Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Future Of Thick Seam Mining-A European View

    Among the various methods of thick-seam mining already well-tried in practice longwall caving with extraction of a single slice, as thick as possible, abandoning the top and/or the bottom coal, se

    Jan 1, 1976

  • AUSIMM
    The Measurement, Evaluation, and Control of Dust and its Effect on the Health of Workers in the Mining Industry in Western Australia

    The medical evaluation of the health effects of dust exposure in the mining industry should be based on the premise that the results of the medical examinations will be considered in relation to t

    Jan 1, 1979

  • AUSIMM
    Mine Planning Succeeds on a Dedicated Minicomputer

    By McDonald E, Clifford PJ

    A mine planning system comprises all elements necessary to carry out the full range of mine planning activities from exploration to operations control. The application of computers as part of a mi

    Jan 1, 1983

  • AUSIMM
    Dry and Wet Sample Recovery in Rotary Percussion Drilling

    An improved method of sample recovery for use with rotary percussion drilling has been developed. Cuttings can be recovered continuously from either dry or wet drilling, and the recovery under dr

    Jan 1, 1976

  • AUSIMM
    Exposure of Underground Mine Personnel and Equipment to Geotechnical Hazards

    By Y Potvin

    Risk assessment in the mining industry is currently a topic of great interest with risk methodologies being increasingly applied beyond the traditional areas of finance and feasibility to analyses of

    Jan 1, 2003

  • AUSIMM
    The Implications of Blast-Induced Movement to Grade Control

    The sole reason for a mine to exist is to extract the finite mineral resource. Accurate grade control is critical to the economics of any mine. If grade control is not optimised, then no matter how go

    Jan 1, 2009

  • AUSIMM
    Feasibility Studies - Scope and Accuracy

    Feasibility is a value improvement process for projects. At any stage in project development, a feasibility study can be undertaken, but although the scope generally remains unchanged the extent of

    Jan 1, 1997

  • AUSIMM
    Modelling Heap Leach Operations with Metsim

    Metsim is proving to be a powerful tool when designing a heap leach operation. The most useful outputs arc determining the fluctuations in pregnant solution recovery rate, make-up water rate, gold r

    Jan 1, 1994

  • AUSIMM
    Combustion of Chalcopyrite Pyrite, Galena and Sphalerite Under Simulated Suspension Smelting Conditions

    A laminar-flow furnace was used to study the combustion of four flotation concentrates (chalcopyrite, pyrite, galena, and sphalerite) in air at temperatures up to 1400¦C. A special- Iv developed tw

    Jan 1, 1980

  • AUSIMM
    Pilot Scale Carbonization of Wallarah Coal using the Parry Process

    A pilot plant has been constructed for the low temperature carboni-zation of Wallarah (N,S,W6) coal at the rate of 300 pounds per hour. The plant was built and tested at Australian Mineral Development

    Jan 1, 1963

  • AUSIMM
    Civil, Criminal and Professional Liability of Experts or ""Caveat Expert""

    By Jackson E

    The general level of awareness amongst members of the professions that they are faced with an increasing number of claims for breaches of their professional duty was dramatically heightened by the d

    Jan 1, 1989

  • AUSIMM
    Laboratory Studies in Comminution - Part II Rod Versus Ball Milling of a Tin Ore

    By Quast K. B

    Laboratory batch rod and ball milling tests were conducted on samples of Heavy Medium Separator (HMS) sinks from Renison Tin Limited. The product size distributions for this heterogeneous material wer

    Jan 1, 1995

  • AUSIMM
    Design of the Melbourne City Link Tunnels

    By S Porter, R Woodall, N Weeks

    Nelsen, Porter and Wilson (1996) provided some preliminary concepts for the design of the Melbourne City Link tunnels. At that time, the City Link project was in the early design phase whereas now it

    Jan 1, 1999

  • AUSIMM
    The Application of GyÆs Formula and Sampling Best Practice at the Snap Lake Phase I Diamond Bulk Sampling Plant

    The Snap Lake Phase I project initiated a subsampling campaign on the material (kimberlite/metavolcanic/granite) mined and treated for diamonds. The campaign was aimed at determining the optimum subsa

    Jan 1, 2005

  • AUSIMM
    Deriving Quantitative Dust Measurements Related to Iron Ore Handling From Airborne Hyperspectral Data

    By P T. Hick, T J. Cudahy, M S. Caccetta

    Dust derived from mining and handling of ore has been identified as a major concern for the mining industry in Australia and may be critical to the future viability of some resource industries (CSIRO,

    Jan 1, 2002

  • AUSIMM
    Performance Testing - When, What and How?

    By E McLean, J Fleay, M Davis

    Performance testing is often used by project owners and financiers to provide protection from, or assessment of, technical aspects of project design, procurement, construction and commissioning. The p

    Jan 1, 2007

  • AUSIMM
    The Mining Industry Needs to be Shaken and Stirred

    By A S. Bamber

    Mining is the oldest industrial practice on the planet with a history dating back over 3000 years. Since the early iron age ores have been extracted for use in a variety of contexts by humankind, from

    Mar 26, 2012

  • AUSIMM
    The Deportment of Environmentally-Sensitive Elements During the Pressure Pre-Oxidation of Refractory Gold Ores

    By Quast K. B, Newell R, Caterford J. H

    The most common reason for gold-bearing deposits being refractory is the presence of sulphides; in many cases these interfering minerals contain arsenic, antimony, or other environmentally-sensitive

    Jan 1, 1991

  • AUSIMM
    NCSC Policy Release No. 149

    Thank you for that introduction and especially thank you to the organisers for inviting me. I've had a considerable interest in this area and I've had the advantage of an education from Nei

    Jan 1, 1989

  • AUSIMM
    How to Get Value Out of Benchmarking

    Benchmarking of mining operations has been in vogue for a number of years: it seems teams are forever flying around the world to try to understand what other operations are doing. However, unless a be

    Jan 1, 2003