milling operation commenced in the fa

    Jan 1, 1977

  • CIM
    AFMAG Use in Geological Interpretation

    By C K. Bell, L. S. Collett

    An AFMAG survey was flown in 1968 over the Upper Nelson River area, Manitoba. The flight direction was northwest-southeast and flight spacing was 2 miles. In the Cross Lake Subprovince, AFMAG showed t

    Jan 1, 1971

  • CIM
    New Facilities for Calibrating Gamma-Ray Spectrometric Logging and Surface Exploration Equipment

    By P. G. Killeen

    Proper calibration of portable gammaray spectrometers and spectrometric logging equipment is essential if they are to be used for accurate quantitative determinations of radioelement concentrations. I

    Jan 1, 1978

  • CIM
    Maximizing Ore Extraction at Brunswick Mine

    By Barara Rose

    Presentation Outline ?Introduction of BMS ?Resource Integration Process ?Methodologies ?Tools ?Case Studies ?Zone 01 : 725 SOZ ?Zone 16/17 : 1000 NRP ?Conclusions

    Oct 1, 2010

  • CIM
    Challenges in Niobium Flotation

    By S. Kelebek, C. Gibson, M. Aghamirian

    "Global niobium production is currently dominated by three operating mines, Araxá and Catalão in Brazil, and Niobec in Canada. Although over 90% of the world’s niobium is mined and processed in Brazil

    Jan 1, 2015

  • CIM
    October 28 federal budget's focus on energy-portent for mining?

    By Robert D. Brown, Robert B. Parsons

    "The mining industry may have survived the October 28 federal budget relatively unscathed, but the same certainly cannot be said of the petroleum sector-and many mining men are left wondering if their

    Jan 1, 1981

  • CIM
    Effective Mine Ventilation Management without Compromising Mine Health & Safety and Productivity

    By W. E. Oching, M. M. Ghomshei

    "Collaboration among Ventilation Engineers, Mine Inspectors, worker representatives, health and safety officers and management is key to an effective operational mine ventilation management. Mine vent

    Jan 1, 2019

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike

    By M. Rantapaa

    Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike (TECHNICAL PAPER)

    By R. Mckinstry, M. Rantapaa, T. Bolles

    "Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    The Pogo project: flowsheet development and design

    By Eric Konigsmann

    "The Pogo project is located on the Goodpaster River, 38 miles north of Delta Junction in east central Alaska. Sumitomo Metal Mining and Teck Corporation are planning to develop a 2,500 ton per day un

    Jan 1, 2002

  • CIM
    Circuit Design and Operational Philosophy Related to Custom Gold Ore Processing at Pamour

    By R. D. Lindsay

    Pamour Porcupine Mines, Limited has been actively engaged in the ''Custom Tolling'' of Gold-Bearing materials throughout the past decade. Experience acquired in this area was utilized to design and co

    Jan 1, 1987

  • CIM
    Successful Treatment of Complex Feeds through the Isasmelt™ and Albion Process™

    By S. Nikolic, G. M. Stieper, D. P. Mallah, B. J. Hogg, P. B. Voigt

    Copper feed materials processing is becoming more challenging, due to an incremental increase in the mineralogical and compositional complexity of these feeds. These complex and polymetallic feeds are

    Jan 1, 2019

  • CIM
    The 1/9th Rule - An assessment of the valuation and structure of Canadian exploration agreements 1988-1992

    By L. Kilburn

    A survey of 281 mineral exploration agreements examines the ratios among three ways that may be used to purchase an interest in a mineral property, viz: pay cash, pay shams and make future expenditure

    Nov 1, 2005

  • CIM
    A Comparison of Open Circuit versus Closed Circuit SAG Milling at the Williams Mine

    By David Evans, David Barnes, Robert Raponi

    "The Williams Mine processes, on average, 6,450 t/d of gold bearing ore using two parallel grinding circuits, leaching and C.1.P., carbon stripping, electrowinning and refining. At present, each grind

    Jan 1, 1997

  • CIM
    Recycling of Sm and Co from Magnetic Scraps

    By I. P. Barbosa, P. S. M. Soares, I. O. C. Masson

    "Permanent magnets have been applied extensively to several electronic products such as printers, TV sets, microphones, microcomputers and headphones, presently manufactured in large scale by industri

    Jan 1, 1997

  • CIM
    ntroduction of the Autoloader at Mattagami Lake Mines

    By G Anders

    The mucking out of sub-level headings by slusher and by Autoloader is described, and the performance and costs of both methods are compared. The introduction of the Autoloader is taken as an example t

    Jan 1, 1965

  • CIM
    Milling and Metallurgy at the Moneta Porcupine Mine

    By J. P. Dick

    THIS paper is a description of the milling practice and metallurgy at the Moneta Porcupine mine, Timmins, Ontario. The results obtained with an all-cyanide circuit and later with flotation followed by

    Jan 1, 1941

  • CIM
    Operation Optimization and Capacity Expansion in Jinlong Copper Flash Smelter

    By Z. Jun, L. Kerning

    Jinlong copper smelter and refinery, originally designed for 100,000tpa primary copper and started up in 1997, has been expanding its capacity on the basis of operational optimization and by modifying

    Jan 1, 2007

  • CIM
    Corrosion Control in Canadian Sulphide Ore Mines and Mills

    By W. Dingley, G. R. Hoey

    "Thirteen Canadian sulphide ore mines were surveyed for corrosion control. The mines visited were a small, yet representative, proportion of this segment of the Canadian mining and metallurgical indus

    Jan 1, 1971