Thermal Modelling and Mitigation Measures for the Bogong Power Development
By D Wimpenny
The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe
Mar 8, 2011
-
The use of collaboration and management to turn-around the performance of a failing copper mine
By M Jacobs
This abstract discusses a heap leach copper mine that was failing to perform and as a result was not meeting targeted production. The mine had numerous technical challenges including: high water inflo
Jun 22, 2022
-
Longwall Mining beneath Critical Infrastructure – Prediction versus Performance of the Cataract Tunnel, New South Wales, Australia
By T J. Sullivan, H Pinkster, G Swarbrick
From 2002 to 2006, longwall mining was undertaken directly beneath the Cataract Tunnel, which is a 100-year-old, heritage-listed tunnel in Hawkesbury Sandstone responsible for delivering 20 per cent o
Nov 5, 2014
-
Hellyer tailings – complex mineralogy but higher grade than many ore bodies
By M Barden, G Lane, B Quilliam
NQ Minerals PLC, through Hellyer Gold Mines Pty Ltd, plans to reprocess the contents of the Hellyer tailings dam to produce lead/silver concentrate, zinc concentrate and pyrite concentrate (containing
Nov 21, 2018
-
Direct observation of the fayalite slag formation behaviour from large SiO2 grains
By S Natsui, Y Goto, S Kawanishi, J Takahashi, H Nogami
The demand for copper increases yearly, and further improvements in copper smelting efficiency using flash furnaces are required. This study was conducted to understand and promote the interfacial rea
Jun 19, 2024
-
Magnetite – A Higher-grade Blast Furnace Feed and Its Potential Benefits for the Ironmaker
By K Edwards, A J. J Mouton
Hematite represents the vast majority of iron ore exported from Australia as the development and processing cost of magnetite is generally seen as a barrier to the development of vast magnetite resour
Jul 13, 2015
-
Critical process design considerations from test work to operations
By A Dennis, T Hunter, R Coleman
For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin
Sep 11, 2017
-
Driving Haulage Productivity Improvements through Industry–Academia Collaboration
By R Thompson, J Miedecke, D Handel, E Tomicek, D Tulloch
"The Mine Haul Road Optimisation Alliance (HROA) is a unique Australian industry–academia collaboration that has been developed to support mine haul road operators. The alliance integrates industry, e
Nov 15, 2016
-
Improving Energy Efficiency Across Mineral Processing and Smelting Operations - A New Approach
By B L. Coulter, E Wightman, A S. Burrows
With their commitment to sustainable development in an increasingly carbon-constrained world, many resources companies are focused on reducing the energy required to create their final products. In pa
Jan 1, 2009
-
Developing Process Control Standards for Optimal Plant Performance at PanAust Limited
By D Baas, D Bennett
This paper describes how Brisbane-based PanAust Limited develops process control strategies that are implemented at all operations and are used in functional descriptions for plant upgrades and new pr
Sep 1, 2014
-
The Economic Advantages of Detailed Geotechnical Assessments for Extraction Sequencing
By A Bennett, S Arndt
Minerals and Metals Group Pty Ltd (Golden Grove Mine) commissioned a comprehensive study of the life of mine using advanced 3D stress modelling. Essential input into the modelling was the proposed min
Mar 24, 2014
-
Perspectives on the Canadian Mining Industry
By D McKeon
In July 2006, ten Mining Engineering students and Associate Professor David Laurence from the University of New South Wales (UNSW) participated in the universityÆs inaugural overseas mining field trip
Jan 1, 2007
-
Automated Mineralogy for Ore Characterisation and Plant Optimisation
By Y Gu, R Fandrich
Traditionally, characterisation of the mineralogy and textures of ore and rock samples were based on observations of hand specimens and thin sections using an optical microscope. The extent of the dat
Jan 1, 2007
-
Friction rock stabiliser QAQC and a process to investigate high pull test failure rates
By R Varden
Friction rock stabilisers, commonly termed ‘Split Sets’, friction rock bolts, or continuous friction coupled bolts are the most widely used rock bolt in the Australian underground metalliferous indust
Mar 29, 2023
-
Empirical mill throughput modelling and linear programming for blend optimisation at the Phu Kham copper-gold operation, Laos
By B Saunders, J Carpenter
PanAust’s Phu Kham copper-gold operation (Phu Kham) in Laos is currently limited by throughput in the Semi Autogenous Grinding (SAG) mill. The ability to accurately predict SAG mill throughput (throug
Sep 20, 2017
-
æShot to ShovelÆ ù Understanding the Impact of Muckpile Conditions and Operator Proficiency on Instantaneous Shovel Productivity
By J Battista, J Grace, I Brunton
The need to better understand and develop strategies to improve instantaneous shovel productivity at the Cadia Hill Open Pit Mine (CHM) instigated the development of the æShot to ShovelÆ project. This
Jan 1, 2004
-
A Platform for Managing and Analysing Atmospheric Data in Underground Coalmines
By S J. Schafrik, Z Agioutantis, E C. Jong, K Luxbacher
Real-time monitoring of mine operating parameters is available at most mines. However, access to these data for an individual operation is typically underutilised by mine managers and technical person
Nov 4, 2015
-
Geomechanical Modelling of the Mount Isa Copper Deposit – Predicting Mineralisation
By R O’Sullivan, D Taylor, J G. McLellan, B Miller
The Mount Isa copper deposit is located adjacent to the city of Mount Isa, Queensland, and lies within a series of Palaeoproterozoic to Mesoproterozoic Superbasins. The deposit is hosted almost entire
Aug 18, 2014
-
Cape Lambert Port B Shiploading, Sampling and Analysis
By M Graham, R Brunning, C Andringa-Bate, S Westergren
In 2010, Rio Tinto Iron Ore’s operations commenced the planning and design of a sampling and analysis system for the new 50 Mt/a Cape Lambert Port B (CLB) facility. Current sampling systems at the por
Jul 29, 2014
-
Biomass and Renewables as Alternative Energy Sources and Reductants in the Minerals Industry
Minerals processing operations use a significant quantity of fossil carbon to provide energy and as reductant. Greenhouse gas emissions from the use of this fossil carbon contribute to the global incr
Jan 1, 2004