Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Phosphorous Removal from Iron Ore with a Low Temperature Heat Treatment

    By R R. Lovel, G J. Sparrow

    Currently there are large reserves of good quality iron ore near to existing infrastructure that are not being developed because the phosphorous levels are above acceptable market specifications. Sinc

    Jan 1, 2009

  • AUSIMM
    Geochemical Mass Balance and Characterisation of Pollutants Draining from a Nickel Mine Site

    By N Dube, K L. Sandvik, C Mutevhe

    Trojan Nickel Mine is the largest producer of Ni, Cu and Co in Zimbabwe. The mine has operated a nickel flotation concentrator and base metal refinery continuously since 1969, creating 28 million tonn

    Jan 1, 2006

  • AUSIMM
    Consolidation and shear strength testing and stability analysis of coal mine spoil degraded to mud

    By L Bergin, D J. Williams, S Islam, T A. Vangsness

    The flooding of open strip coal mines in the Bowen Basin and Hunter Valley Coalfields of Eastern Australia has the potential to soften the spoil and floor materials to produce “mud”. This mud can act

    Jul 23, 2018

  • AUSIMM
    Achieving Better Mine Closure Outcomes for Less Money

    By B Howard, M Jones, D Pershke

    "Current closure objectives and criteria are often difficult to achieve and are not delivering value for money outcomes at closure. Current mine closure processes tend to focus on rehabilitation and r

    Jul 16, 2014

  • AUSIMM
    A New Toolkit for Iron Ore Characterisation

    By E R. Ramanaidou, M A. Wells

    Asian steel mills are demanding iron ore with specific chemical, mineralogical, metallurgical and environmental properties to warrant that the ore is of the greatest quality. As a result, a toolkit of

    Jul 13, 2015

  • AUSIMM
    Advances in the Simulation of Flexible Circuits

    By M M. Hilden, M S. Powell, B Foggiatto

    In an environment of decreasing ore grade, increasing costs and uncertainty with respect to commodity prices, the industry could benefit from evaluating alternative technologies and innovative circuit

    Sep 1, 2014

  • AUSIMM
    Geometallurgy applied to small-scale mining: a case study

    By D Lozada, A Salazar

    Geometallurgy is a tool that, for more than a century, has been present in the implicit operations of mineral beneficiation. There’s a need to understand the characteristics of the material to be proc

    Aug 29, 2018

  • AUSIMM
    Improving flotation hydrodynamics to maximise nickel recovery from tailings

    By M Yvon, S Parkes, K P. Galvin, P Wang

    Mineral liberation is critical to maximise the grade and recovery of nickel, however this objective is challenged considerably by the poor flotation kinetics, especially that of ultrafine particles (K

    Aug 24, 2022

  • AUSIMM
    A Study on the High-Water Solidifying Materials for Gob-Along Roadside instead of Coal Pillars

    By Yin J, Sun H

    A new technology has been introduced - the use of the High-Water Solidifying Material for providing pumped roadside supports to maintain a roadway for re-use in longwall retreating. As a gob edge s

    Jan 1, 1992

  • AUSIMM
    Requirements for Coal in Japanese Coking Blends

    Japanese pig iron production in 1973 registered about 90 million tons. As clearly seen from the productivity (2.04 t/m3/D), and fuel ratio (494 kg/t-pig), the Japanese steel industry has maintained q

    Jan 1, 1975

  • AUSIMM
    Upgrading of Indonesia's Bauxite by Washing Method

    Upgrading of Indonesia's Bauxite by Washing Method There were eight bauxite samples used in this research, three samples from Kijang contain total SiO2 18.36 - 29.16 per cent, Al2O3 40

    Sep 13, 2010

  • AUSIMM
    Effective Use of Mine Waste in the Design of a Residue Storage Facility, Pilbara Region, Western Australia

    By A Wanninayake, E Novello, I Gillani

    A residue storage facility (RSF) was designed to cater for Davidson Creek Area and Robertson Range Area operations under the FerrAus Pilbara iron ore development project in the Pilbara Region, Western

    Aug 12, 2013

  • AUSIMM
    Advances in Copper Solvent Extraction

    The recovery of Copper by solvent extraction was arguably the most significant hydrometallurgical development of the 1960's. However, only dilute solutions at relatively high ph. could be trea

    Jan 1, 1989

  • AUSIMM
    Kalgoorlie Tailings Retreatment Project-'Kaltails'

    The Kaltails Project is situated close to the city of Kalgoorlie-Boulder in Western Australia. Located on the south-eastern fringe of the Golden Mile, Kaltails has been in operation since June 1989. T

    Jan 1, 1992

  • AUSIMM
    Selective Extraction Dynamic Cone Algorithm for Three-Dimensional Open Pit Designs

    By Mogi G, Akaike A, Yamaguchi U

    A new algorithm has been investigated for three-dimensional open pit designs to improve the dynamic cone approach which utilises the dynamic programming technique. The conventional dynamic cone met

    Jan 1, 1995

  • AUSIMM
    Interaction Mechanism of a New Chelating Collector and Copper Sulphide Minerals

    By Falbo A, Quarestima S, Cozza C, Barbaro M

    A new synthetic reagent of the mercaptobenzoxazole class, 5- methyl-2-mercaptobenzoxazole, has been studied. This reagent exhibits powerful selective collecting action towards copper sulphides presen

    Jan 1, 1993

  • AUSIMM
    The Impact of Pile Loading on Adjacent Metro Tunnels – Barangaroo South, Australia

    By P K. Wong, D A. F Oliveira, F M. Azad

    In situations where foundation piles are located in proximity to existing or future tunnels, it is typical for the tunnel owner to require that sleeving of the piles be carried out to at least the inv

    Sep 17, 2014

  • AUSIMM
    Preparing for Automated Sample Preparation

    Preparing for automated sample preparation has two facets; the need for better procedures as seen by the laboratory Manager and the approach to be adopted as envisaged by the equipment manufacturer. B

    Jan 1, 1976

  • AUSIMM
    Will introduction of EoRs improve governance of TSFs in Australia?

    By L Boczek

    The term Engineer of Record (EoR) is commonly used in North America and South Africa to define the responsible person for the design, construction and operational phases of a tailings storage facility

    Jul 1, 2021

  • AUSIMM
    Traffic and Emission Modelling for Surface Roads near the Lane Cove Tunnel Corridor

    The Lane Cove Tunnel (LCT) is an important infrastructure link in New South Wales (NSW) and runs from the end of the Gore Hill Freeway at Artarmon at its eastern extremity, to the end of the M2 at Nor

    Jan 1, 2008